Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 
The Modern2020 project aims at providing the means for developing and implementing an effective and efficient repository operational monitoring programme, taking into account the requirements of specific national programmes. The work allows advanced national radioactive waste disposal programmes to design monitoring systems suitable for deployment when repositories start operating in the next deca ...
Read Project

 28

 FINISHED 
...RATOM Collaborative Project “Cement-based materials, properties, evolution, barrier functions (Cebama)” is developed with the overall objective to support implementation of geological disposal of nuclear waste by improving the knowledge base for the Safety Case. Cement-based materials are highly relevant in this context, being used as waste forms, liners and structural components or sealing materi ...
Read Project

 28

 FINISHED 

MYRRHA Research and Transmutation Endeavour (MYRTE)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MYRTE is to perform the necessary research in order to demonstrate the feasibility of trans ...
Read Project

 28

 FINISHED 
The thermal-hydraulics Simulations and Experiments for the Safety Assessment of Metal cooled reactor (SESAME) project supports the development of European liquid metal cooled reactors (ASTRID, ALFRED, MYRRHA, SEALER). The project focusses on pre-normative, fundamental, safety-related, challenges for these reactors with the following objectives:• Development and validation of advanced numerical app ...
Read Project

 24

 FINISHED 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Read Project

 14

 FINISHED 
...e-trainer strategy. All organised pilot sessions will be open to young and more experienced students and professionals. In this way, ENETRAP III aims to contribute to increasing the attractiveness of nuclear careers and to lifelong learning activities. A web-based platform containing all relevant information about E&T in RP will facilitate an efficient knowledge transfer and capacity building in E ...
Read Project

 14

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 
The coordination action SITEX-II aims at implementing in practice the activities along with the interaction modes issued by the FP7 program SITEX project (2012-2013), in view of developing an Expertise function network. This network is expected to ensure a sustainable capability of developing and coordinating joint and harmonized activities related to the independent technical expertise in the fie ...
Read Project

 18

 FINISHED 

solving CHAllenges in Nuclear DAta (CHANDA)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Read Project

 35

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

...ve (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generation of nuclear installations, linked with SNETP SRA priorities.The ESNII+ project aims to define strategic orientations for the Horizon 2020 period, with a vision to 2050. To achieve the objectives of ESNII, ...
Read Project

 37

 FINISHED 
...ELGRIMM is a 4 year project, addressing Minor-Actinide (MA) bearing fuel developments for Generation IV Fast Reactor Systems to support the Strategic Research Agenda (SRA) of the European Sustainable Nuclear Energy –Technology Platform (SNE-TP). Both options, MA homogeneous recycle in driver fuels with MA content at a few percent, and heterogeneous recycle on UO2 fuels bearing high MA contents, lo ...
Read Project

 12

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

Full Scale Demonstration of Plugs and Seals (DOPAS)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

DOPAS aims to improve the adequacy and consistency regarding industrial feasibility of plugs and seals, the measurement of their characteristics, the control of their behavior over time in repository conditions and also their hydraulic performance acceptable with respect to the safety objectives.This DOPAS project addresses the design basis, reference designs and strategies to demonstrate the comp ...
Read Project

 17

 FINISHED 
Nuclear power issues have been attracting research interest for decades even since the actual use of power reactors using oxide fuels was considered a mature science. It has mainly been due to one of the great drawbacks of nuclear power, the waste handling. Presently, there is a renaissance in nuclear power research focused on a new generation of reactor concepts utilising more of the inherent ene ...
Read Project

 16

 FINISHED 
This proposal aims to close gaps that have been identified in nuclear and radiological preparedness following the first evaluation of the Fukushima disaster. It addresses the call Fission-2010-3.3.1: Update of emergency management and rehabilitation strategies and expertise in Europe. The consortium intends to review existing operational procedures in dealing with long lasting releases, address th ...
Read Project

 50

 FINISHED 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Read Project

 22

 FINISHED 
"FAbrication, Irradiation and Reprocessing of FUELS and targets for transmutation (FAIRFUELS) provides a way towards a more efficient use of fissile material in nuclear reactors with a view to reducing the volume and hazard of high level long-lived radioactive waste, closing the nuclear fuel cycle. In order to contribute to the competitiveness of Europe, the Collaborative Project FAIRFUELS will c ...
Read Project

 12

 FINISHED 

Safe ExploitAtion Related CHemistry for HLM reactors (SEARCH)

Start date: Nov 1, 2011, End date: Apr 30, 2015,

"In accordance with the ESNII roadmap MYRRHA will be the first HLM cooled nuclear system to be deployed in Europe. The SEARCH project aims to support the licensing process of MYRRHA by investigating the safe chemical behaviour of the fuel and coolant in the reactor. The control of the oxygen content and the management of impurities in the melt will be studied. A second critical issue in the safety ...
Read Project

 13

 FINISHED 

REsearch on a CRuiser Enabled Air Transport Environment (RECREATE)

Start date: Aug 1, 2011, End date: Jan 31, 2015,

This proposal is all about the introduction and airworthiness of cruiser-feeder operations for civil aircraft. Cruiser-feeder operations are investigated as a promising pioneering idea for the air transport of the future. The soundness of the concept of cruiser-feeder operations for civil aircraft is explained in the proposal, taking air-to-air refuelling operations as an example. A comprehensive ...
Read Project

 9

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 

Thermal-hydraulics of Innovative Nuclear Systems (THINS)

Start date: Feb 1, 2010, End date: Jan 31, 2015,

For the long-term development of nuclear power, innovative nuclear systems such as Gen-IV reactors and transmutation systems need to be developed for meeting future energy challenges. Thermal-hydraulics is recognized as a key scientific subject in the development of innovative reactor systems. This project is devoted to important crosscutting thermal-hydraulic issues encountered in various innovat ...
Read Project

 24

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 

Supercritical Water Reactor - Fuel Qualification Test (SCWR-FQT)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

...the FQT facility by the Czech regulator shall be the outcome of this project. Pre-qualification of the FQT facility will be carried out in China. Testing of a limited amount of commercially available nuclear grade materials, which are candidates for fuel cladding, will be carried out within this project as well.The European-Chinese team behind this project has been formed during a meeting held in ...
Read Project

 10

 FINISHED 
"The presence of a stratification in a NPP containment is a source of concern, as pockets of hydrogen in high concentration could lead to a deflagration or detonation risk. The objectives of the project are two folds: one is to establish whether in a test sequence representative of a severe accident in a LWR a hydrogen (helium) stratification can be established during part of the transient startin ...
Read Project

 8

 FINISHED 
SITEX aims at identifying the efficient means that should be developed through the establisment of a sustainable expertise function network within a European framework with the view to:- allowing mutual understanding between regulatory bodies, TSOs and waste management organisations (WMOs) on (i) the regulatory expectations at decision holdpoints and (ii) how the scientific and technical elements ...
Read Project

 16

 FINISHED 
...tructural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components will be identified within the project based on the operators’ experience supported by an efficient knowledge ...
Read Project

 21

 FINISHED 

Accurate Nuclear Data for nuclear Energy Sustainability (ANDES)

Start date: May 1, 2010, End date: Oct 31, 2013,

"According to the recent publications of the European Technological Platform for a Sustainable Nuclear Energy (SNETP) (Vision report and Strategic Research Agenda) the sustainability require the combination of the present LWR, future Advanced Fast reactors and the waste minimization in closed cycles with Partitioning and Transmutation. To implement these new nuclear systems and their fuel cycles i ...
Read Project

 21

 FINISHED 

GEn IV and Transmutation MATerials (GETMAT)

Start date: Feb 1, 2008, End date: Oct 31, 2013,

... R&D activities needed to select and characterize (in terms of mechanical behaviour, coolant compatibility and particle irradiation effects) structural materials with required properties for advanced nuclear reactor and transmutation systems. Specific items have been identified and selected in order to focus the proposed project on cross-cutting issues, applicable to more than one system, by takin ...
Read Project

 24

 FINISHED 
The MoDeRn project aims at providing a reference framework for the development and possible implementation of monitoring activities and associated stakeholder engagement during relevant phases of the radioactive waste disposal process, i.e. during site characterisation, construction, operation and staged closure, as well as a post-closure institutional control phase. Monitoring provides operators ...
Read Project

 18

 FINISHED 

Lead-cooled European Advanced Demonstration Reactor (LEADER)

Start date: Apr 2, 2010, End date: Oct 1, 2013,

...ion and to assure high safety standards. Education and Training activities are included in a specific work package where European Universities are directly involved with the aim to grow-up the future nuclear energy designer. The LEADER projects takes strongly into account the others already proposed or on-going EU projects. All projects dedicated to R&D and material developments, projects dedicate ...
Read Project

 17

 FINISHED 
The objective of the proposal is based on the outcome of PATEROS CA to assess more in depth the regional approach to P&T implementation. It will respond to one of the key-topics put forward by the Strategic Research Agenda of SNETP. The project intends to look at the economical aspects of the most realistic scenario for P&T with the hypothesis: limit the MA bearing fuel transport and limit the MA ...
Read Project

 11

 FINISHED 
...roduction of graphite-moderated reactors like Very/High-Temperature Reactors (V/HTR) as a promising Generation IV system candidate. Graphite moderated reactors represent the very first generation of nuclear reactors and therefore need to be decommissioned ahead of other reactor types which evolved later. Presently, accelerated decommissioning of GCR and RBMK and subsequent disposal of i-graphite ...
Read Project

 30

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

...k in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order to optimise the use of the available means and to constitute a sustainable consortium in which common research programmes and a commo ...
Read Project

 45

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 
"As is the case with all nuclear expertise, there is a trend of a decreasing number of experts in radiation protection due to various reasons. On the other hand, current activities in the nuclear domain are expanding: the nuclear industry faces a so-called "renaissance", high-tech medical examinations based on ionising radiation are increasingly used, and research and non-nuclear industry also mak ...
Read Project

 13

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

...nd transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to develop chemical separation processes ...
Read Project

 35

 FINISHED 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Read Project

 20