Search for European Projects

5 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Tools for Enhanced Photovoltaic System Performance (PERFORMANCE PLUS)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

For a continued decrease of levelised costs of energy from photovoltaics (PV), the prices of PV system components have to be further decreased while performance, functionality, reliability and lifetime on the component and system level need to be increased. In an integrated view, PV system performance emerges from, but is not limited to the performance of the components. The Performance Plus proje ...
Read Project

 9

 FINISHED 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Read Project

 23

 FINISHED 
"To combat poverty, European strategies propose implementing active inclusion policies. However, these policies face serious conceptual questions and governance challenges. Practical implementation is problematic in that social exclusion is a multidimensional problem that goes far beyond financial poverty, necessitating the participatory co-production of individual opportunities. In addition, the ...
Read Project

 7

 FINISHED 
"Radical changes in the local governance of social cohesion in many Member States of the European Union are the focus of LOCALISE’s research on the organisational challenges of an integrated social and employment policy. The multiple needs of the most vulnerable groups in society require the integration of formerly separate policy fields. This creates positive dynamics for reducing social inequali ...
Read Project

 6

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21