Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 
X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Read Project

 22

 FINISHED 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Read Project

 22

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 
MERLIN’s main aim and purpose is to investigate and demonstrate the viability of an integrated management system to achieve a more sustainable and optimised energy usage in European electric mainline railway systems.MERLIN will provide an integrated optimisation approach that includes multiple elements, dynamic forecasting supply-demand scenarios and cost considerations to support operational deci ...
Read Project

 20

 FINISHED 
The axle bearing damage process has safety and economic implications on the exploitation of railways systems, as proved by the selection of this topic for inclusion in the present call for research proposals of the FP7 of the EU. Axle bearing damage has been the object of intense attention by railway operators and transportation authorities, leading to a variety of approaches and systems currently ...
Read Project

 18

 FINISHED 
"In a context of wide use of transport, it is necessary to increase efficiency of the different transport modes as well as their interaction. To that effect, rail transport will play an important role in the future by increasing its capacity. Thus, it would be necessary to strength the competitiveness of railway ensuring a sustainable, efficient and safe service.In that sense, it is essential to i ...
Read Project

 9

 FINISHED 
"A sustainable and efficient freight transport in Europe plays a vital role in having a successful and competitive economy. Freight transport is expected to grow by some 50 % (in tonne-kilometres) by 2020. However rail has, in many areas, been displaced from a dominant position as road transport services have grown and developed in capability and levels of sophistication that have not been matche ...
Read Project

 31

 FINISHED 

Wireless Railway Condition Monitoring (WIRAILCOM)

Start date: Nov 1, 2012, End date: Oct 31, 2014,

Railway operators rely on remote condition monitoring (RCM) of assets to enable continued safety and efficiency. It is not currently cost effective to monitor every asset; some vehicle systems, such as freight trains, use no technology and are therefore difficult to add modern electronic systems to. There are neither the power systems nor the data systems available to link a new monitoring system ...
Read Project

 7

 FINISHED 
D-RAIL will focus on freight traffic, identifying root causes of derailment of particular significance to freight vehicles, which have a wider range of operating parameters (as a result of the huge range in loads, speeds and maintenance quality) than passenger vehicles. One key question that will be studied is how independent minor faults (e.g., a slight track twist and a failing bearing) could co ...
Read Project

 22

 FINISHED 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Read Project

 31

 FINISHED 
"EURAXLES is a 3 year R&D project uniting 23 partners across Europe including 6 axle manufacturers, 4 railway operators/IMs, 2 system integrators, 3 technology suppliers, 5 universities, 2 rail sector associations and 1 consulting firm. The consortium is well-positioned to provide a common R&D approach to axle design, protection, inspection and maintenance which will have an impact on standards, r ...
Read Project

 24

 FINISHED 
"Rail traffic has increased much in the last decade. This development and the need for model shift from road to rail to decrease CO2 emission, creates a challenge for the railway industry to improve capacity in the network while the need of capacity for maintenance also increases.The challenge of the project is to do more effective inspection and maintenance in less time.Therefore the project focu ...
Read Project

 18

 FINISHED 

ERRAC Road Map

Start date: Jun 1, 2009, End date: Jul 31, 2012,

...ransport operations.ERRAC-ROADMAP will deliver the ROADMAPS to guide the rail research in order to provide a rail option that is reliable, environmentally friendly, efficient and economic to customers. The ROADMAPs themselves will address the issues, stakeholders and subjects to be considered when addressing the activities in the task, such as:• Holistic rail strategies for the minimisation of ope ...
Read Project

 21

 FINISHED 
The environmental, societal, and economic drivers of an efficient urban transport system are well acknowledged and are reflected in the local transport plans of all major urban areas. The overall concept of the project is to facilitate the achievement of this goal by generating solutions to currently identified barriers that form the project imperatives, which have been established through close c ...
Read Project

 16

 FINISHED 

INtegrated European Signalling System (INESS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Read Project

 31

 FINISHED 
"Contributing to the European Research Area in surface transport to strengthen the competitiveness of the European surface transport sector. This will be achieved by using the excellent EURNEX competence to provide research excellence capabilities to European Small and Medium Size Enterprises (SMEs). Furthermore the cooperation with research excellencies from non EU countries will stimulate resear ...
Read Project

 29