Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The AIRMES project focusses on optimising end-to-end maintenance activities within an operator’s environment. It will develop and validate an innovative, state-of-the-art, integrated maintenance service architecture that will be a key step in achieving the goal of no technically-induced aircraft operational disruptions in European air traffic. The AIRMES consortium is led by an airline / MRO that ...
Read Project

 12

 FINISHED 

Advanced Landing Gear Sensing and Monitoring (ALGeSMo)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The primary objective of the Advanced Landing Gear Sensing and Monitoring (ALGeSMo) project is to bring together a world-class team from across Europe to deliver a state-of-the-art optically-based load monitoring system for aircraft landing gear. This will yield a step change in the way landing gear is utilised and managed in operational and flight situations, leading to a new paradigm in aircraft ...
Read Project

 5

 FINISHED 

Novel Integration of Powerplant System Equipment (NIPSE)

Start date: Jun 1, 2015, End date: May 31, 2018,

The main objectives of NIPSE are to provide technologies to- reduce Integrated PowerPlant System development time of future aeroengines by 10%- enable the 2 to 3% environmental related gains in fuel burn and reduction in emissions looked at by these new aeroengine architectures (especially Ultra High Bypass Ratio and Open Rotor) through improved aeroengine equipment solutions. The objectives will ...
Read Project

 10

 FINISHED 
This proposal regards designing, building and testing a functional prototype of part of a laminar wing fitted with electro-thermal ice protection (ETIPS) for a business jet. The aim is to show innovation in the use of composite materials for the fixed leading edge, (e.g. Fibre/Metal Laminates), which are thermally efficient, can be manufactured to tight laminar wing tolerances and comparable to a ...
Read Project

 4

 FINISHED 
The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composite ...
Read Project

 33

 FINISHED 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Read Project

 56

 FINISHED 
...ntains some detailed studies on wireless sensing. The sensors will be validated using both laboratory and rig trials to define their performance against specific targets. The project is being lead by Meggitt UK and includes 5 of the EU’s foremost gas turbine manufacturers.
Read Project

 16

 FINISHED 
"The objective of this project is further development, laboratory validation, and demonstration of a microwave clearance measurement system (MCMS) on a SAGE4 GTF demonstrator engine. The system will measure radial running clearances and axial rotor displacements in the low-pressure turbine with the goal of application in a closed-loop Active Clearance Control (ACC) system. The project will first d ...
Read Project

 1

 FINISHED 
"The Piezo institute AISBL (PI) emerged from NoE MIND (Multifinctional & Integrated Piezoelectric Devices). PI is well a functioning non profit organisation with ongoing activities dedicated to support the integration of the fragmented European expertise and deliver innovative educational tools through postgraduate degrees combining materials, technology and device knowledge. It needs, however, t ...
Read Project

 15

 FINISHED 
Cobham will develop and manufacture lightweight carbon fibre reinforced polymer matrix composite test components for the SAGE 4 Geared Turbofan demonstrator. The components will be manufactured from suitable high temperature resistant thermoset resin which is capable of a continuous service temperature of 350°C. Initial working sessions shall be held to review the candidate components and to devel ...
Read Project

 1

 FINISHED 
This proposal concerns flexible materials in the form of high added value smart fabrics/textiles which are able to sense stimuli and react or adapt to them in a predetermined way. The challenge for the European textile industries is to add advanced functions to textiles and the recent progress of new technologies such as electronic inks provide an opportunity for a breakthrough by incorporating ME ...
Read Project

 13

 FINISHED 

valiDation of Radical Engine Architecture systeMs (DREAM)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Read Project

 46