Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 
The thermal-hydraulics Simulations and Experiments for the Safety Assessment of Metal cooled reactor (SESAME) project supports the development of European liquid metal cooled reactors (ASTRID, ALFRED, MYRRHA, SEALER). The project focusses on pre-normative, fundamental, safety-related, challenges for these reactors with the following objectives:• Development and validation of advanced numerical app ...
Read Project

 24

 FINISHED 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Read Project

 14

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 
The coordination action SITEX-II aims at implementing in practice the activities along with the interaction modes issued by the FP7 program SITEX project (2012-2013), in view of developing an Expertise function network. This network is expected to ensure a sustainable capability of developing and coordinating joint and harmonized activities related to the independent technical expertise in the fie ...
Read Project

 18

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 

Code for European Severe Accident Management (CESAM)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Read Project

 21

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

MyrrhA Research Infrastructure Support Action (MARISA)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Read Project

 17

 FINISHED 

Full Scale Demonstration of Plugs and Seals (DOPAS)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

DOPAS aims to improve the adequacy and consistency regarding industrial feasibility of plugs and seals, the measurement of their characteristics, the control of their behavior over time in repository conditions and also their hydraulic performance acceptable with respect to the safety objectives.This DOPAS project addresses the design basis, reference designs and strategies to demonstrate the comp ...
Read Project

 17

 FINISHED 
"This project will support the ESNII (European Sustainable Nuclear Industrial Initiative) roadmap and the Strategic Research Agenda and the Deployment Strategy of SNETP (Sustainable Nuclear Energy Technology Platform) on the enhancement of Sodium-cooled Fast neutron Reactors (SFR) safety, especially towards a higher resistance to severe accidents.In the initiation phase of SFR core disruptive acci ...
Read Project

 9

 FINISHED 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Read Project

 25

 FINISHED 

Thermal-hydraulics of Innovative Nuclear Systems (THINS)

Start date: Feb 1, 2010, End date: Jan 31, 2015,

For the long-term development of nuclear power, innovative nuclear systems such as Gen-IV reactors and transmutation systems need to be developed for meeting future energy challenges. Thermal-hydraulics is recognized as a key scientific subject in the development of innovative reactor systems. This project is devoted to important crosscutting thermal-hydraulic issues encountered in various innovat ...
Read Project

 24

 FINISHED 

Long-term performance of Engineered Barrier Systems (EBS) (PEBS)

Start date: Mar 1, 2010, End date: Feb 28, 2014,

The main aim of the project PEBS (Long-term Performance of the Engineered Barrier System) is to evaluate the sealing and barrier performance of the EBS with time, through development of a comprehensive approach involving experiments, model development and consideration of the potential impacts on long-term safety functions. The experiments and models cover the full range of conditions from initial ...
Read Project

 18

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22

 FINISHED 
SITEX aims at identifying the efficient means that should be developed through the establisment of a sustainable expertise function network within a European framework with the view to:- allowing mutual understanding between regulatory bodies, TSOs and waste management organisations (WMOs) on (i) the regulatory expectations at decision holdpoints and (ii) how the scientific and technical elements ...
Read Project

 16

 FINISHED 

Fate of Repository Gases (FORGE)

Start date: Feb 1, 2009, End date: Sep 30, 2013,

"The multiple barrier concept is the cornerstone of all proposed schemes for underground disposal of radioactive wastes. The concept invokes a series of barriers, both engineered and natural, between the waste and the surface. Achieving this concept is the primary objective of all disposal programmes, from site appraisal and characterisation to repository design and construction. However, the perf ...
Read Project

 25

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 

NUclear Reactor Integrated Simulation Project (NURISP)

Start date: Jan 1, 2009, End date: Jun 30, 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Read Project

 23

 FINISHED 

REDOX PHENOMENA CONTROLLING SYSTEMS (RECOSY)

Start date: Apr 1, 2008, End date: Mar 31, 2012,

Main objectives of ReCosy are the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal and providing tools to apply the results to Performance Assessment/Safety Case. Although redox is not a new geochemical problem, different questions are still not resolved and thus raised by implementers and scientists. From a top-down appr ...
Read Project

 32

 FINISHED 
The aim of this proposal is to enable present and future professionals on radioactive waste management in Europe, whatever their initial disciplinary background, to follow a training programme on geological disposal which would be widely recognized across Europe. This ambitious aim will only be achieved over a close collaboration between all stakeholders and through an effective and flexible use o ...
Read Project

 16

 FINISHED 
The objective of this coordination action is to develop best practice guidelines for the performance of Level-2 PSA methodologies with a view to harmonization at EU level and allowing a meaningful and practical uncertainty evaluation in a Level-2 PSA. Speficic relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, research or services companies) ...
Read Project

 23

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27