Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Read Project

 14

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 
SCINTILLA aims at building an innovative comprehensive toolbox of devices and best-of-breed technologies for the enhanced detection and identification of difficult to detect radioactive sources and nuclear material:• Dealing with the challenge of masked and shielded material• Developing effective solutions, which are reliable, portable / mobile and cost effective• Finding a reliable replacement fo ...
Read Project

 10

 FINISHED 
OPTS project aims at developing a new Thermal Energy Storage (TES) system based on single tank configuration using stratifying Molten Salts (MS, Sodium/Potassium Nitrates 60/40 w/w) as heat storage medium at 550°C maximum temperature, integrated with a Steam Generator (SG), to provide efficient, reliable and economic energy storage for the next generation of trough and tower plants.The three-year ...
Read Project

 11

 FINISHED 
"SILER is a Project aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures.The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events and tsunamis) and to the identification of mitigation strategies, acting both on structures/com ...
Read Project

 18

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22