Search for European Projects

26 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 

AdVanced Aerodynamic Tools for lArge Rotors (AVATAR)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The motivation for the AVATAR project lies in the fact that upscaling wind turbine designs towards 10-20 MW requires radical innovations to make this feasible. Many of these innovationshave a strong aerodynamic component and can be considered as unconventional from an aerodynamic point of view. As such the analysis of the resulting rotor designs falls outside the validated range of applicability o ...
Read Project

 14

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 
"The main modules of INCOM project are 1) NFC production/modification process 2) Composites consolidation 3) Mechanical testing and modelling. The core of the project is the manufacturing and modification of the nanocellulose. Two alternative approaches for the manufacturing of the in-situ modified nanocellulose will be used: Masuko and pearl milling. Both processes will be conducted in the pre-po ...
Read Project

 15

 FINISHED 
"Power system reliability management means to take decisions under increasing uncertainty (for instance, related to renewable generation). It aims to maintain power system performance at a desired level, while minimizing the socio-economic costs of keeping the power system at that performance level. Seven TSOs (Belgium, Bulgaria, Czech Republic, Denmark, France, Iceland, Norway), together with ele ...
Read Project

 20

 FINISHED 

Multi-terminal DC grid for offshore wind (MEDOW)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

A DC grid based on multi-terminal voltage-source converter is a newly emerging technology, which is particularly suitable for the connection of offshore wind farms. Multi-terminal DC grids will be the key technology for the European offshore SuperGrid.In this proposal, DC power flow, DC relaying protection, steady state operation, dynamic stability, fault-ride through capability, and impacts of DC ...
Read Project

 12

 FINISHED 

European High-performance Infrastructures in Turbulence (EUHIT)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

Advances in key economical and societal issues facing Europe, like transport, energy generation, climate change, or industrial, environmental and geophysical mixing processes are obstructed by the lack of understanding of turbulence. To date, models fail to explain many fundamental features of turbulence, from boundary layers and particle transport, to heat transport and turbulence in complex and ...
Read Project

 21

 FINISHED 
One of the strategic objectives of the industrial initiative of the SET Plan on wind energy is to reduce cost of energy by improving reliability of wind turbines and their components and optimizing operation and maintenance (O&M) strategies. Increasing reliability and optimizing O&M have a direct impact on the availability of wind turbines and thus reduce cost and increase energy output. This stra ...
Read Project

 13

 FINISHED 
The objective of the WINDTRUST project is to demonstrate the technical and economic feasibility of innovative and more reliable solutions for multi MW wind turbines in order to improve the competitiveness of wind energy technologies. The selected components of the wind turbine are the rotor (specifically the blade), power electronics (specifically the converter) and Control and communication syste ...
Read Project

 9

 FINISHED 
6 Transmission System Operators (Belgium, France, Greece, Norway, Portugal and United Kingdom) and CORESO, a TSO coordination centre, together with 13 RTD performers propose a 4 year R&D project to develop and to validate an open interoperable toolbox which will bring support, by 2015, to future operations of the pan-European electricity transmission network, thus favouring increased coordination/ ...
Read Project

 23

 FINISHED 

WindScanner.eu - The European WindScanner Facility (WINDSCANNER)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

The future high rate of deployment of renewable energy will require a substantial increase in the installed wind power capacity towards 2020 and beyond, in fact this demand corresponds approximately to the installation of one large turbine every hour for the next decade. This is a substantial “grand challenge” as outlined in the Strategic Energy Technology Plan (SET-Plan) from 2009, which is the t ...
Read Project

 10

 FINISHED 

INdustrialization setup of a FLoating Offshore Wind turbine (INFLOW)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The INdustrialization setup of a FLoating Offshore Wind turbine (INFLOW) project participates to the development of an innovative solution for the offshore wind market. The main role of the project will be to demonstrate the cost competitiveness of the solution and to bridge the gap in between the development and industrialization phases of the technology. The development started with the validati ...
Read Project

 10

 FINISHED 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Read Project

 23

 FINISHED 
The key objective of the TROPOS project is the development of a floating modular multi-use platform system for use in deep waters, with an initial geographic focus on the Mediterranean, Tropical and Sub-Tropical regions but designed to be flexible enough not to be limited in geographic scope.The TROPOS approach is centered on the modular development where different types of modules can be combined ...
Read Project

 21

 FINISHED 

Future Deep Sea Wind Turbine Technologies (DeepWind)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

The hypothesis of this project is that a new wind turbine concept developed specifically for offshore application has potentials for better cost efficiency than existing offshore technology. Based on this hypothesis the objectives are: i)to explore the technologies needed for development of a new and simple floating offshore concept with a vertical axis rotor and a floating and rotating foundation ...
Read Project

 12

 FINISHED 

High Altitude Wind Energy (HAWE)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

The quest for clean and renewable energy sources found tremendous potential in wind power. So far, it has been harvested mostly by wind towers, which use only wind currents close to the ground (bellow 200m of height). Since low altitude wind currents are slow and intermittent, most wind farms operate, on average, 25-35% of their capacity. This represents a severe limitation to current state-of-art ...
Read Project

 7

 FINISHED 

Marine Renewable Integrated Application Platform (MARINA Platform)

Start date: Jan 1, 2010, End date: Jun 30, 2014,

MARINA is a European project dedicated to bringing offshore renewable energy applications closer to the market by creating new infrastructures for both offshore wind and ocean energy converters. It addresses the need for creating a cost-efficient technology development basis to kick-start growth of the nascent European marine renewable energy (MRE) industry in the deep offshore – a major future gl ...
Read Project

 18

 FINISHED 

Technology platform Operational Programme Wind (TOP WIND)

Start date: Feb 1, 2011, End date: Apr 30, 2014,

The European Wind Energy Technology Platform (TPWind), established in 2005, is today a well-established and broadly recognized network of approximately 150 wind energy experts, who play a key role in supporting the development of wind power in Europe.For the last three years, the costs of its Secretariat, hosted by the EWEA in Brussels, have been covered by the FP6 “Windsec” project, which was ver ...
Read Project

 3

 FINISHED 

Distributed Energy Resources Research Infrastructure (DERRI)

Start date: Sep 1, 2009, End date: Dec 31, 2013,

DERRI has as its primary objective the further integration of the European Distributed Energy Re-sources research community through the provision of User Access to a unique portfolio of important European Laboratories in the field of Distributed Energy Resources, focusing mainly system and architectural aspects of smart energy network based on Distributed Generation.
Read Project

 18

 FINISHED 
Growth in the European wind energy market has led to the manufacture of larger turbines (~ 7.5 MW). There are several challenges associated with these turbines, particularly offshore, e.g., vibrations/ damage of the flexible blades, mechanical drives/electric converters. These raise maintenance concerns and result in operational downtime, impacting on power systems and supply reliability. For thes ...
Read Project

 8

 FINISHED 

Virtual Campus Hub

Start date: Oct 1, 2011, End date: Sep 30, 2013,

Description Virtual Campus Hub (VCH)Higher education and industrial innovation are challenged by today's fast development in the natural sciences, engineering, technology, and economy, underpinned by the dramatic advances in information technology. Education in universities and their effort in innovation haven’t really adjusted to this trend ...
Read Project

 4

 FINISHED 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Read Project

 29

 FINISHED 

Wind Resource Assessment Audit and Standardization (WAUDIT)

Start date: Oct 1, 2009, End date: Sep 30, 2013,

"The objective of WAUDIT is the generation of a pool of researchers, in the field of wind resource assessment, in order to support the technological development of wind energy as one of the fastest growing industries worldwide (annual increase rate of 20%). The scientific motivation of the project is grounded on current state-of-the-art at industrial level. A technical audit to industry provides t ...
Read Project

 13

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21

 FINISHED 
Piezoelectric multilayer actuators performance and reliability needs to be improved to meet the growing demand from end-users with many different types of applications. The high production costs and problems related to obtaining reliable components explain that the utilization of piezo actuators up to now is far from having reached its full potential. Noliac and its partners for the IP are proposi ...
Read Project

 15

 FINISHED 
"The Call for this project proposal describes the objective as “to develop a methodology for optimising the design of monitoring systems for timely and effective decision making in an emergency”. This objective together with the expected impact (“A tool for making more efficient use of monitoring resources and improving the bases for decision making in emergencies, in particular in the context of ...
Read Project

 6