Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The goal of BrainCom is to develop a new generation of neuroprosthetic devices for large-scale and high density recording and stimulation of the human cortex, suitable to explore and repair high-level cognitive functions. Since one of the most invalidating neurospychological conditions is arguably the impossibility to communicate with others, BrainCom primarily focuses on the restoration of speech ...
Read Project

 10

 FINISHED 

Exploiting light coherence in photoacoustic imaging (COHERENCE)

Start date: Oct 1, 2016, End date: Sep 30, 2021,

Photoacoustic imaging is an emerging multi-wave imaging modality that couples light excitation to acoustic detection, via the photoacoustic effect (sound generation via light absorption). Photoacoustic imaging provides images of optical absorption (as opposed to optical scattering). In addition, as photoacoustic imaging relies on detecting ultrasound waves that are very weakly scattered in biologi ...
Read Project

 1

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
Many HIV vaccine concepts and several efficacy trials have been conducted in the prophylactic and therapeutic fields with limited success. There is an urgent need to develop better vaccines and tools predictive of immunogenicity and of correlates of protection at early stage of vaccine development to mitigate the risks of failure. To address these complex and challenging scientific issues, the Eur ...
Read Project

 43

 FINISHED 

Algorithmic and Mathematical Cryptology (AlmaCrypt)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Cryptology is a foundation of information security in the digital world. Today's internet is protected by a form of cryptography based on complexity theoretic hardness assumptions. Ideally, they should be strong to ensure security and versatile to offer a wide range of functionalities and allow efficient implementations. However, these assumptions are largely untested and internet security could ...
Read Project

 3

 FINISHED 

European AIDS Vaccine Initiative 2020 (EAVI2020)

Start date: Nov 1, 2015, End date: Oct 31, 2020,

HIV-1 is responsible for a global pandemic of 35 million people, and continues to spread at a rate of >2 million new infections/year. It is widely acknowledged that a protective vaccine would be the most effective means to reduce HIV-1 spread and ultimately eliminate the pandemic, while a therapeutic vaccine may help mitigate the clinical course of disease and lead to strategies of viral eradicati ...
Read Project

 27

 FINISHED 

Wave turbulence: beyond weak turbulence (WATU)

Start date: Oct 1, 2015, End date: Sep 30, 2020,

...s), solitons and sharp water wave ridges (water surface waves) or even fluid turbulence for overturning 3D internal waves. I will specifically use two unique large-scale facilities available in LEGI (Grenoble, France): the 30 m 1D wave flume for surface water waves and the 13m-diameter Coriolis turntable for water surface waves and internal waves. I will setup advanced space-time resolved profilom ...
Read Project

 2

 FINISHED 

Circular European Economy Innovative Training Network (CircEuit)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

Circ€uit – the Circular European Economy Innovative Training Network - creates a cohort of future leaders in research, policy & business through its innovative training programme focused on the Circular Economy. Circular business models, based on leasing or providing functionality rather than products, often called Product Services Systems, are widely seen as a way how business can create sustaina ...
Read Project

 7

 FINISHED 

Algebraic and Kähler geometry (ALKAGE)

Start date: Sep 1, 2015, End date: Aug 31, 2020,

The purpose of this project is to study basic questions in algebraic and Kähler geometry. It is well known that the structure of projective or Kähler manifolds is governed by positivity or negativity properties of the curvature tensor. However, many fundamental problems are still wide open. Since the mid 1980's, I have developed a large number of key concepts and results that have led to important ...
Read Project

 2

 FINISHED 
Despite significant progress in cancer therapy, current treatments are still controversial due to intolerable side effects. Targeted immunotherapy has recently emerged as an ideal alternative to improve treatment modalities for cancers patients. However, very limited approaches are available today and major issues remain to be addressed. The ERC grant offers a unique opportunity to propose a new p ...
Read Project

 2

 FINISHED 

REgenerative Stem cell therapy for STroke in Europe (RESSTORE)

Start date: Sep 1, 2015, End date: Aug 31, 2020,

Stroke is the second leading cause of death in the world population. When not fatal, stroke often results in disability, due to motor and cognitive impairments, and secondary health problems affecting not only patients but also their families. Building on emerging preclinical and pilot clinical evidences, RESSTORE will focus on the clinical assessment of regenerative cell therapy to improve stroke ...
Read Project

 29

 FINISHED 
ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Read Project

 50

 FINISHED 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Read Project

 19

 FINISHED 

Optimization Driven Architectural Design of Structures (OptArch)

Start date: Feb 1, 2016, End date: Jan 31, 2020,

"According to UNEP, the building sector is estimated to be worth 10% of the global GDP and employs 111 million people. In addition, buildings use about 40% of global energy, 40% of global resources and emit approximately 33% of global GHG emissions. Finally, the fact that people today spend, on average, more than 80% of their time indoors, enhances its social importance. All above indicate the nec ...
Read Project

 12

 FINISHED 
We propose the development of a Very High Performance microprocessor System on Chip (SoC) based on STM European 28nm FDSOI technology with multi-core ARM processors for real-time applications, eFPGA for flexibility and key European IPs, enabling faster and cost-efficient development of products for multiple space application domains. The performance is expected to be 20 to 40 times the performance ...
Read Project

 7

 FINISHED 

Combatting Bacterial Resistance in Europe (COMBACTE-NET)

Start date: Jan 1, 2013, End date: Dec 31, 2019,

The emergence of Antibiotic-resistant bacteria (ARB) is a global problem, having recently been elevated to the top three threats identified by the World Health Organisation (WHO), and subject of numerous national and international government activities, including the Trans-Atlantic Task Force on Antimicrobial Resistance established by the US and EU presidencies. The estimated costs of ARB are aro ...
Read Project

 38

 FINISHED 
We propose to use a combination of data from the ESA space missions GAIA and Herschel, alongside other satellite and European-led ground-based observations, to map the density distribution of star formation regions. This will allow us to identify the mechanisms that underlie both how massive stars themselves form, but more fundamentally, how their natal clusters evolve around them. Our work wi ...
Read Project

 5

 FINISHED 

People for tHe eurOpean bioENergy mIX (Phoenix)

Start date: Dec 1, 2015, End date: Nov 30, 2019,

The development and adoption of renewable and sustainable forms of energy has become a major priority for Europe and is an important theme in H2020. Research into new, energy-related technologies to reduce Europe’s reliance on non-renewable fossil fuels is a critical need, and requires more newly qualified people in areas such as renewable-energy infrastructure management, new energy materials and ...
Read Project

 15

 FINISHED 

Changing Energy Efficiency Technology Adoption in Households (CHEETAH)

Start date: Dec 1, 2016, End date: Nov 30, 2019,

Modelling analyses typically suggest that policies accelerating the adoption of energy-efficient technologies (EETs) by overcoming barriers to energy efficiency in the residential sector provide benefits for individual households, the energy system and for society as a whole. Yet, implicit discount rates, employed to reflect households’ decision criteria and response to policy, are disputed in pol ...
Read Project

 6

 FINISHED 
The continuous increase of the share of renewable energy sources is redefining the electrical networks. In future infrastructures, an important number of agents (sources, storage devices and consumers) will have intelligent interfaces allowing the regulation of the injection and extraction of power into the grid. This context will create multiple alternatives to increase the efficiency in electric ...
Read Project

 9

 FINISHED 
The main goal of this project is developing a complete synthesis and optimization methodology for switching nano-crossbar arrays that leads to the design and construction of an emerging nanocomputer. New computing models for diode, FET, and four-terminal switch based nanoarrays are developed. The proposed methodology implements both arithmetic and memory elements, necessitated by achieving a compu ...
Read Project

 5

 FINISHED 

Erasmus Mundus Master in Nanoscience and Nanotechnology

Start date: Sep 20, 2015, End date: Sep 19, 2019,

Objective The objective of the Erasmus Mundus Master in Nanoscience and Nanotechnology is to provide a top quality and broad multidisciplinary education in the emerging field of nanoscience and nanotechnology, coupled with an individual top-level specialization in one of five defined areas of nanoscience and nanotechnology: nanophysics, nanochemistry, nanoelectronics, biophysics or nanobiotechnolo ...
Read Project

 4

 FINISHED 
... (Spain) – Department of education of the Catalonia Regional authority-Medef Rhône-Alpes (France) – Regional organisation of the most important Employers’ association in France-Rectorat de Grenoble (France) – Public organization depending on the Minister of Education in France.-CCGPE-DGEO (Belgium) – Department of European projects in the Minister of Education in the French speaking part of Belgiu ...
Read Project

 9

 FINISHED 

Connected Health Early Stage Researcher Support System (CHESS)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

Changing demographics and increasing pressure on health related resources mean that new models of care must be found. Fortunately, technology developments and increasing digital literacy mean that we can now put the correct information in the correct hands at the correct time. This is connected health and it allows patients, clinicians, and planners to make better decisions. Ultimately, these d ...
Read Project

 8

 FINISHED 
OpenDreamKit will deliver a flexible toolkit enabling research groups to set up Virtual Research Environments, customised to meet the varied needs of research projects in pure mathematics and applications and supporting the full research life-cycle from exploration, through proof and publication, to archival and sharing of data and code.OpenDreamKit will be built out of a sustainable ecosystem of ...
Read Project

 17

 FINISHED 
Hybrid and Full Electric Vehicles ((H)EVs) are essential for the transition towards sustainable e-mobility. The permanent magnets in motors/generators of (H)EVs are either NdFeB or SmCo magnets, which contain large quantities of rare earths, which are critical metals with the highest supply risk for Europe. As highlighted by the European Rare Earths Competency Network, recycling of rare-earth magn ...
Read Project

 7

 FINISHED 
...ibuted intelligence with edge computing principles, big data analytics capability and self-awareness property. The BigClouT platform will be deployed and validated in 4 pilot cities in the project, Grenoble, Bristol, Tsukuba and Fujisawa. BigClouT gives a particular importance to the involvement of citizens during the whole lifetime of the project, from use case definitions to validation. BigClouT ...
Read Project

 7

 FINISHED 

European Joint Doctorate in Functional Materials Research (EJD-FunMat)

Start date: Jun 1, 2015, End date: May 31, 2019,

EJD-FunMat is a European Joint Doctoral programme in the field of functional materials research. EJD-FunMat is embedded in an existing research network, with previous experience in co-tutelle doctorates, but the project will add new major elements, with the strategic aim of becoming a permanent reference European Joint Doctoral School in Materials Science and beyond.The key innovative aspects of t ...
Read Project

 9

 FINISHED 

Critical Infrastructure Protection using Adaptive MILS (CITADEL)

Start date: Jun 1, 2016, End date: May 31, 2019,

Critical infrastructures (CI) rely on complex safety- and security-critical ICT systems placed into unpredictable environments and forced to cope with unexpected events and threats while exhibiting safe adaptive behavior. Recent security trends stress continuous adaptation to increase attacker work factor and to confound reverse-engineering. Critical CI systems must undergo extensive and costly sc ...
Read Project

 14

 FINISHED 
The key therapeutic issue in diabetes mellitus type I and II is glycaemic control. Reductions of constant self-control, of insulin injections, and of long-term complications would have tremendous benefit for quality of life. The best therapy option is the transplantation of allogeneic islet cells, but the current state of the art limits the applicability of this approach. Implanting unprotected gr ...
Read Project

 10

 FINISHED 

Geohazards: Risk Assessment, Mitigation and Prevention (GEO-RAMP)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

This proposal aims to provide a step change in terms of our capacity to assess and predict risks due to geohazards (landslides and rock slides, earthquakes, floods). This is necessary in order to make built environments and infrastructures resilient to the increasing threat of natural hazards due to the expanding size of European cities and urban centres, increased use of infrastructure, and the ...
Read Project

 6

 FINISHED 

Masters in Earthquake Engineering and Engineering Seismology

Start date: Sep 1, 2015, End date: Feb 28, 2019,

Objective The main goal of this Master course is to provide a multidisciplinary training in earthquake engineering and engineering seismology which also includes newly emerging fields in seismic risk mitigation and management.Course duration One and a half years (90 ECTS)Brief DescriptionThe cross-cutting nature of the programme allows students to develop skills which will allow them to communicat ...
Read Project

 4

 FINISHED 

"City-zen, a balanced approach to the city of the future" (CITY-ZEN)

Start date: Mar 1, 2014, End date: Feb 28, 2019,

...ll be developed by specialized working groups in retrofitting, smart grids, and heating and cooling. This approach holds for both technology and process improvement.The demonstrators in Amsterdam and Grenoble include retrofitting 105000 m2 of housing to levels down to 53 kWh/m2, showing average savings of the order of 80%. Furthermore they include fully-functional smart grid development, electrici ...
Read Project

 23

 FINISHED 

EUROPEAN ROBOTIC GOAL-ORIENTED AUTONOMOUS CONTROLLER (ERGO)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

European Robotic goal-oriented autonomous COntroller (ERGO)The specific objective of ERGO is thaen to deliver the most advanced but flexible space autonomous framework/system suitable for single and/or collaborative space robotic means/missions (orbital and surface rovers) demanding robust operations with adaptable levels of autonomy.Due to the intrinsic similarities of addressed scenarios, especi ...
Read Project

 8

 FINISHED 

Nanonets2Sense

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Nanonets2Sense proposes a new technological approach, where random networks of nanowires, called nanonets (NN), allow biosensors for medical applications to be integrated at low cost with a 3D integration scheme. The final objective of the project is to demonstrate 3D above-IC integration of nanonet-based sensing devices on a CMOS platform. By using nanonets as sensing material, our synergetic app ...
Read Project

 6

 FINISHED 

European Space Robot Control Operating System (ESROCOS)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

The ESROCOS activity is devoted to the design of a Robot Control Operating Software (RCOS) that can provide adequate features and performance with space-grade Reliability, Availability, Maintainability and Safety (RAMS) properties. The goal of the ESROCOS proposal is to provide an open source framework which can assist in the generation of flight software for space robots. By providing an open sta ...
Read Project

 10

 FINISHED 
This European Training Network aims to produce the next generation of early stage researchers who will enable Europe to take a leading role in the development of future devices, systems and networks supporting the 5G high-speed wireless internet. To do this, researchers must be able to work in interdisciplinary teams, integrate their activities, share expertise, and promote a vision of a converged ...
Read Project

 10

 FINISHED 
VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Read Project

 11

 FINISHED 

Spatial Augmented Reality as a Key for co-creativity (SPARK)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The SPARK project aims at realizing a responsive and intuitive ICT platform that exploit the potential of Spatial Augmented Reality (SAR) to show designers and customers real-like solutions in the form of mixed prototypes (partially virtual and partially physical) during brainstorming sessions. The SPARK platform allows designers and customers to freely work together within the paradigm of open-in ...
Read Project

 8

 FINISHED 
BISON will enhance the collaborative framework of the Central European Institute of Technology of Masaryk University (CEITEC MU), which was created during 2011-14 by utilising synergies of Structural Funds and the Framework Programme, with its three internationally-leading counterparts in the fields of structural biology by extending expertise related trans-disciplinary areas. The goal is to stimu ...
Read Project

 5