Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Read Project

 37

 FINISHED 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Read Project

 43

 FINISHED 

Integrated Arctic observation system (INTAROS)

Start date: Dec 1, 2016, End date: Nov 30, 2021,

The overall objective of INTAROS is to develop an integrated Arctic Observation System (iAOS) by extending, improving and unifying existing systems in the different regions of the Arctic. INTAROS will have a strong multidisciplinary focus, with tools for integration of data from atmosphere, ocean, cryosphere and terrestrial sciences, provided by institutions in Europe, North America and Asia. Sate ...
Read Project

 41

 FINISHED 

Natural Language Programming: Turning Text into Executable Code (NLPRO)

Start date: Aug 1, 2016, End date: Jul 31, 2021,

Can we program computers in our native tongue? This idea, termed natural language programming, has attracted attention almost since the inception of computers themselves. From the point of view of software engineering (SE), efforts to program in natural language (NL) have relied thus far on controlled natural languages (CNL) -- small unambiguous fragments of English with strict grammars and limit ...
Read Project

 1

 FINISHED 

Quantum Information Access and Retrieval Theory (QUARTZ)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Quantum Information Access and Retrieval TheoryWe aim to establish an European Training Network (ETN) on QUantum information Access and Retrieval Theory (QUARTZ). Towards a new approach to Information Access and Retrieval (IAR) addressing the challenges of the dynamic and multimodal nature of the data and user interaction context, QUARTZ aims to educate its Early Stage Researchers (ESRs) to adopt ...
Read Project

 7

 FINISHED 
The SeaDataNet pan-European infrastructure has been developed by NODCs and major research institutes from 34 countries. Over 100 marine data centres are connected and provide discovery and access to data resources for all European researchers. Moreover, SeaDataNet is a key infrastructure driving several portals of the European Marine Observation and Data network (EMODnet), initiated by EU DG-MARE ...
Read Project

 57

 FINISHED 
Chemistry is fundamental to nanotechnology, as chemistry can prepare specifically tailored molecules to serve, in a bottom-up approach, as the building blocks for the fabrication of functional and structured nano-materials. Nanotechnology is the technology of the 21st century with applications from electronics to biotechnology and medicine. The next decade will thus be characterized by an increasi ...
Read Project

 14

 FINISHED 

International Master in Adult Education for Social Change

Start date: Sep 1, 2015, End date: Aug 31, 2020,

...rationTwo years (120 ECTS credits).Brief descriptionIMAESC is a joint master's degree delivered and awarded by the following universities: the University of Glasgow (UK), the University of Malta, the Open University of Cyprus and Tallinn University (Estonia). This programme also has an optional summer school in Penang at the Universiti Sains Malaysia.Adult education has been recognised in Europe a ...
Read Project

 4

 FINISHED 

Next Generation GEOSS for Innovation Business (NextGEOSS)

Start date: Dec 1, 2016, End date: May 31, 2020,

...ibution and exploitation. NextGEOSS engages main providers of Earth Observation data, including Copernicus Collaborative Ground Segments and Core Services. While continuing to support the GEO-DAB and OpenSearch as the middleware components in charge of interconnecting the heterogeneous and distributed capacities contributing to GEOSS, NextGEOSS focuses on a fundamental change to facilitate the con ...
Read Project

 27

 FINISHED 
Current technological demands are increasingly stretching the properties of advanced materials to expand their applications to more severe or extreme conditions, whilst simultaneously seeking cost-effective production processes and final products. The aim of this project is to demonstrate the influence of different surface enhancing and modification techniques on CF-based materials for high value ...
Read Project

 17

 FINISHED 
... virtual and real dimensions. For this, we propose to develop an innovative Up to University (Up2U) ecosystem – based on proven experiences in higher education and big research – that facilitates open, more effective and efficient co-design, co-creation, and use of digital content, tools and services adapted for personalised learning and teaching of high school students preparing for university. W ...
Read Project

 18

 FINISHED 
The networked future promises new relationships between people and artifacts, the private and the public, the individual and the collective. The increased networking capabilities of pervasive technologies mean that of personal data are being produced, analyzed, monetized and connected to other data streams in ways that hold both enormous potential and pose profound challenges for European society. ...
Read Project

 7

 FINISHED 
ISOTIS addresses the nature, causes and impact of early emerging social and educational inequalities in the context of socioeconomic, cultural and institutional processes. The aim is to contribute to effective policy and practice development to combat inequalities. Quasi-panels and pooled longitudinal datasets will be used to examine the variation in early educational gaps and developmental trajec ...
Read Project

 17

 FINISHED 
Recent reports state that the adoption of open-source software (OSS) helps, resulting in savings of about $60 billion per year to consumers. However, the use of OSS also comes at enormous cost: choosing among OSS projects and maintaining dependence on continuously changing software requires a large investment. Deciding if an OSS project meets the required standards for adoption is hard, and keepin ...
Read Project

 12

 FINISHED 

Accelerating data to market (Data Pitch)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

...has driven, directly or indirectly, much of Europe’s economic growth during the last decades as the role of data transitioned from the support of business decisions to becoming a good in itself. An open approach towards data value creation has become critical in the new networked economy, with Europe well placed to nurture this new revolution. However, to date Europe’s data economy has yet to achi ...
Read Project

 4

 FINISHED 

Periodically bent crystals for crystalline undulators (PEARL)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The PEARL project aims at advancing the technologies for manufacturing of high quality Periodically Bent Crystals (PBCr). The PBCr developed in the course of this project will be utilised for the construction of novel light sources of high-energy (hν≥102 keV up to GeV range) monochromatic electromagnetic radiation by means of a Crystalline Undulator (CU) [1]. The technological and experimental par ...
Read Project

 8

 FINISHED 

MUseum Sector Alliance

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The project aims to address the increasing disconnection between formal education and training and the world of work because of the emergence of new job roles due to the quickening pace of the adoption of ICT in the museum sector. Mu.SA addresses directly the shortage of digital and transferrable skills identified in the museum sector and supports the continuous professional development of museum ...
Read Project

 12

 FINISHED 
...s and integrate it into the international knowledge pool. The ROMOR Project aims over the course of three years to build capacity on research output management in four leading PS HEIs by establishing Open Access Institutional Repositories. The training which is required to establish these repositories, and then their implementation, population and management will be the core of the Project. Learni ...
Read Project

 8

 FINISHED 

Accessible Resources for Cultural Heritage EcoSystems (ARCHES)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The popularisation of digitisation techniques has boosted the generation of digital cultural heritage assets in recent years. However, such techniques should not be regarded as an end in and of themselves, but as a means for enabling European citizens to engage with cultural heritage more closely and in different ways. ARCHES aims to create more inclusive cultural environments particularly for tho ...
Read Project

 13

 FINISHED 
In traditional models of manufacturing, the information flow from product design, over production processes, to the manufactured product has been strictly unidirectional. The production equipment “blindly” executes tasks that have no direct relationship to the concepts that are present in the original design models and the product is used with little or no feedback concerning product use patterns. ...
Read Project

 7

 FINISHED 

EUROPLANET 2020 Research Infrastructure (EPN2020-RI)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

The Europlanet 2020 Research Infrastructure (EPN2020-RI) will address key scientific and technological challenges facing modern planetary science by providing open access to state-of-the-art research data, models and facilities across the European Research Area. Its Transnational Access activities will provide access to world-leading laboratory facilities that simulate conditions found on planetar ...
Read Project

 35

 FINISHED 

Brain barriers training (BtRAIN)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

The brain barriers function to protect the central nervous system (CNS) from neurotoxic compounds. By the same traits they unfortunately block delivery of drugs to the CNS thus hindering proper diagnosis and effective treatment of neurological disorders including Alzheimer’s disease and multiple sclerosis. The unusual complexity of the brain barriers has severely hampered progress in the market of ...
Read Project

 11

 FINISHED 
...responsibility, sharing economy, social enterprising, customer-driven small series production (the focus of this call) and emergent or disruptive technologies. With these tools, and supported by an open Associates Programme, TCBL will carry out real-life experimentation and market deployment of a number of Supply Chain, Localisation, Business, Skill Management and Policy innovations involving no f ...
Read Project

 19

 FINISHED 
...ysiological and clinical foundations, to assist in the design and implementation of specific interventions aimed at restoring robustness and delaying the onset of adverse outcomes. The present “Sarcopenia and Physical fRailty IN older people: multi-componenT Treatment strategies” (SPRINTT) project is specifically designed to overcome the existing barriers for an efficient public health interventio ...
Read Project

 27

 FINISHED 
BACKGROUNDThe context of Third Sector organisations is changing fast. Most of the organisations are not very much adapted to the new reality. This situation begs for a change in the management culture and style. New competences are required and in service trainings in all over Europe should adapt. Competences such as Social Innovation, Advocacy, Entrepreneurial Skills, Social Innovation approach, ...
Read Project

 7

 FINISHED 

Astronomy ESFRI and Research Infrastructure Cluster (ASTERICS)

Start date: May 1, 2015, End date: Apr 30, 2019,

ASTERICS (Astronomy ESFRI & Research Infrastructure Cluster) aims to address the cross-cutting synergies and common challenges shared by the various Astronomy ESFRI facilities (SKA, CTA, KM3Net & E-ELT). It brings together for the first time, the astronomy, astrophysics and particle astrophysics communities, in addition to other related research infrastructures. The major objectives of ASTERICS ar ...
Read Project

 24

 FINISHED 
...cales. The sole European underwater glider: SeaExplorer will be modularized, new sensors will be developed, and the operational methodology will be modified, such that new horizons of service will be opened. It will be improved by: 1) adapting for deep basins (up to 5000 m), 2) implementing a novel payload architecture to increase autonomy and to accommodate the range of sensing capabilities neede ...
Read Project

 21

 FINISHED 
In 2013, as a response to rising inequalities, poverty and distrust in the EU, the Commission launched a major endeavour to rebalance economic and social policies with the Social Investment Package (SIP). RE-InVEST aims to strengthen the philosophical, institutional and empirical underpinnings of the SIP, based on social investment in human rights and capabilities. Our consortium is embedded in th ...
Read Project

 19

 FINISHED 
TILOS aims to demonstrate the optimal integration of local scale energy storage in a fully-operated, smart island microgrid that will also communicate with a main electricity grid. The main objective of the project will be the development and operation of a prototype battery storage system, based on NaNiCl2 batteries, provided with an optimum, real-environment smart grid control system and coping ...
Read Project

 17

 FINISHED 
There is a need to find solutions to replace Critical Raw Materials (CRMs) such as Chromium, Nickel, Molybdenium and Vanadium in high volume end consumer products. Steels and superalloys with considerable amounts of these CRMs are widely used in many industrial applications, particularly under extreme conditions where corrosion and wear resistance are needed. It is generally accepted, that interme ...
Read Project

 11

 FINISHED 

Realising an Applied Gaming Eco-system (RAGE)

Start date: Feb 1, 2015, End date: Jan 31, 2019,

...on, and through disseminating RAGE in their partner networks. The game companies in RAGE anticipate adding RAGE-based products to their portfolio, in order to improve their competitive advantage by opening a new product line for applied games and developing new revenue streams.Actual deployment of RAGE results will generate direct impact on the competitive positioning of the few thousand of Europe ...
Read Project

 21

 FINISHED 
Contentious Rights: A Comparative Study of International Human Rights Norms and their Effects on Domestic Social Conflict Over the last 60 years, a broad set of international norms gained importance as instruments to regulate a globalising world. Enshrined in human rights conventions, these norms contribute to strengthen a platform for social mobilization and voice. The introduction of human right ...
Read Project

 1

 FINISHED 
‘Massive Open Online Courses’ (MOOCs) caused a major impact on HEIs worldwide. Business models, target groups, quality standards, certification, sustainability, teaching, delivery & learning methods are all affected. Europe is yet to respond to these emerging trends. Initiatives in the EU exist, but remain isolated, both geographically and per sector. They lack impact on the HEI area as a whole, a ...
Read Project

 11

 FINISHED 

MicroElectronics Cloud Alliance

Start date: Jan 1, 2016, End date: Dec 31, 2018,

... 18 higher education institutions (HEIs) and small and medium enterprises (SMEs) to develop Cloud-based European infrastructure and organisation for education in microelectronics providing a range of open educational resources (OERs), remote access and sharing of educational and professional software, remote and practice-based learning facilities. Neither university can afford the necessary infras ...
Read Project

 18

 FINISHED 

Integrating Learning Analytics and Semantics in Problem Based Learning

Start date: Jan 1, 2016, End date: Dec 31, 2018,

...ct a new educational approach that combines PBL with LA respecting legal and ethical considerations (termed PBL_LA)-design a semantic model for PBL_LA for the annotation of learning resources-adapt open source tools to support PBL_LA and develop an intuitive semantic annotation tool-create relevant, semantically annotated educational materials and perform trials to draw evidence-based conclusions- ...
Read Project

 5

 FINISHED 
Open Data initiatives worldwide are boosting with an aim to increase transparency and contribute to economic growth. With a global annual economic potential value estimated to $3 trillion, this boost seems justified. Current progress however is not satisfactory. We believe a main reason is the lack of relevant skills and competencies. Indeed, currenteducation and training activities are scarce and ...
Read Project

 7

 FINISHED 
...ated in a sample of European academic spin offs working in different sectors of activity (more than 100). Moreover, in order to maximize the impact and sustainability of the final outcomes, a Massive Open Online Course (MOOC) (as well as other Open Education Resources, OER) based on the corporate learning programme on transnational entrepreneurship will be designed to be shared in the Open Educati ...
Read Project

 7

 FINISHED 

Answering Questions using Web Data (WDAqua)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The H2020 work programme aims at increasing citizens’ participation in the digital society and making infrastructures “smart”. These processes are increasingly data-driven. Our central motivation is that sharing, connecting, managing, analysing and understanding data on the Web will enable better services for citizens, communities and industry. However, turning web data into successful services fo ...
Read Project

 6

 FINISHED 
...oal of the ELEvaTE is to provide the EPPL opportunity to learn from partners to achieve ambition of creating a centre of excellence. ELEvaTE will twin EPPL with the Molecular Physics Group at the Open University (OU) in United Kingdom and Nano-Bio-Group at the Institute for Ion Physics and Applied Physics at the University of Innsbruck (UIBK). The OU is exceptional in results dissemination and the ...
Read Project

 3

 FINISHED 

A DIY networking toolkit for location-based collective awareness (MAZI)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Do-It-Yourself networking refers to a conceptual approach to the use of low-cost hardware and wireless technology in deploying local communication networks that can operate independently from the Internet, owned and controlled by local actors. MAZI means “together” in Greek and MAZI [http://mazizone.eu] invests in this paradigm of technology-supported networking, as a means to bring closer togethe ...
Read Project

 9