Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The European lighting industry aims at reducing cost, at continuously improving product performance while reducing time to market and enlarging the product. The main challenge for the design in of LED components into lighting systems is the temperature and current dependence of their performance. In order to achieve a good design of LED systems, a modular, multi-physics based modelling approach is ...
Read Project

 15

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

THINGS2DO (THINGS2D0)

Start date: Jan 1, 2014, End date: Jan 1, 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Read Project

 44

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

e-Justice Communication via Online Data Exchange (e-CODEX)

Start date: Dec 1, 2010, End date: May 31, 2016,

The goal of the e-CODEX project is to improve the cross-border access of citizens and businesses to legal means in Europe as well as to improve the interoperability between legal authorities within the EU.Due to high mobility and European integration, procedures containing cross-border effects are increasing. These procedures require cooperation between different national judicial systems.Indeed, ...
Read Project

 23

 FINISHED 
"ICT-based service and product innovation is curtailed by the growing vertical chain of dependence on poorly interoperable proprietary technologies in Europe. This issue was identified to have high impact on European innovation productivity by the Report of the Independent Expert Group on R&D and Innovation, commonly known as the Aho-report. The report demanded incentives for the convergence of sh ...
Read Project

 28

 FINISHED 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Read Project

 31

 FINISHED 

Prototyping Internet Lot of Things Software (PILOTS)

Start date: Oct 1, 2014, End date: Mar 31, 2015,

...in their prototyping flow. According to state of the art and technical analysis with CEA and Fraunhofer, no such solution is available today; as a long time provider of hardware integration platform, Magillem has been a pioneer in design environment software for SoC integration and SoC virtual platform since its early days and believe to be in a unique position to introduce a very innovative solut ...
Read Project

 1

 FINISHED 

Verification for heterogeneous Reliable Design and Integration (Verdi)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

Systems of Systems (SoS) are heterogeneous whereby the functionality more and more rely on the interaction and interoperability between the analogue/mixed-signal (AMS), digital electronics, software and other physical domains.To achieve the required reliability, robustness and quality of SoS, mastering the heterogeneous behaviour across domains is the most essential part during the development pro ...
Read Project

 8

 FINISHED 

Trusted Computing for European Embedded devices (TOISE)

Start date: Jan 1, 2011, End date: Dec 1, 2013,

...s will be actually a effort from major European semiconductor, fables and foundry players (Austriamicrosystems, Atmel, Infineon, Numonyx, NXP and STMicroelectronics), four IP providers (Intrinsic-ID, Magillem, Secure IC, Virage Logic) for PUF and secure IP infrastructure, two SME experts in Security solutions or evaluation labs (Brightsight, Fox-IT), five SME experts in Power line communications ( ...
Read Project

 19

 FINISHED 
The competitive edge of the European industry in the embedded systems domain is an enabler to achieve a leading position in the growing global market of safety-relevant embedded systems. The main success factors in this context will be the ability to understand the key reasons for the huge increase in cost and development time, and to adopt efficient methods and processes for development of these ...
Read Project

 24

 FINISHED 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Read Project

 15