Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 
Uncertainty is intrinsic in Cyber-Physical Systems (CPSs) due to novel interactions of embedded systems, networking equipment, cloud infrastructures, and humans. CPSs have become predominant in critical domains and necessitate the implementation of proper mechanisms to deal with uncertainty during their operation at an acceptable cost avoiding unwarranted threats to its users and environment. One ...
Read Project

 9

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Multi-cores Partitioning for Trusted Embedded Systems (MultiPARTES)

Start date: Sep 1, 2011, End date: Dec 31, 2014,

Growing complexity of applications makes the integration of security and dependability an issue in many domains (e.g. energy supply, transportation, industrial control, aerospace, etc). The engineering of embedded systems needs to take these aspects into account. However, guaranteeing security and dependability in a situation of increasing system complexity is leading to unacceptable development c ...
Read Project

 10

 FINISHED 
The overall objective of the FC-DISTRICT project is to optimize and implement an innovative energy production and distribution concept for sustainable and energy efficient refurbished and/or new “energy autonomous” districts exploiting decentralized co-generation coupled with optimized building and district heat storage and distribution network. The concept is based on dynamic heat exchange betwee ...
Read Project

 23

 FINISHED 

Robust Advanced Materials for metal Supported SOFC (RAMSES)

Start date: Jan 1, 2011, End date: May 31, 2014,

"The RAMSES project aims at developing an innovative high performance, robust, durable and cost-effective Solid Oxide Fuel Cell based on the Metal Supported Cell concept i.e. the deposition of thin ceramic electrodes and electrolyte on a porous metallic substrate. Both planar and tubular cells will be developed. By considering advanced materials tailored for this cell design, such cells will be ab ...
Read Project

 10

 FINISHED 
Europe benefits from leadership across a breadth of industries including automotive, avionics, ICT, medical equipment and industrial automation. Incorporated Smart Systems, including smart components (and in the future MNBS) often provide the key technical features for the competitiveness of products in these sectors.The objectives of IRISS are to hedge and extend competitive advantages of Europea ...
Read Project

 16

 FINISHED 
Conventional analytical methods often require a large sample volume and complicated time-consuming protocols. The objective of this project is to develop ultra low cost laboratories on chips (LOC) without penalisation in time response, sensitivity or simplicity of use. The user will obtain the test results using a very popular interface (a smartphone) and a set of Labcards and Skin Patches where t ...
Read Project

 16

 FINISHED 
The objective of TERESA is to define, demonstrate and validate an engineering discipline for trust that is adapted to resource constrained embedded systems. We define trust as the degree with which security and dependability requirements are met.Resource constrained embedded systems are characterized as follows:•\tThey belong to different application sectors•\tComputing resource are mostly statica ...
Read Project

 6

 FINISHED 

Ubiquitous Care System to Support Independent Living (CONFIDENCE)

Start date: Feb 1, 2008, End date: Jul 31, 2011,

The main objective of this proposal is the development and integration of innovative technologies for the detection of abnormal events (such as falls) or unexpected behaviours that may be related to a health problem in elderly people.With the proposed approach, the elderly will gain confidence and independence. CONFIDENCE will be a cost effective, non-intrusive and reliable system that will increa ...
Read Project

 11

 FINISHED 

Generic Embedded System Platform (GENESYS)

Start date: Jan 1, 2008, End date: Jun 30, 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Read Project

 25

 FINISHED 
Three way cooperation for life-long learning : A framework for work-based learning has been drawn up for which various tools have been created. This will facilitate continous on the job training for employees which is adaptable to the company strategy or the needs of the individual. This project started in 2003 and lasted 24 months.
Read Project

 17