Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Read Project

 39

 FINISHED 

RISE Women with disabilities In Social Engagement (RISEWISE)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

Women with disabilities have more difficulties to find an employment and to integrate in social day life activities than men with disabilities.This project focuses on the collective of women with disabilities from different perspectives, trying to identify needs and best practices in several EU countries, representing different cultural and socio-economic environments, for the integration and impr ...
Read Project

 14

 FINISHED 

Preventing and mitigating farmed bivalve diseases (VIVALDI)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

The overarching goal of VIVALDI is to increase the sustainability and competitiveness of the European shellfish industry by improving the understanding of bivalve diseases and by developing innovative solutions and tools for the prevention, control and mitigation of the major pathogens affecting the main European farmed shellfish species: Pacific oyster (Crassostrea gigas), mussels (Mytilus edulis ...
Read Project

 21

 FINISHED 

Integrated Activities for the High Energy Astrophysics Domain (AHEAD)

Start date: Sep 1, 2015, End date: Feb 28, 2019,

We propose a set of integrated Activities in the High Energy Astrophysics Domain (AHEAD) in response to the INFRAIA-2014-2015 call Research Infrastructures for High EnergyAstrophysics.The overall objective of AHEAD is to integrate national efforts in high-energy Astrophysics and to promote the domain at the European level, to keep its community at the cutting edge of science and technology in this ...
Read Project

 26

 FINISHED 

Technology Enhanced Learning of Musical Instrument Performance (TELMI)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Learning to play a musical instrument is mostly based on the master-apprentice model in which the student’s interaction and socialization is often restricted to short and punctual contact with the teacher followed by long periods of self-study resulting in high abandonment rates. In such a learning model, modern technologies are rarely employed and almost never go beyond audio and video recording. ...
Read Project

 6

 FINISHED 

Knowledge Alliance for Advanced Urbanism

Start date: Nov 1, 2015, End date: Oct 31, 2018,

European cities are becoming living laboratories where industries carry on pilot projects to experiment new devices, all kind of sensors and online information and communication systems. The involvement of universities and research centres in this process is still limited. The increasing availability of data that comes from city sensors, creates new opportunities not just for monitoring and manage ...
Read Project

 11

 FINISHED 
Underwater operations (e.g. oil industry) are demanding and costly activities for which ROV based setups are often deployed in addition to deep divers – contributing to operations risks and costs cutting.However the operation of a ROV requires significant off-shore dedicated manpower – such a setup typically requires a crew consisting of: (1) an intendant, (2) an operator, and (3) a navigator. Thi ...
Read Project

 7

 FINISHED 
Cardiovascular disease (CVD) mortality and morbidity is predicted to increase in Europe and worldwide in the next decades due to aging and the rise of diabetes and obesity. The link between metabolic and inflammatory disease is getting stronger, raising hopes for novel therapeutic targets to be exploited clinically. Clinical evidence generated by the Academic partners of the Athero-B-Cell Consorti ...
Read Project

 11

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 
CALOHEE addresses the next necessary steps for implementing student-centred competence-based higher education. It will provide the tools European Higher Education Institutions need to design and deliver degree programmes that actually prepare learners for their future professions and citizenship, while enhancing their personal culture.CALOHEE builds on what has been accomplished over the past fift ...
Read Project

 20

 FINISHED 
FABRIC addresses directly the technological feasibility, economic viability and socio-environmental of dynamic on-road charging of electric vehicles.FABRIC responds to the need to assess the potential and feasibility of a more extensive integration of electric vehicles in the mobility and transportation system, focusing primarily on dynamic wireless charging which would allow practically all of th ...
Read Project

 27

 FINISHED 
Architecture as an education, a discipline and a profession has to redefine and release its potential for problem-solving and innovation within a new economic and societal context. This new normal implies that the knowledge basis, teaching methods and role models transferred in architectural education have to be adapted to a new reality. There is a strong demand for diversification both in archite ...
Read Project

 10

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
R2CITIES aims to develop and demonstrate an open and easily replicable strategy for designing, constructing, and managing large scale district renovation projects for achieving nearly zero energy cities. For this purpose, it will be developed a demonstration and dissemination framework of very innovative strategies and solutions for building energy renovation at district level, based in the follow ...
Read Project

 16

 FINISHED 
"The project aims at developing reliable predictive models to estimate long-term (i.e. > 20 kh) performance and probability of failure of SOFC stacks based on existing materials and design produced by the industrial partners. This will allow the realization of stacks with extended service intervals and reduced maintenance cost with respect to the present stack technology. The extension of service ...
Read Project

 12

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Read Project

 27

 FINISHED 
Growing investments in distributed energy resources (DER) – renewable distributed energy generation combined with demand response, energy storage, plug-in electric vehicles and active management of distribution networks – will require new business and technology platforms to manage the increased level of diversity and complexity of global energy management. The increasing variability of both gener ...
Read Project

 14

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

FIBERS INNOVATIVE BURNING AND REUSE BY SHS (LIFE FIBERS)

Start date: Jul 1, 2013, End date: Jul 1, 2016,

Background Following the decision to ban the use of asbestos in construction, the question of what to do with increasing amounts of fibre-bearing waste has become an environmental priority. Several methods have been proposed for the disposal of materials containing asbestos (complete removal, insulation by resin coating or encapsulation). Techniques for m ...
Read Project

 3

 FINISHED 
Pancreatic ductal adenocarcinoma (PDAC) causes 34000 deaths in the EU every year. Conventional cancer treatments have close to no impact on this disease. As a result, almost all patients diagnosed with PDAC develop metastases and eventually die. Given this poor outlook, the search for new therapeutics is mandatory. These will have to target relevant cancer pathways and be designed based on the ava ...
Read Project

 12

 FINISHED 
PHARMA-COG aims to develop a new integrated model to accelerate the development of drug cindidates for MS, PKD and AD. The innovation relies on a 'multidimensional matrix' approach, integrating all available and renewed inputs (biomarkers/animal, human models/physiological and pharmcological challenges, Phase 0/1/1b to reduce the attrition rate, to allow an early and pertinent GO/NOGO decision bef ...
Read Project

 38

 FINISHED 

Achieve QUieter Oceans by shipping noise footprint reduction (AQUO)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

Recent directives outline the need to mitigate underwater noise footprint due to shipping, to prevent negative consequences to marine life. In that context, the final goal of AQUO project is to provide to policy makers practical guidelines, acceptable by shipyards and ship owners. The list of solutions will be split into solutions regarding ship design (including propeller and cavitation noise), a ...
Read Project

 13

 FINISHED 
"AFTER project addresses the challenges posed by the need for vulnerability evaluation and contin-gency planning of the energy grids and energy plants considering also the relevant ICT systems used in protection and control.Project emphasis is on cascading events that can cause catastrophic outages of the electric power systems.The main addressed problems are related to high impact wide spread mul ...
Read Project

 14

 FINISHED 
The nSHIELD project is, at the same time, a complement and an improvement of “pSHIELD”, a pilot project funded in ARTEMIS Call 2009 as the first investigation to build the SHIELD Architectural Framework for SPD. The roadmap proposed in this pilot project aims at addressing Security, Privacy and Dependability (SPD) in the context of Embedded Systems (ESs) as “built in” rather than as “add-on” funct ...
Read Project

 24

 FINISHED 
The ambition of this project is to enable the utilisation of the full potential of renewable energy (up to covering 100% of the energy demand on district level). In order to reach this goal, the E-hub concept is developed, which is crucial for the implementation of such a large share of renewables. An E-Hub is a physical cross point, similar to an energy station, in which energy and information st ...
Read Project

 19

 FINISHED 
"High-T fuel cells like the MCFC are the best candidate for exploiting cleanly & efficiently non-conventional fuels of organic or waste-derived origin that are one of the keys to a sustainable energy infrastructure & have very strong potential, but the degradation caused by the contaminants in these fuels must be addressed. MCFC-CONTEX aims to tackle this problem from 2 sides: 1) investiga ...
Read Project

 11

 FINISHED 

Low Emission Gas Turbine Technology for Hydrogen-rich Syngas (H2-IGCC)

Start date: Nov 1, 2009, End date: Apr 30, 2014,

The overall objective of this project is to provide and demonstrate technical solutions which will allow the use of state-of-the-art highly efficient, reliable gas turbines in the next generation of IGCC plants, suitable for combusting undiluted hydrogen-rich syngas derived from a pre-combustion CO2 capture process, with high fuel flexibility. The recognised challenge is to operate a stable and co ...
Read Project

 25

 FINISHED 
"The two core objectives of BIVALIFE are (i) to provide innovative knowledge related to pathogens infecting oysters and mussels and (ii) to develop practical approaches for the control of infectious diseases and resulting mortality outbreaks these pathogens induce. The project will address the major issue identified by the European commission (i.e. detection and management of infectious diseases i ...
Read Project

 12

 FINISHED 
"The project ENDORSE aims at a user-driven development of downstream services in renewable energies by exploiting the GMES Core Services (MACC, SAFER and Geoland 2) together with other EO/in-situ data and modelling. It addresses regional services promoting the energy use from sun, wind, and biomass, electricity grid management and building engineering through daylighting in buildings. The consorti ...
Read Project

 11

 FINISHED 

Sponge Enzymes and Cells for Innovative AppLications (SPECIAL)

Start date: Dec 1, 2010, End date: Nov 30, 2013,

"The SPECIAL project aims at delivering breakthrough technologies for the biotechnological production of cellular metabolites and extracellular biomaterials from marine sponges. These include a platform technology to produce secondary metabolites from a wide range of sponge species, a novel in vitro method for the production of biosilica and recombinant technology for the production of marine coll ...
Read Project

 11

 FINISHED 

SUstainable Management of FLOriculture in WEstern Riviera (SUMFLOWER)

Start date: Sep 1, 2010, End date: Sep 1, 2013,

Background The region of Liguria has more than 12 000 floriculture nurseries, occupying 6 000 ha of farmland and representing 75% of the region’s agricultural production. Floricultural activities are associated with environmental issues relating to natural resources and the release of pollutants into water, soil and the atmosphere. Ornamental plants are ...
Read Project

 6

 FINISHED 

RESEAU POUR LENVIRONNEMENT DANS LESPACE MARITIME (RES-MAR)

Start date: Mar 31, 2010, End date: Mar 31, 2013,

The Strategic Project RES - MAR is aimed at improving monitoring systems, risk prevention, management of environmental and emergency management, mitigation of pollution related to the environmental compartments water and soil in the area of ​​cooperation.RES MAR is composed of 7 sub-projects and actions of the system from which you intend to bring out the best strategies for cross-border environme ...
Read Project

 19

 FINISHED 
The project PYRGI aims at developing niche sectors of the rural economy and agro-industrial North of the Mediterranean through:1. the exploitation of wild plants and cultivated multifunctional typical of the 'Mediterranean environment, or naturalized in it;2. the strengthening of the economic chain that goes from the producer and the consumer ends with passing through the transformation, promotion ...
Read Project

 8

 FINISHED 
DECIDE (Diagnostic Enhancement of Confidence by an International Distributed Environment), aims at creating a e-Infrastructure to enhance the diagnostic confidence in chronic brain diseases such as Alzheimer and dementia. Proper management of these neurodegenerative diseases are thought to be very important in terms of health-economical point of view. The DECIDE infrastructure will provide the med ...
Read Project

 13

 FINISHED 
PERPETUATE intends to develop European Guidelines for evaluation and mitigation of seismic risk to cultural heritage assets, with innovative techniques for the seismic strengthening of historical buildings and the preservation of artworks (frescos, stucco-works, statues, battlements, banisters, …). The main deliverable of the project will be made by a main document, which outlines the safety and c ...
Read Project

 11

 FINISHED 
"Transports are well known to be major contributors to noise pollution. Noise and vibrations (N&V) abatement naturally appears as an important objective for in the greening of surface transports.The SILENV project is a response to this requirement for the maritime domain.The consequences of N&V emissions from the ships are multiple. N&V emissions constitute a disturbance for both passengers and ha ...
Read Project

 15

 FINISHED 
The main purpose of the EVINCI-study is to test the impact of combined “anatomo-functional” non invasive cardiac imaging for detection and characterization of Ischemic Heart Disease (IHD). The EVINCI-study is a prospective clinical European multicenter trial performed in a cohort of 700 patients with suspected IHD. Patients with intermediate pre-test probability will undergo clinical and biohumora ...
Read Project

 22

 FINISHED 

Integrated European Industrial Risk Reduction System (IRIS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

Current practices in risk assessment and management for industrial systems are characterized by its methodical diversity and fragmented approaches. In retrospect these risk and safety paradigms resulted from diverse industries driven and limited by available knowledge and technologies. A change based on industry driven R&D work is needed. At present the European Industry recognised their obligatio ...
Read Project

 37

 FINISHED 
-
Read Project

 17