Search for European Projects

15 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Start date: Jun 1, 2016, End date: May 31, 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Read Project

 25

 FINISHED 
...urope. 3Ccar will be involved in standardization needed to ensure that large vertical supply chains can be established. The 3Ccar project shows that collaboration between industry, research institutes, governments and customers is pivotal for excellence in Europe.
Read Project

 47

 FINISHED 

PANACHE

Start date: Jan 2, 2014, End date: Jan 2, 2018,

Pilot line for Advanced Nonvolatile memory technologies for Automotive microControllers, High security applications and general Electronics :The PANACHE project objective is to set-up a pilot line for embedded Flash technology design and manufacturing platform for the prototyping of innovative µcontrollers in Europe.The current 40nm technology platform as well as the already defined 55nm technolog ...
Read Project

 21

 FINISHED 

THINGS2DO (THINGS2D0)

Start date: Jan 1, 2014, End date: Jan 1, 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Read Project

 44

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
....MATTHEW brings together eight highly qualified European partners, world market leading industries (IFAT, GTO, AMS, IFAG), research oriented SMEs (IMA, TEC, CRX) as well as a high esteemed university institute for ICT security (IAIK).
Read Project

 8

 FINISHED 

Devices for Neurocontrol and Neurorehabilitation (DENECOR)

Start date: Jun 1, 2013, End date: Mar 31, 2016,

The primary aim of DeNeCor is to resolve this top issue such that electronic neuromodulation therapy becomes mainstream and full market potential can be obtained. We will increase acceptance by neurologists by demonstrating designed co-existency between therapy devices and diagnostic systems. The second aim of DeNeCor is to extrapolate the ‘bilateral’ agreements between AIMD and MRI manufactures i ...
Read Project

 22

 FINISHED 

Adaptive Cooperative Control in Urban (sub) Systems (ACCUS)

Start date: Jun 1, 2013, End date: Jan 31, 2016,

Urban systems like traffic, energy, and outdoor lighting are managed by self-contained embedded systems – though the managed processes are deeply interconnected. New applications and collective optimization require integration of these systems which represents a truly “systems of systems” integration problem: these urban systems evolve independently, have their own purpose and internal policies wh ...
Read Project

 28

 FINISHED 
The overall objective of IDEAS “Interactive Power Devices for Efficiency in Automotive with Increased Reliability and Safety”, - is to develop advanced packaging for power supply components and new generation memory systems having application on Electric and ICE propelled vehicles and aiming at covering complementary aspects which haven’t yet addressed into the main running ENIAC and ARTEMIS Aut ...
Read Project

 15

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 
The overall objective is to develop sustainable drive train topologies including control concepts for inherently safe electric vehicle power-train. The project focuses on significant steps ahead in terms of: 1. Development of smart electrical power-train concepts comprising high efficiency torque dense motors fully integrated with power converters and storage systems for modularity, compactness re ...
Read Project

 30

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 
Description Super-large-scale swarm of small autonomous mobile micro-robots The REPLICATOR project focuses on the development of an advanced robotic system, consisting of a super-large-scale swarm of small autonomous mobile micro-robots that are capable of self-assembling into large artificial org ...
Read Project

 11

 FINISHED 

Nanoelectronics for Mobile AAL Systems (MAS)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

The ENIAC JU project MAS is developing nanoelectronics components for applications in the field of health and wellness, and to create a development platform for the design of complete flexible, robust and safe mobile ambient-assisted-living systems. The project covers remote patient supervision using multi- parameter biosensors and telecommunications networks to improve the quality of the clinical ...
Read Project

 30

 FINISHED 

Assistive Technology Rapid Integration & Construction Set (AsTeRICS)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

Description More than 2,6 million people in Europe have problems with their upper limbs and therefore many of them depend on Assistive Technologies (AT) to access a PC or any other ICT, including mobile technology, and to control their environment (to switch on equipment, to open doors etc).One problem of existing AT devices is that they can ...
Read Project

 9