VINEYARD will develop an integrated platform for energy-efficient data centres based on new servers with novel, coarse-grain and fine-grain, programmable hardware accelerators. It will, also, build a high-level programming framework for allowing end-users to seamlessly utilize these accelerators in heterogeneous computing systems by using typical data-centre programming frameworks (e.g. MapReduce, ...
Read Project

 11

 FINISHED 
The data generated in the health domain is coming from heterogeneous, multi-modal, multi-lingual, dynamic and fast evolving medical technologies. Today we are found in a big health landscape characterized by large volume, versatility and velocity (3Vs) which has led to the evolution of the informatics in the big biodata domain. AEGLE project will build an innovative ICT solution addressing the who ...
Read Project

 14

 FINISHED 
To handle the stringent performance requirements of future exascale High Performance Computing (HPC) applications, HPC systems need ultra-efficient heterogeneous compute nodes. To reduce power and increase performance, such compute nodes will require reconfiguration as an intrinsic feature, so that specific HPC application features can be optimally accelerated at all times, even if they regularly ...
Read Project

 10

 FINISHED 

Self-Organising, Self-Managing Heterogeneous Cloud (CloudLightning)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

Currently cloud infrastructures are mostly homogeneous -- composed of a large number of machines of the same type -- centrally managed and made available to the end user using the three standard delivery models: Infrastructure-as-a-service (IaaS), Platform-as-a-Service (PaaS) and Software-as-a-Service (SaaS). As clouds increase in size and as machines of different types are added to the infrastruc ...
Read Project

 8

 FINISHED 
One of the main problems the CPS designers face is “the lack of simulation tools and models for system design and analysis”. This is mainly because the majority of the existing simulation tools for complex CPS handle efficiently only parts of a system while they mainly focus on the performance. Moreover, they require extreme amounts of processing resources and computation time to accurately simula ...
Read Project

 8

 FINISHED 
The growing number of fine-granular data streams opens up new opportunities for improved risk analysis, situation and evolution monitoring as well as event detection. However, there are still some major roadblocks for leveraging the full potential of data stream processing, as it would, for example, be needed the highly relevant systemic risk analysis in the financial domain.The QualiMaster projec ...
Read Project

 5

 FINISHED 
...anageability, ease of deployment and resilience will be greatly improved.The project brings together key European technology companies (ST Microelectronics and ARM) and high-potential SMEs (Maxeler and Vosys) who see a timely opportunity to develop self-adaptation and virtualisation technologies to deliver a new generation of HSAs. These architectures will be a passkey for entering the market with ...
Read Project

 7

 FINISHED 

Programming Large Scale Heterogeneous Infrastructures (POLCA)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

Description A new mathematically based methodolgy for the development of heterogeneous systemsThe execution speed of processors has not increased since roughly 2006. To cope with the ever growing demands, computers are nowadays essentially an integration of multiplecomputers, called multi-core processors. However, most software has been d ...
Read Project

 8

 FINISHED 
The dominant approach in offering cloud services is based on homogeneous commodity resources: large numbers of inexpensive machines, interconnected by off-the-shelf networking equipment, supported by stock disk drives. This is consistent with the predominant business model for data centre cloud computing, which leverages homogeneous computation, communication, and storage to provide low-cost appli ...
Read Project

 6

 FINISHED 
...n 3 years' time when both, the initial purchase as well as the operating costs are taken into account.The participation of ST Microelectronics, the world's fifth largest semiconductor company, and of Maxeler and Synelixis, two high-potential SMEs ensure that the FASTER tool flow will be designed, tested and evaluated in a close collaboration with the engineers that will eventually use it. The resu ...
Read Project