Search for European Projects

3 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Technology CAD for III-V Semiconductor-based MOSFETs (III-V-MOS)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

According to ITRS, III-V compound semiconductor n-type MOSFETs will reach production in 2018 as part of a new scaling scenario for high performance at very low voltage. The present lack of dependable TCAD models for the early stages of industrial development is a hindrance to benefit from the cost saves and time to market reduction that TCAD is recognized to deliver. To bridge this gap, III-V-M ...
Read Project

 11

 FINISHED 

Energy Efficient Tunnel FET Switches and Circuits (E2SWITCH)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

E2SWITCH focuses on Tunnel FET (TFETs) as most promising energy efficient device candidates able to reduce the voltage supply of integrated circuits (ICs) below 0.25V and make them significantly more energy efficient by exploiting strained SiGe/Ge and III-V platforms, with CMOS technological compatibility. A full optimization and DC/AC benchmarking for complementary n- and p-type TFETs, integrated ...
Read Project

 11

 FINISHED 
Description European Union Research Initiative Aims to Increase 
Electronic Device Efficiency by 10x and Eliminate Power Consumption of Devices in Standby Mode STEEPER addresses the development of Beyond CMOS energy-efficient steep subthreshold slope transistors based on quantum mechanical band-to ...
Read Project

 14