Search for European Projects

5 European Projects Found

Searched on 125080 European Projects

 FINISHED 
EcoShopping project aims to build a holistic retrofitting solution for commercial buildings to reduce primary energy consumption down to less than 80kWh/m2 per year and increase the share of RES (Renewable Energy Sources) more than 50% compared to the state of the art. The approach will be systemic by developing (1). Novel thermal insulation solutions using cost effective materials to further redu ...
Read Project

 17

 FINISHED 

ENERGY EFFICIENCY FOR EU HISTORIC DISTRICTS SUSTAINABILITY (EFFESUS)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

Europe can become the leader in CO2 emission reduction by applying innovative solutions to its built cultural heritage. According to the European Recovery Plan one of the actions that needs to be taken to tackle the current crisis, is investing in energy efficiency. Historic urban buildings consume 4% of all energy and are responsible for 3% of CO2 emissions. Therefore, improving energy efficiency ...
Read Project

 27

 FINISHED 

ENERGY EFFICIENT DEMO MULTIRESIDENTIAL HIGH RISE BUILDING (EE-HIGHRISE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

The overall objective of the project is to demonstrate and validate new technologies, concepts, and systems used in EE-HIGHRISE project, in order to test and assess the technological and economical feasibility of innovative energy solutions in high rise demo building Eco Silver House. Demo high rise building Eco Silver House is located in the city centre of Ljubljana. The net total area covers the ...
Read Project

 10

 FINISHED 
Government authorities, restoration architects and conservation scientists have always had to face the problem of deterioration of historic building materials, in particular stone, wood and glass; an issue that has become more and more urgent since climate change has worsened natural decay and the impact of atmospheric pollution. In addition in recent years socio-economic requirements have claimed ...
Read Project

 14

 FINISHED 
The refurbishing to an energy efficient standard leads to tight buildings (whole envelope: windows, walls, etc.) and affects the indoor climate. In case of refurbishing the inhabitants or users are not adapted to this new situation. Therefore the air exchange rates could be lower than required if no mechanical ventilation is installed or the system performance is not optimised. Then, in trying to ...
Read Project

 15