Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 
EcoShopping project aims to build a holistic retrofitting solution for commercial buildings to reduce primary energy consumption down to less than 80kWh/m2 per year and increase the share of RES (Renewable Energy Sources) more than 50% compared to the state of the art. The approach will be systemic by developing (1). Novel thermal insulation solutions using cost effective materials to further redu ...
Read Project

 17

 FINISHED 
...developed. Still lot of research is needed for the generation of hydrogen from these two water treatment technologiesIt can be stated as a strength that such kind of electrochemical and hydrogen valorisation technologies have not still been jointly considered. As far as we are concerned there is no previous work focused on the recovery of generated hydrogen from EC or EO systems for electricity pr ...
Read Project

 11

 FINISHED 
Since the beginning of the 20th century, the ever growing demand for more agricultural products forced farmers to adopt resource-intensive and unsustainable practices which increased economic and environmental costs. Precision agriculture (PA), one of the most significant advancement in agriculture since the advent of mechanization, allows taking into account the spatial and temporal needs of soil ...
Read Project

 10

 FINISHED 
We will develop a sophisticated intelligent ICT system for the management of energy in a community, and associated business models, focussed on the concepts of aligning energy demand with the availability of renewables-based supply, addressing community goals for cost, carbon footprint and other objectives.-The system will comprise algorithms for prediction of demand and supply, optimization of en ...
Read Project

 9

 FINISHED 

Building Energy Efficiency for Massive market UPtake (BEEMUP)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

BEEM-UP will demonstrate the economic, social and technical feasibility of retrofitting initiatives, drastically reducing the energy consumption in existing buildings, and lay the ground for massive market uptake. BEEM-UP involves the building owners at 3 sites in France, Sweden and the Netherlands to implement an innovative approach to go beyond a 75% reduction in space heat energy consumption, i ...
Read Project

 20

 FINISHED 
The ENCOURAGE project aims to develop embedded intelligence and integration technologies that will directly optimize energy use in buildings and enable active participation in the future smart grid environment. The desired energy savings will be achieved in three complementary ways. Firstly, by developing supervisory control strategies that will be able to coordinate larger subsystems (HVAC,lighti ...
Read Project

 12

 FINISHED 

Smart City Service Development Kit and its Application Pilots (CitySDK)

Start date: Jan 1, 2012, End date: Oct 31, 2014,

...hree large-scale pan-European smart city service pilots in the eight partner cities. The pilots are in the domains of smart mobility, smart participation and smart tourism. A combination of city organisations' leadership, collaboration between the cities, and a large amount of partners' relevant existing services, interfaces, software, practices and standards in these domains are the key enabler f ...
Read Project

 23

 FINISHED 

Occupant Aware, Intelligent and Adaptive Enterprises (Adapt4EE)

Start date: Nov 1, 2011, End date: Oct 31, 2014,

Adapt4EE aims at augmenting the contemporary architectural envelope by incorporating business and occupancy related information thus providing a holistic approach to the planning, design & evaluation of energy performance of construction products at an early design phase and prior to their realization.Adapt4EE aims to deliver and validate a holistic energy performance framework that incorporates a ...
Read Project

 9

 FINISHED 
The European Sport and Recreation Building Stock accounts for approximately 1,5 Million buildings or 8% of the overall building stock. These facilities are unique by their physical nature, their energy consumption profiles, the usage patterns of people inside, ownership, and comfort requirements. SPORTE2 aims to manage and optimize the triple dimensions of energy flows (generation, grid exchange, ...
Read Project

 10

 FINISHED 
...umption by monitoring-Maintenance of the installed system.This service will be disseminated to the open market, so the total service can be exploited as one package by the consortium an/or other organisations, e.g. SMEs, consultancy agencies specialised in energy efficiency.
Read Project

 11

 FINISHED 
The objective of PERIPHÈRIA is to deploy convergent Future Internet (FI) platforms and services for the promotion of sustainable lifestyles in and across emergent networks of "smart" peripheral cities in Europe, dynamic realities with a specific vocation for green creativity. Its Open Service Convergence Platform, an "Internet by and for the People", extends and enhances the Save Energy project's ...
Read Project

 12

 FINISHED 
The main goal of the ENERsip project is to create an adaptive, customizable, and service-oriented ENERgy monitoring and control system for energy grids and decision makers. ENERsip is conceived on the idea that mixing energy, communications, control, computing and construction for the consumption and generation elements, must be active and proactively coordinated. To bring the idea into reality, E ...
Read Project

 11

 FINISHED 
The over-all objective of the FIREBALL project is to coordinate and align methodologies and approaches in the domains of Future Internet (FI) research and experimentation testbeds and user driven open innovation towards successful innovation in "smart city" environments.In doing so, and in covering the whole FI research and innovation value chain driven by smart cities being the users of the FI, F ...
Read Project

 17

 FINISHED 

Advanced Pilots of Living Labs Operating in Networks (APOLLON)

Start date: Nov 1, 2009, End date: May 31, 2012,

The APOLLON project proposal addresses the call of the European Commission to pilot and share best practices in cross-border Living labs networks. The core focus of Living Labs is to improve the R&D process by early participation and clustering of end users and business stakeholders, including SMEs. APOLLON will demonstrate the positive impacts of collaborative cross-border Living Lab networking b ...
Read Project

 29

 FINISHED 

SAVE ENERGY

Start date: Mar 1, 2009, End date: Oct 31, 2011,

The SAVE ENERGY will use a serious game providing an engaging believable virtual environment for citizens, consumers and policy makers to gain awareness, understanding and experience with regard to the issues associated with behavioural change and energy efficiency, in both the immediate and longer terms.The project will deliver a model that is simple, attractive and effective enough for users to ...
Read Project

 14

 FINISHED 

Micro Dynamic Demand and Storage (MiDDaS)

Start date: Jun 1, 2009, End date: May 31, 2011,

Power outages can be caused by a defect in a power station; damage to a power line or other parts of the distribution system, a short circuit, or the overloading of electricity mains. Out of all the causes, most of them are minimised or preventable by better maintenance except the overloading of the electricity main (Power Grids), which can’t be completely predicted. Across Europe, overloading of ...
Read Project

 7