Search for European Projects

7 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This proposal responds to the first Open Calls issued by the Shift2Rail Joint Undertaking, as part of Shift2Rail Horizon 2020 programme. It specifically addresses the topic S2R-OC-IP5-03-2015: Intelligent freight wagon with predictive maintenance. This topic is complementary with topic S2R-CFM-IP5-02-2015: Start-up activities for Freight Automation. The INNOWAG project will work towards increasing ...
Read Project

 11

 FINISHED 
... and recommendations that will be the basis for future research and investment, increasing the capacities of rail networks in the future.The time used for infrastructure monitoring, maintenance and renewal means ‘down time’. New concepts for low maintenance infrastructure, using standardized and “plug-and-play” concepts will be proposed. Non-intrusive innovative monitoring techniques or self-monit ...
Read Project

 48

 FINISHED 

Viable Wagonload production Schemes (VIWAS)

Start date: Sep 1, 2012, End date: Nov 30, 2015,

...WaS project will follow such a comprehensive approach; therefore aiming at the development ofMarket driven business models and production systems to secure the critical mass needed for SWL operations,New ways for “Last mile” infrastructure design and organisation to raise cost efficiency,Adapted SWL technologies to improve flexibility and equipment utilisation,Advanced SWL management procedures & ...
Read Project

 10

 FINISHED 
"SPIDER PLUS objective is to provide a new 2050 mobility VISION through a Strategic Design & Plan, and a Road Map delivering Sustainable Solutions by then. In such Plan the electrified Rail has a central role both for passengers and freight. The productivity of the available resources supported by ICT and other technologies, is maximized by the combination of infrastructural nodes with spatial and ...
Read Project

 14

 FINISHED 

Make Rail The Hope for protecting Nature (MARATHON)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

MARATHON aims at extracting the maximum productivity from the existing rail infrastructure for producing efficiency, reducing operating costs and attracting new traffic to rail.This represents a market requirement for producing efficiency, reducing operating costs and attracting new traffic to rail. In fact, due to its fragmentation, the railway system efficiency is created through harmonisation a ...
Read Project

 19

 FINISHED 
... two North European, and three Mediterranean Ports are key actors in researching innovative logistics solutions in TIGER. The Inland distributions to/from the Ports are being completely restructured. New production concepts based on Ship to Train operations together with shuttle trains prosecution into Inland Dry ports, are adopted. By doing so, Dry Ports constitute a sizeable extension of the yar ...
Read Project

 19

 FINISHED 
...vestments are costly and take long time to come to fruition. Hence force the need to adopt a realistic mid term strategy for developing the use of freight trains to bridge the gap up to when the new infrastructure investments will be completed delivering the much needed capacity.These goals can be achieved by removing over time the conflict on the same rail tracks between freight and passengers b ...
Read Project

 23