Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 

STAtionary BAtteries LI-ion safe Deployment (STABALID)

Start date: Oct 1, 2012, End date: Mar 31, 2015,

The development of the Smart Energy Networks is a key priority to facilitate the transition to a more sustainable energy supply in Europe. Li-ion battery is a very promising technology for improving the penetration of renewable energy sources (RES) in the energy mix and enabling a better management of energy in the European grid. The overall objective of the STABALID project is to facilitate the d ...
Read Project

 8

 FINISHED 

Towards Zero Waste in Industrial Networks (ZeroWIN)

Start date: May 1, 2009, End date: Apr 30, 2014,

The first work package will define a common vision on zero-waste entrepreneurship within the first 6 months. The mythos Individual Producer Responsibility will be investigated if it can become the all-healing-solution in electronics industry as well as how this concept can be applied to other industrial sectors. WP2 concentrates on new technological developments, WP3 on waste prevention methodolog ...
Read Project

 33

 FINISHED 

Clean European Rail - Diesel (CleanER-D)

Start date: Jun 1, 2009, End date: Jan 31, 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Read Project

 27

 FINISHED 

High Energy Lithium-Ion Storage Solutions (HELIOS)

Start date: Nov 1, 2009, End date: Oct 31, 2013,

"The reluctance of OEM worldwide to extend electric drive applications to the private customers depends partly from considerations on customer acceptance (limited range in the case of EV, long charging time after depletion of the battery, cost), but also from the increased reliability and life span that private customers are entitled to expect.The first goal of HELIOS project is to evaluate electr ...
Read Project

 22

 FINISHED 
Although the development of nanoparticles-based materials has advanced rapidly in recent years, industrial production techniques have not kept pace. At this point there is a substantial need for safe production facilities, enabling the synthesis of large amounts of metallic nanoparticles with controlled and uniform quality (particle size, particle size distribution, chemical composition, etc.). Th ...
Read Project

 6

 FINISHED 

Materials for high energy accumulators in traction and tools (MAHEATT)

Start date: Apr 1, 2009, End date: Mar 31, 2012,

A.1.2. Project summaryThe overall objective of the MAHEATT project is to develop a prototype cost-effective lithium-ion high energy battery technology with electrode performances well beyond the current state-of-the-art, with automotive applications (hybrid vehicles and electric traction) and hand held tools as application target areas. This will be achieved by innovative synthesis and design of r ...
Read Project

 8