Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Signal processing and Learning Applied to Brain data (SLAB)

Start date: Sep 1, 2016, End date: Aug 31, 2021,

Understanding how the brain works in healthy and pathological conditions is considered as one of the challenges for the 21st century. After the first electroencephalography (EEG) measurements in 1929, the 90’s was the birth of modern functional brain imaging with the first functional MRI and full head magnetoencephalography (MEG) system. In the last twenty years, imaging has revolutionized clinica ...
Read Project

 1

 FINISHED 

Participatory Urban Living for Sustainable Environments (PULSE)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

PULSE (Participatory Urban Living for Sustainable Environments) will leverage diverse data sources and big data analytics to transform public health from a reactive to a predictive system, and from a system focused on surveillance to an inclusive and collaborative system supporting health equity. Working within five global cities, PULSE will harvest open city data, and data from health systems, ur ...
Read Project

 12

 FINISHED 

Photonic Integrated Circuits Accessible to Everyone (PICs4All)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The prime objective of PICs4All is to increase the impact of photonics and enable access to the advanced photonic integrated circuit (PIC) technologies for academia, research institutes, SMEs and larger companies. This will be achieved by establishing a European network of Application Support Centres (ASCs) in the field of PIC technology. The main task of the ASCs is to lower the barrier to Resear ...
Read Project

 11

 FINISHED 
The EU population is increasingly exposed to new physical and chemical agents in the environment, some of which may be detrimental to public health. Of these, electromagnetic fields (EMF) are one of the most ubiquitous, with new EMF technologies and novel applications being actively developed and commercialised. To address pertinent questions on EMF and health, GERoNiMO proposes an integrated appr ...
Read Project

 27

 FINISHED 

An Adaptive Trust-based e-assesment System for Learning (TeSLA)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Although online education is a paramount pillar of formal, non-formal and informal learning, institutions may still be reluctant to wager for a fully online educational model. As such, there is still a reliance on face-to-face assessment, since online alternatives do not have the deserved expected social recognition and reliability. Thus, the creation of an e-assessment system that will be able to ...
Read Project

 19

 FINISHED 

Worldwide Interoperability for SEmantics IoT (Wise-IoT)

Start date: Jun 1, 2016, End date: May 31, 2018,

...ort. A strong plan for dissemination has been set-up and will have its peak during the trials to be run at PyeongChang Olympic and Paralympic Games.The consortium composed of prestigious research institutes, SMEs and large industries from Europe and Korea and will work in tandem to contribute to the success of the Wise-IoT project. Wise-IoT will give a particular attention to create an environment ...
Read Project

 9

 FINISHED 
The SpeechXRays project will develop and test in real-life environments a user recognition platform based on voice acoustics analysis and audio-visual identity verification. SpeechXRays will outperform state-of-the-art solutions in the following areas:• Security: high accuracy solution (cross over accuracy1 of 1/100 ie twice the commercial voice/face solutions) • Privacy: biometric data stored in ...
Read Project

 10

 FINISHED 
Inside today's vehicles ~4000 CAN-Bus signals/sec are processed in comparison to very few signals in smart phones and alike. This large amount of continuously gathered vehicle data represents major big data business potentials, not only for the automotive industry but in particular for cross-sectorial industries with interdisciplinary applications. With today's proprietary approaches focusing on b ...
Read Project

 12

 FINISHED 
Today, despite its unravelling business benefits, distributed cloud computing raises many security and dependability concerns. Root causes include increase in complexity and lack of interoperability between heterogeneous, often proprietary infrastructure technologies. SUPERCLOUD thus proposes new security and dependability infrastructure management paradigms that are : 1) user-centric, for self-se ...
Read Project

 11

 FINISHED 

COgnitive Radio Platform and Algorithms (CORPA)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

"The ICT industry is faced with a global challenge: develop new services with improved QoS, high QoE, and reduce its environmental impact. Clearly, there is a deep need of global efficiency, in the spectral domain, in the energy domain, and in the design of the radio.Indeed, wireless technology is rapidly proliferating into all aspects of computing and communication. The explosion of wireless appl ...
Read Project

 1

 FINISHED 

Multi-platform application toolkit (MPAT)

Start date: Dec 1, 2015, End date: Nov 30, 2017,

The project will deliver MPAT – an extensible platform for the simple creation of interactive multi-media applications.In recent years the convergence of TV and online media has been increasing with dramatic pace. The boundaries between TV and personal media are dissolving rapidly. HbbTV is a key driver in this; enabling media companies to deploy interactive services for TV to a wide audience by b ...
Read Project

 8

 FINISHED 

LArge Scale Information Exploitation of Forensic Data (LASIE)

Start date: May 1, 2014, End date: Oct 31, 2017,

The LASIE project will design and develop a novel framework to assist forensic analysts in their investigations. The envisaged framework will be based on automated technology for advanced data processing supported by an important human component in critical decision making stages, as well as, legal and ethical aspects. The framework will consist of tools to automatically manipulate, analyse and fu ...
Read Project

 18

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Trustful hyper-linked entities in dynamic networks (reTHINK)

Start date: Jan 1, 2015, End date: Jun 30, 2017,

...e tightly coupled with the network's functionalities and its geographical extension. The work is performed by a consortium of 3 global telecom operators, 2 SMEs, 2 Universities and 2 leading research institutes, coordinated by Eurescom.
Read Project

 10

 FINISHED 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Read Project

 18

 FINISHED 
ConnectinGEO’s primary goal is to link existing coordinated Earth Observation networks with science and technology (S&T) communities, the industry sector and the GEOSS and Copernicus stakeholders. The aim is to facilitate a broader and more accessible knowledge base to support the needs of the GEO Societal Benefit Areas (SBAs) and their users. A broad range of subjects from climate, natural resour ...
Read Project

 16

 FINISHED 
"The way information is represented, stored, recalled and processed in the neocortex is assuredly one of the most puzzling enigmas that science will have to solve during this century. Setting the basic principles of the Mental Information Theory is a high challenge potentially opening huge fields of research and progress in various domains.This research project is at the crossroads of neuroscience ...
Read Project

 1

 FINISHED 

BRIDGING THE GAP FOR ENHANCED BROADCAST (BRIDGET)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Description BRIDGET is opening new dimensions for multimedia content creation and consumption by enhancing broadcast programmes with bridgets.  A bridget links from the programme you are watching to second screen, interactive media such as web pages, images, audio clips, different types of video (2D, multi-view, with depth information, free ...
Read Project

 9

 FINISHED 

PREventive Care Infrastructure based On Ubiquitous Sensing (PRECIOUS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

PRECIOUS: PREventive Care Infrastructure based On Ubiquitous Sensing will provide a preventive care system to promote healthy lifestyles, which is comprised of three components: (1) transparent sensors for monitoring user context and health indicators (food intake, sleep and activity) deliver ambient data about current user behavior; (2) users are represented by individual virtual models which all ...
Read Project

 8

 FINISHED 

Dynamic Risk Approaches for Automated Cyber Defence (PANOPTESEC)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

The PANOPTESEC consortium will deliver a beyond-state-of-the-art prototype of a cyber defence decision support system, demonstrating a risk based approach to automated cyber defence that accounts for the dynamic nature of information and communications technologies (ICT) and the constantly evolving capabilities of cyber attackers. "Panoptes" is an ancient Greek term meaning 'all eyes' or 'all see ...
Read Project

 10

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Read Project

 20

 FINISHED 
...ality assurance while designing and piloting new kind of continuous, accessible, cooperation based model, tools and a virtual platform (the Market Place) supporting so called cross-sparring between institutions. Cross-sparring is to be understood as a process to make feedback more collaborative, concrete and objective, thanks to critical, but discreet brainstorming sessions, where strategies can b ...
Read Project

 8

 FINISHED 
The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Read Project

 16

 FINISHED 
The airways diseases asthma and chronic obstructive pulmonary disease affect over 400 million people world-wide and cause considerable morbidity and mortality. Airways disease costs the European Union in excess of €56 billion per annum. Current therapies are inadequate and we do not have sufficient tools to predict disease progression or response to current or future therapies. Our consortium, Air ...
Read Project

 40

 FINISHED 

Harvesting Dynamic 3D Worlds from Commodity Sensor Clouds (Harvest4D)

Start date: Jun 1, 2013, End date: May 31, 2016,

The current acquisition pipeline for visual models of 3D worlds is based on a paradigm of planning a goal-oriented acquisition - sampling on site - processing. The digital model of an artifact (an object, a building, up to an entire city) is produced by planning a specific scanning campaign, carefully selecting the (often costly) acquisition devices, performing the on-site acquisition at the requi ...
Read Project

 6

 FINISHED 
"Electroencephalography (EEG) from scalp potentials has affirmed itself as one of the primary non-invasive techniques to map and study the brain electric activity. EEG imaging is of crucial importance in the electric characterization of epileptic seizures. This is especially true for patients affected by focal epilepsy, when source characterization and localization is a key step of a pre-surgical ...
Read Project

 1

 FINISHED 
The NECOMA project addresses objective (c), Cybersecurity for improved resilience against cyber threats, of the ICT-EU Japan Coordinated call FP7-ICT-2013-EU-Japan. It aims at providing new means to understand cyberthreats and to mitigate their effect on infrastructure and endpoints. First, it adresses the aspect of data collection, leveraging past and current work on the topic with the goal to ex ...
Read Project

 5

 FINISHED 

Creativity REsearch Adaptive roadmap (CRe-AM)

Start date: Oct 1, 2013, End date: Feb 29, 2016,

This project aims to bridge communities of creators with communities of technology providers and innovators, in a collective, strategic intelligence/roadmapping effort to streamline, coordinate and amplify collaborative work towards developing, enhancing, and mainstreaming new ICT technologies and tools by addressing the needs of different sectors of the creative industries (e.g. art, culture, pub ...
Read Project

 17

 FINISHED 

Mobile Cloud Computing: Networks, Services and Architecture (MONICA)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

The overall objective of the MONICA project is to accelerate the transfer and deployment of research knowledge between European countries and China in order to obtain better understanding of mobile cloud computing in terms of its networks, services and architecture. In particular, the transfer of knowledge, mainly as a result of researcher’s mobility, will focus on a new vision of mobile cloud com ...
Read Project

 4

 FINISHED 
United4Health aims to exploit and further deploy innovative telemedicine services implemented and trialled under the RENEWING HEALTH project. A limited number of interventions have been selected from the basket of those already validated or under validation in RENEWING HEALTH; they will be trialled in 14 regions to guarantee aggregation of data and comparability of results. All service solutions a ...
Read Project

 33

 FINISHED 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Read Project

 17

 FINISHED 

Reducing Internet Transport Latency (RITE)

Start date: Nov 1, 2012, End date: Nov 30, 2015,

The present Internet limits the performance of applications that need real-time interaction. In part this is because the design of the network has been optimised to boost throughput, maximising efficiency for bulk applications. There is evidence that large buffers throughout the network have added to the end-to-end latency, with excessive delays severely impacting the quality experienced by users. ...
Read Project

 9

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Cloud Computing is an inevitable trend. In the near future almost every consumer electronics device will be connected to an ecosystem of third-party partners providing payment systems, streamed content, etc. However, a whole field of cloud services still lacks solutions because of security issues. Cloud operators and their end users (individuals, companies, etc.) do not always trust each other. As ...
Read Project

 7

 FINISHED 
Open Discovery Space aims to serve as an accelerator of the sharing, adoption, usage, and re-purposing of the already rich existing educational content base. First of all, it will demonstrate ways to involve school communities in innovative teaching and learning practices through the effective use of eLearning resources. It will promote community building between numerous schools of Europe and emp ...
Read Project

 50

 FINISHED 
Often remembering in learning activities is supported by the social and material environment in which the specific activities unfold. However, so far, little research has been done to integrate the ways in which joint remembering supports collaborative learning tasks in social interactions with other people by means of verbal resources (e.g. lexical and syntactic alignment) with the embodied (e.g. ...
Read Project

 1

 FINISHED 
The project cycLED aims at optimising the flows of resources over all life-cycle phases of Light Emitting Diodes (LED) products. The energy saving potential for LEDs is significant, and the strategic importance of the LED technology is reflected in the current and upcoming market development. However, LED-based product systems contain many resources like indium, gallium or rare earth metals. Some ...
Read Project

 14

 FINISHED 
Description REVERIE is a revolution in online social networking. It is safe, collaborative, online environment which brings together realistic inter-personal communication and interaction.REVERIE will bring online social networking into the real-world with interaction and communication based on what people do and say and how they act. In ...
Read Project

 17