Search for European Projects

8 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

Structural performance of multi-metal component (MULTIMETAL)

Start date: Feb 1, 2012, End date: Jan 31, 2015,

In a nuclear power plant, a single metallic component may be fabricated from different materials. For example, RPV components are made from ferritic steel, whereas some of the connecting pipelines are fabricated from austenitic stainless steel. As a consequence different components often need to be connected by so-called dissimilar metal welds (DMW).Despite extensive research in Euratom Framework ...
Read Project

 13

 FINISHED 

Integrated Magnetic imAgery based on spIntronics Components (IMAGIC)

Start date: Sep 1, 2011, End date: Dec 31, 2014,

Structures reliability, installations safety and products quality are requirements that industrial sectors must take into account. The stake is to guarantee the integrity of the structures. In transport and nuclear fields, a major stake of people safety is associated. To take up this challenge, industries are users of non destructive testing (NDT) which gathers methods providing information on the ...
Read Project

 7

 FINISHED 
The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. The structure is based on three general pillars: 1) Training sc ...
Read Project

 12

 FINISHED 

TRAINING SCHEMES ON NUCLEAR SAFETY CULTURE (TRASNUSAFE)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

Nuclear Safety Culture is a topic of paramount importance for all nuclear operators as well as for all operators of installations dedicated to radiology and radiotherapy. It concerns also the regulators and related support organisations. Its efficient practice is an absolute must for nuclear power plants, for production and transport of fissile materials and radioisotopes, and for related research ...
Read Project

 19

 FINISHED 
In view of the increasing age of the European NPPs and envisaged life time extensions up to an EOL of 80 years, there is a need for an improved understanding and prediction of RPV irradiation embrittlement effects connected with long term operation (LTO). Effects caused by high neutron fluences such as the possible formation of Late Blooming Phases and as yet unknown defects must be considered ade ...
Read Project

 17

 FINISHED 
"The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components w ...
Read Project

 21

 FINISHED 
The overall objective of the project is to develop a novel, unconventional and cost efficient type of multipurpose high temperature coating systems on the basis of property tailoring by particle size processing of metallic source materials. It shall possess multi-functionality that will comprise thermal barrier effect, oxidation and corrosion protection, lotus effect, electrical insulation at elev ...
Read Project

 15