Search for European Projects

5 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

People Centric easy to implement e-mobility (FREE-MOBY)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The FREE-MOBY project is focused to the implementation of easy to deploy micro fully electrical vehicles (450-650kg and speeds up to 90+ km/h)) and city EVs (650-1000kg).By an extra cost of only 15% solar installations in roof houses can be integrated with robust battery packs that can smooth peak powers up to 30%. Solar parking and integrated photovoltaic-battery installations are becoming more a ...
Read Project

 14

 FINISHED 

Premium Low weight Urban Sustainable e-MOBilitY (PLUS-MOBY)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The Plus-Moby project is focused to the implementation of low cost and low energy intensity technologies to manufacture premium four wheel fully electrical micro vehicles (450-650kg and speeds up to 90+ km/h)) that can be upgraded to M1 configurations.•Technologies and methodologies developed in previous calls of the EU Green Car will be implemented in terms of low aero-drag and safe structural ...
Read Project

 10

 FINISHED 

Global Opportunities for SMEs in Electro-Mobility (GO4SEM)

Start date: Sep 1, 2013, End date: Aug 31, 2015,

Europe has successfully extended its competencies in key enabling technologies for electric mobility in recent years, especially in the field of information and communication technologies, components and systems. Small and medium size companies have played a crucial role as sources of creativity at all stages of the supply chain. Given the new supply chains for electric mobility being established ...
Read Project

 13

 FINISHED 
AVTR addresses the development of the complete Electrical powertrain optimised as a whole of systems:- Energy saving in pure urban drive up to 20% with respect to state of-the-art fixed transmission ratio,- Avoid the use of Permanent Magnet Motors because non optimal elements when integrated in a multi ratios transmission PWT. When designing for energy savings, the maximum efficiency is calculate ...
Read Project

 8