Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 

QUAdrupoleCOrrector (Quaco)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

The full exploitation of the Large Hadron Collider (LHC) is the highest priority of the European Strategy for particle physics. Because of this accelerator Europe is in a leading global position on High Energy Physics research. To preserve that position, the LHC will need a major upgrade in the 2020s to increase its luminosity by a factor of five beyond its design value. The novel configuration, k ...
Read Project

 4

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 
European particle physics groups interested in searching signals of new physics both with neutrinos, at T2K experiment, and at the intensity frontier, with the Belle-II experiment at the SUPERKEKB machine, want to share between them and with KEK laboratory their knowledge in data analysis and detector technologies. Such knowledge sharing will enhance skills and competences of all participants, wil ...
Read Project

 14

 FINISHED 

Super-Kamiokande plus (SKPLUS)

Start date: Dec 1, 2014, End date: Nov 30, 2018,

This proposal is a part of ongoing global efforts to understand the most fundamental elements of matter and their interactions. We aim to investigate neutrino interactions using the existing experimental facility in Japan, the Super-Kamiokande (SK) detector located in the Kamioka Observatory (Gifu Prefecture) and owned by the Partner of this Project: the Institute for Cosmic Ray Research of the Un ...
Read Project

 3

 FINISHED 

effective Container inspection at BORDer control points (C-BORD)

Start date: Jun 1, 2015, End date: Nov 30, 2018,

Efficient NII (non-intrusive inspection) of containerised freight is critical to trade and society. Freight containers are potential means for smuggling (e.g. tobacco), illegal immigration, trafficking of drugs, mis-declared goods and dangerous illicit substances, including explosives, nuclear material, chemical and biological warfare agents and radioactively contaminated goods. One inspection NII ...
Read Project

 19

 FINISHED 

Visegrad Initiative for Nuclear Cooperation (VINCO)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

After a common expression of willingness to cooperate and legal establishment of V4G4 Centre of Excellence Association, VINCO project represents the next stage of capacity building in nuclear technologies in Central European countries. Participating countries defined already their specializations: helium technology in Czech Republic, design and safety analyses in Slovakia, fuel studies in Hungary ...
Read Project

 6

 FINISHED 
The region of the European Union around the Baltic sea especially the countries Estonia, Latvia and Lithuania are not adequately integrated to the European electricity grid. At the end of 2009 Ignalina NPP (Lithuania), which generated ~70-75 % of electricity in Lithuania and supplied electricity to Latvia and Estonia was permanently shutdown leaving the region without nuclear power generation. Lit ...
Read Project

 8

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 

Open Project for the European Radiation Research Area (OPERRA)

Start date: Jun 1, 2013, End date: May 31, 2017,

"Within the OPERRA project, it is proposed that the MELODI Association, as a well-advanced network, takes the lead in establishing the necessary structures able to manage the long-term European research programmes in radiation protection, also taking advantage of the valuable experience gathered through the DoReMi network of excellence. Whilst in fields adjacent to low-dose risk research (radioeco ...
Read Project

 71

 FINISHED 
Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Read Project

 40

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Read Project

 28

 FINISHED 

TAp WAter RAdioactivity Real Time Monitor (TAWARA_RTM)

Start date: Dec 1, 2013, End date: Aug 31, 2016,

The TAWARA_RTM project aims at developing a complete platform to control the quality of the tap water with respect to the radioactivity content. The platform will provide a real time measurement of the activity in the water (measuring the gross alpha and beta activity) to verify whether the distributed water is far from the limits set by the EU legislation (see Directive 98/83/CE of the European C ...
Read Project

 8

 FINISHED 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Read Project

 25

 FINISHED 
The ALLIANCE project focuses on the preparatory phase for developing the ALLEGRO demonstrator. This is based on the Gas Fast Reactor (GFR) concept, one of the 2 alternative systems under the SET-Plan’s European Sustainable Nuclear Industrial Initiative (ESNII), expected to be built in Central Europe. ALLIANCE covers a number of preliminary studies on fuel management, R&D roadmap & infrastructures ...
Read Project

 9

 FINISHED 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Read Project

 22

 FINISHED 

Study of Strongly Interacting Matter (HADRONPHYSICS3)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

The Project promotes the access to five European Research Infrastructures, and it is structured into nine Networking Activities, plus the Management of the Consortium, and fourteen Joint Research Activities.The Project will profit of the success of the previous HadronPhysics project in FP6 and the current HadronPhysics2 in FP7, and originates from the initiative of more than 2.500 European scienti ...
Read Project

 52

 FINISHED 
Key questions in physics can be answered only by constructing a giant underground observatory to search for rare events and study terrestrial and astrophysical neutrinos. The Astroparticle Roadmap of ApPEC/ASPERA strongly supports this, recommending that: “a new large European infrastructure of 100'000-500'000 ton for proton decay and low-energy neutrinos be evaluated as a common design study tog ...
Read Project

 39

 FINISHED 

MODULAR DETECTION SYSTEM FOR SPECIAL NUCLEAR MATERIAL (MODES_SNM)

Start date: Jan 1, 2012, End date: Jun 30, 2014,

"The MODES_SNM project aims to carry out technical research in order to develop a prototype for a mobile, modular detection system for radioactive and Special Nuclear Materials (SNM). To maximize the detection capability for SNM the project will develop new detectors for fast and thermal neutrons, as well as gamma-rays, based on the technology of high pressure scintillation cells using noble gases ...
Read Project

 8

 FINISHED 

European Coordination for Accelerator Research and Development (EuCARD)

Start date: Apr 1, 2009, End date: Jul 31, 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Read Project

 39

 FINISHED 

Study of Strongly Interacting Matter (HadronPhysics2)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

The Project promotes the access to five European Research Infrastructures, and it is structured intop eight Networking Activities, plus the Management of the Consortium, and fourteen Joint Research Activities. The Project represents the continuation of the successful HadronPhysics project in FP6 and originates from the initiative of more than 2.500 European scientists working in the field of hadro ...
Read Project

 46