Search for European Projects

18 European Projects Found

Searched on 125080 European Projects

 FINISHED 
4RinEU will define robust, cost-effective, tailorable deep renovation technology packages supported by usable methodologies, feeding into reliable business models. The project will minimize failures in design and implementation, manage different stages of the deep renovation process, from the preliminary audit up to the end-of-life, and provide information on energy, comfort, users’ impact, and in ...
Read Project

 13

 FINISHED 

Simulation in Real Time for Manufacturing with Zero Defects (STREAM-0D)

Start date: Oct 1, 2016, End date: Mar 31, 2020,

...or any value of the parameters. The models run so fast that they can be executed on tablets or smart phones. ROM will be used to transform complex models into the real-time capable models that can be integrated in the production line. Moreover, the online deployment of ROMs and data gathering systems will generate big data which will be exploited through data analysis techniques for further improv ...
Read Project

 10

 FINISHED 
...w controlled and cost effective solutions.IMPRESS will also develop a new Iterative Design Methodology, which will incorporate all stages of the Design-Construct-Install-Operate process. This will be integrated with a BIM cloud based database focussing on the interoperability between software tools required for the prefabricated process. Furthermore, new penalty based business models will be inves ...
Read Project

 16

 FINISHED 
NewTREND seeks to improve the energy efficiency of the existing European building stock and to improve the current renovation rate by developing a new participatory integrated design methodology targeted to the energy retrofit of buildings and neighbourhoods, establishing energy performance as a key component of refurbishments. The methodology will foster collaboration among stakeholders in the va ...
Read Project

 14

 FINISHED 
...al analyses of energy-related behaviour & attitudes towards energy technologies, which will assess how multiple identities and social positions, combine to shape practices. These analyses will be integrated within a transitions management framework which takes account of the complex meshing of human values and identities with technological systems. The third key paradigm informing the research is ...
Read Project

 7

 FINISHED 
...buildings. This is achieved through the development of a new innovative modular simulation-based building control system. This has the ability to: (i) exploit real-time holistic building simulation (integrated with diverse building systems), (ii) directly enable automated control actions of a building and its surroundings (adaptively) and (iii) provide considerable energy savings to the building ...
Read Project

 2

 FINISHED 
...es addressing this building operation phase will have a major impact in the building life cycle cost.Energy IN TIME (EiT) project goes beyond existing building control techniques, developing an integrated control & operation approach, that will combine state of the art modelling techniques with the development of an innovative simulation-based control technique with the overarching objective of au ...
Read Project

 13

 FINISHED 

Resource and Energy Efficient Manufacturing (REEMAIN)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

...nt of renewable energy technologies and resource saving strategies that consider energy purchase, generation, conversion, distribution, utilization, control, storage, re-use in a holistic and integrated way.Our vision is that Europe REEMAINs the world leader in sustainability through energy and resource efficient manufacturing.
Read Project

 18

 FINISHED 

CI-NERGY Smart cities with sustainable energy systems (CI-NERGY)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

...etwork will be a highly multi-disciplinary coordinated PhD programme on urban energy sustainability, covering the key challenges in cities related to a low carbon future. There is a gap in high level integrated training in the urban energy research field, which is due to the wide range of fragmented disciplines from building physics and energy supply technologies with electrical and thermal engine ...
Read Project

 11

 FINISHED 
...so implemented that will allow the selection of the best possible retrofitting mix, customised to the needs of the particular building.Several remarkable innovative technologies and materials will be integrated in the retrofitting process:- Envelope Retrofitting: Ventilated Facades, Aerogel-based Superinsulating mortar, Wooden Insulating Wall Panel and VIP Panel- Integration of RES: PV Energy, The ...
Read Project

 27

 FINISHED 
INDICATE proposes a novel city-wide decision support system which accounts for all major systems and activities relevant to developing energy-efficient cities. To create a 'Smart Economy', integrated smart urban planning tools including architectural masterplanning and detailed energy optimisation and environmental analysis will be required. If this is not addressed, we will be unable to deliver ...
Read Project

 8

 FINISHED 

Intelligent URBAn eNergy tool (iURBAN)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

iURBAN proposes to develop and validate a software platform that will integrate different ICT energy management systems (H/W and S/W) in two European cities.This intelligent URBAn eNergy tool will provide useful data to a novel decision support system that will make available the necessary parameters for the generation and further operation of new business models. These business models will contri ...
Read Project

 11

 FINISHED 
...ry building-retrofitting market mobilization in Europe to fulfill EU-targets in 2020 and 2050, new business models and financial supporting tools need to be developed. FASUDIR will provide an Integrated Decision Support Tool (IDST) based on a new methodology supported by a software tool that will help decision makers to select the best energy retrofitting strategy to increase the sustainability of ...
Read Project

 12

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 
EASEE aims at developing a tool-kit for energy efficient envelope retrofitting of existing multi-storey and multi-owner buildings which combines novel design and assessment strategies, modular prefabricated elements, advanced insulating materials and new scaffolding-free installation approaches, to reduce energy demand, minimising the impact on occupants while preserving the façade original appear ...
Read Project

 18

 FINISHED 
"Due to barriers that exist in when considering the sustainability of the built environment, optimising energy efficiency in buildings is often a management issue and not one of design. In many cases, it is the organisation responsible for the building that makes the decision with respect to where best to invest their limited resources. For this reason, decision support tools, providing informat ...
Read Project

 12

 FINISHED 
...ed weight, reduced thermal conductivity and energy consumption, reduced material usage and life cycle environmentalperformances control of the windows. New additional functionality, like e.g., window integrated functional coatings will be combined with intelligent phase changing materials and novel glass-polymer composites with wavelength management capability. The new materials will combine heat ...
Read Project

 12

 FINISHED 

Valuable EneRgY for a smart School (VERYSchool)

Start date: Dec 1, 2011, End date: Nov 30, 2014,

...ng edge intelligent energy savings strategies through the execution of optimisation scenarios dedicated specifically to the needs of schools.VERYSchool will demonstrate its methodology, approach, and integrated solution at 4 Pilot locations. The pilot buildings are selected, they represent different school typologies and geographic locations and are directly managed by Consortium Partners.VERYScho ...
Read Project

 14