Search for European Projects

37 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Towards a EU framework for the security of Widezones (ZONESEC)

Start date: Dec 1, 2014, End date: Nov 30, 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Read Project

 19

 FINISHED 
"Innovative processes with streamlining and improved control will be conducted in FIBRALSPEC, through Unit for Continuous PAN-based Carbon Fiber Pilot Production. Testing of laminates and prepregs production based the new developed carbon fibres followed by manufacturing of laminates/coupons and high-performance filament wound tubes are also foreseen (equipment for delivering precise volumes the m ...
Read Project

 11

 FINISHED 
The thermal properties of nanostructured materials are of fundamental importance to modern technology, but at present reproducible metrological definitions, tools and methods do not exist. This is because the mechanisms of heat transport at the nanoscale are entirely different to those at the macro scale.The project will place nanothermal metrology on a solid basis by an integrated physics-based e ...
Read Project

 23

 FINISHED 
The objective of DREAMS is to develop a cross-domain architecture and design tools for networked complex systems where application subsystems of different criticality, executing on networked multi-core chips, are supported.DREAMS will deliver architectural concepts, meta-models, virtualization technologies, model-driven development methods, tools, adaptation strategies and validation, verification ...
Read Project

 16

 FINISHED 

DIAmond Devices Enabled Metrology and Sensing (DIADEMS)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

The DIADEMS project aims at exploiting the unique physical properties of NV color centres in ultrapure single-crystal CVD-grown diamond to develop innovative devices with unprecedented performances for ICT applications. By exploiting the atom-like structure of the NV that exhibits spin dependent optical transitions, DIADEMS will make optics-based magnetometry possible.The objectives of DIADEMS are ...
Read Project

 17

 FINISHED 
The management of crisis is one of the great challenges of the 21st century. The ever growing human, economic and environmental losses due to natural and man-made disasters evidence the need for a systematic approach to the management of crisis. A multi-disciplinary understanding and disaster risk management is required. In such situations, Collaborative Crisis Management (CCM) is usually coordina ...
Read Project

 18

 FINISHED 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Read Project

 18

 FINISHED 

Online and Mobile Communications for Emergencies (SOTERIA)

Start date: Sep 1, 2014, End date: Feb 28, 2017,

The SOTERIA Project aims to research and develop recommendations and an associated toolbox that leverage the positive impact of social media in emergencies, enabling public safety organisations (PSOs) and citizens using new mobile and online social media technologies to communicate before, during and after an emergency event, and exchange critical information for the PSOs' intervention in emergenc ...
Read Project

 20

 FINISHED 
"Intrinsic (or residual) stresses, resulting from manufacturing or processing steps, mostly define the performance and limit the lifetime of nanostructured materials, thin films, coatings and MEMS devices.The established techniques for micron-scale measurement of residual stress still have strong limitations, e.g. in terms of spatial resolution, lack of depth sensing, their applicability on non-cr ...
Read Project

 16

 FINISHED 
Description Process (mix, modulate, synchronise) and detect microwave frequencies based on innovative spin transfer devices.The overarching objective of the MOSAIC project is to bring the device level knowledge acquired in the past years by the partners towards systems as a first crucial step towards industrialization, warranting the lead ...
Read Project

 9

 FINISHED 
Advanced multi-functional computing systems realized in forthcoming manufacturing technologies hold the promise of a significant increase in device integration density complemented by an increase in system performance and functionality. However, a dramatic reduction in single device quality and reliability is also expected.CLERECO research project recognizes early accurate reliability evaluation a ...
Read Project

 11

 FINISHED 
Today more people than ever are threatened by disasters, with no regards if natural or man-made. Furthermore, CBRN contamination risks can occur as a consequence of these events. Regions affected are wider and wider and reconstruction and recovery operations are longer-lasting, costly and complex, especially when decontamination is necessary.DESTRIERO aims at developing a next generation post-cris ...
Read Project

 15

 FINISHED 
The mid-infrared (MIR) region is emerging as the favourite wavelength band for a number of applications, including high sensitivity trace detection, chemical emission monitoring, process control, and biological sensing applications. An efficient way to get precise and reliable information is to rely on spectroscopic analysis and, among the existing technologies, Tunable Diode Laser Spectroscopy (T ...
Read Project

 18

 FINISHED 

CARBON BASED SMART SYSTEMS FOR WIRELESS APPLICATIONS (NANO RF)

Start date: Sep 1, 2012, End date: May 31, 2016,

Description New technologies and new wireless architectures identified as Beyond CMOS and More than Moore From the strategic agendas of ENIAC,EPoSS and ITRS it is evident that wireless applications are gaining more and more importance that results to new requirements in terms of miniaturization an ...
Read Project

 14

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
The objective of the RETHINK big project is to bring together the key European hardware, networking, and system architects with the key producers and consumers of Big Data to identify the industry coordination points that will maximize European competitiveness in the processing and analysis of Big Data over the next 10 years. Specifically, RETHINK big will deliver a strategic roadmap for how tech ...
Read Project

 12

 FINISHED 
Future electronic power devices and packages will need to demonstrate more performance and functionality at reduced cost, size, weight, energy consumption and thermal budget. Further, increasing reliability demands have also to be met by industry to be competitive in this growing multi-billion Euro market of heterogeneously integrated systems.To respond to these challenges, new innovative nano- an ...
Read Project

 18

 FINISHED 
MYCORRAY addresses a need identified by winegrowing sector SMEs for early, reliable, simultaneous identification of the 11 most relevant grapevine trunk fungi responsible for the most harmful diseases of grapevines, with crop losses estimated at thousands of millions of Euros in the EU alone every year.With an estimated commercial price of €1,500 per device and €30 per test, MYCORRAY will allow to ...
Read Project

 12

 FINISHED 

Self adaptive heterogeneous manycore based on Flexible Tiles (FlexTiles)

Start date: Oct 15, 2011, End date: Apr 14, 2015,

Description To develop an energy-efficient programmable heterogeneous manycore platform with self-adaptive capabilities that apply to cognitive radio, video processing, embedded devices and ambient computingA major challenge in computing is to leverage multi-core technology to develop energy-efficient high performance systems. This is cri ...
Read Project

 12

 FINISHED 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Start date: Nov 1, 2011, End date: Dec 31, 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Read Project

 42

 FINISHED 

ELICIT TO LEARN CRUCIAL POST-CRISIS LESSONS (ELITE)

Start date: Jan 1, 2013, End date: Jun 30, 2014,

The objectives of the call with regard to knowledge gathering, categorisation, analysis and evaluation for the goal of post-crisis lessons learning and use of this learning in practice define implicitly the need of a Community of Practice (CoP) for crisis response. Therefore, the ELITE consortium has a strong representation of experienced crisis managers and responders across all phases of crises ...
Read Project

 10

 FINISHED 

Secure and Trustworthy Composite Services (ANIKETOS)

Start date: Aug 1, 2010, End date: May 31, 2014,

The Future Internet will provide an environment in which a diverse range of services are offered by a diverse range of suppliers, and users are likely to unknowingly invoke underlying services in a dynamic and ad hoc manner. Moving from today's static services, we will see service consumers that transparently mix and match service components depending on service availability, quality, price and se ...
Read Project

 21

 FINISHED 

Exploiting dataflow parallelism in Teradevice Computing (TERAFLUX)

Start date: Jan 1, 2010, End date: Mar 31, 2014,

Dataflow parallelism is key to reach power efficiency, reliability, efficient parallel programmability, scalability, data bandwidth. In this project we propose dataflow both at task level and inside thethreads, to offload and manage accelerated codes, to localize the computation, for managing the fault information with appropriate protocols, to easily migrate code to the available/working componen ...
Read Project

 11

 FINISHED 

MIcrowave and TErahertz PHOtonics (MITEPHO)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"MITEPHO (MIcrowave and TErahertz PHOtonics) is an Initial Training Network that seeks to investigate and optimize photonic sources for CW signal generation at Microwave and Terahertz frequencies. The main objective is to integrate these two disciplines, usually addressed separately, through the development of techniques based on the photonic oscillator concept, a rather new technique for generati ...
Read Project

 8

 FINISHED 
COPERNICUS aims to develop compact demultiplexing receivers for 100 Gb/s optical time division multiplexed (OTDM) and wavelength division multiplexed (WDM) signals, based on photonic crystal technology. There is a pressing need for these devices for ultra-high bandwidth data links in server farms, optical storage networks and on-board internet/entertainment systems, where demand is driving the dat ...
Read Project

 9

 FINISHED 
"VITISENS proposes the development of an innovative hand-held device that integrates the three steps for accurate detection of nucleic acids (extraction, amplification and detection) in a single platform with a cost below €1000 + €10/test. This in-field tool will allow non-technical staff to easily detect the Flavescence dorée, the most destructive phytoplasma disease of grapevines. The incidence ...
Read Project

 8

 FINISHED 
Description Synaptic project targets the optimisation of manufacturability and the reduction of systematic variations in nanometer technologiesSynaptic project targets the optimisation of manufacturability and the reduction of systematic variations in nanometer technologies through exploitation of regularity at the architectural, structur ...
Read Project

 8

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 

Guardian Angels for a Smarter Life (Guardian Angels)

Start date: May 1, 2011, End date: Apr 30, 2012,

Guardian Angels (GA) are future zero-power, intelligent, autonomous systems-of-systems featuring sensing, computation, and communication beyond human aptitudes. GA will assist humans from their infancy to old age in complex life situations and environments. Zero-power reflects system-of-systems ability to scavenge energy in dynamic environments by disruptive harvesting techniques. The project prep ...
Read Project

 34

 FINISHED 

SCAlable & ReconfigurabLe Electronics plaTforms and Tools (SCARLETT)

Start date: May 1, 2008, End date: Apr 30, 2012,

"The first generation of Integrated Modular Avionics (IMA1G) has been researched via European funded research projects; PAMELA, NEVADA and VICTORIA. This technology supported a revolutionary step away from federated architectures and their classical bespoke electronics to a modular architecture with common resources. IMA1G was introduced to the market on the A380, A400M and B787 aircraft. IMA1G re ...
Read Project

 39

 FINISHED 

Aligning ResearCh AgenDas In ARTEMIS (ARCADIA)

Start date: Nov 1, 2009, End date: Jan 31, 2012,

There is a clear need for an ambitious pan-European approach to speed up the development of major technologies, by undertaking at the Community level large research actions taking into account National and Regional strategic R&D priorities. In the field of the Embedded Systems, ARTEMIS ETP has paved the way, but the ambition to align the research agendas drawn by the various European National/Regi ...
Read Project

 9

 FINISHED 

Demonstration of ANemometry InstrumEnt based on LAser (DANIELA)

Start date: May 1, 2008, End date: Dec 31, 2011,

"The availability of highly integrated laser and optics technology offer the prospect of increased aircraft Air Data System robustness in adverse conditions. Indeed, although critical, the system is subject to hailstone, icing, corrosion, bird collision, passenger stairs mishandling. Thus the optics technology offers the capability to improve the operational capacity and safety of the air transpor ...
Read Project

 8

 FINISHED 

Materials for Robust Gallium Nitride (MORGaN)

Start date: Nov 1, 2008, End date: Oct 31, 2011,

The MORGaN project addresses the need for a new materials for electronic devices and sensors that operate in extreme conditions, especially high temperature, high electric field and highly corrosive environment. It will take advantage of the excellent physical properties of diamond and gallium nitride heterostructures. The association of the two materials will give rise to the best materials and d ...
Read Project

 24

 FINISHED 

Optically Driven Terahertz Amplifiers (OPTHER)

Start date: Apr 1, 2008, End date: Sep 30, 2011,

This proposal focuses on the development of an application-specific component that works in the Terahertz (THz) regime; in this context, we propose to realize a THz source with innovative features specific for monitoring systems for safety and security. Until now the use of THz monitoring system has been strongly limited due to the very low power and the large dimensions of the existing sources ...
Read Project

 6

 FINISHED 
The INTERESTED project has been built to exactly match the goals defined within the Objective ICT-2007-3.3b "Suites of Interoperable design tools for rapid design and prototyping", namely creating a reference open interoperable embedded systems tool-chain, fulfilling the needs of the industry for designing and prototyping embedded systemsThis project regroups a consortium of leading edge European ...
Read Project

 12

 FINISHED 
The standardisation of the "UML profile for Modeling and Analysis of Real-Time and embedded Systems" (MARTE) in June 2007, has been a great success following a European initiative pushed by CEA LIST, THALES, Cantabria U. and supported at international level by big enterprises like Alcatel-Lucent, IBM, Lockheed Martin, tool vendors like ARTISAN, MathWorks, Mentor Graphics and academics as Carleton ...
Read Project

 4

 FINISHED 

Generic Embedded System Platform (GENESYS)

Start date: Jan 1, 2008, End date: Jun 30, 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Read Project

 25