The basic assumption of the project is that the difficult public acceptance of Electric Power System (EPS) infrastructures are due to several reasons: i) the lack of trustworthiness in the relationship between Transmission System Operators (TSOs) and the stakeholders and general public; ii) the difficulty in comparing the new EPS infrastructures benefits, which are on a global, with the impacts , ...