Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Advanced Research Initiatives for Nutrition & Aquaculture (ARRAINA)

Start date: Jan 1, 2012, End date: Dec 31, 2016,

Sustainable development of European fish farming is dependent on the availability, environmental sustainability of feeds relying less and less on capture fisheries derived fishmeal and fish oil. The European aquaculture industry has made a determined shift towards the use of feeds based on alternative ingredients which continue to ensure the health and welfare of fish and the nutritional value of ...
Read Project

 23

 FINISHED 

European Cloud Marketplace for Intelligent Mobility (ECIM)

Start date: Jan 1, 2014, End date: Jun 30, 2016,

ECIM will develop a state-of-the-art solution that combines the strong cloud capabilities of an existing CIP cloud-based platform, EPIC, with new functionalities that facilitate the easy migration of existing city services and innovative creation of new ones. In so doing, ECIM will 1) provide a pathway for cities and businesses to easily migrate services to the cloud, 2) open these services to inn ...
Read Project

 14

 FINISHED 
As we move inextricably into a digital economy there is a looming crisis for a growing number of increasingly marginalized individuals. The accessibility technologies we have are meeting the needs of only some, at high cost, and will not work with many new technologies. The path and pace of technological change predestines these approaches to fail in the very near future. At the same time the inci ...
Read Project

 30

 FINISHED 

Governments ENabled with IPv6 (GEN6)

Start date: Jan 1, 2012, End date: May 31, 2015,

The pilot GEN6 will have 4 different national experiments (also called pilots), some of them replicated in a complementary way in different countries, considering different existing approaches with IPv4:1.\tIPv6 upgrade of eGovernment Network Infrastructures, e-Identification, Services and Applications (Germany, Spain, Netherlands and Turkey).2.\tIPv6 upgrade of Secure Cloud Services (Luxembourg). ...
Read Project

 20

 FINISHED 
Motivation. The last decades brought an exponential increase in mobile traffic volume. This will continue and a 1000-fold increase by 2020 has been forecasted. Small-cells promise to provide the required data rates through an increased spatial utilisation of the spectrum.Problem statement. Due to strong inter-cell interference, small-cell deployments will require a high degree of coordination as o ...
Read Project

 12

 FINISHED 
Offering collective and participative experiences to real-world and online communities is at the heart of the Future Media Internet (FMI) and will form an essential part of entertainment, education, collaborative working, product and service innovation and advertising. Communities involved potentially include hundreds of professionals, tens of thousands at live public events and millions online. C ...
Read Project

 25

 FINISHED 

Towards Zero Waste in Industrial Networks (ZeroWIN)

Start date: May 1, 2009, End date: Apr 30, 2014,

The first work package will define a common vision on zero-waste entrepreneurship within the first 6 months. The mythos Individual Producer Responsibility will be investigated if it can become the all-healing-solution in electronics industry as well as how this concept can be applied to other industrial sectors. WP2 concentrates on new technological developments, WP3 on waste prevention methodolog ...
Read Project

 33

 FINISHED 

A quantitative model of thrombosis in intracranial aneurysms (THROMBUS)

Start date: Feb 1, 2011, End date: Apr 30, 2014,

..., in order to induce thrombosis formation. Recent Pipieline stents allowing simple or multiple devices constructs with variable flow disruption will be investigated. Our project will study through numerical simulation the effect of stent configuration in patient specific geometry and will help explain why some stents produce good thrombus while others don't. The project will develop a multiscale c ...
Read Project

 10

 FINISHED 
Objective: To delineate the biological and molecular pathways that initiate and drive chronic inflammatory disease and to transform the knowledge obtained into the development of novel anti-inflammatory interventions. Focus will be given to Rheumatoid Arthritis (RA) since longitudinal data indicate that intensive treatment can prevent persistency and chronicity. State of the Art and beyond: The ...
Read Project

 20

 FINISHED 

European Eels in the Atlantic: Assessment of Their Decline (EELIAD)

Start date: Apr 1, 2008, End date: Sep 30, 2012,

"Eels play an important socioeconomic and ecological role in many European countries. Recruitment failure has contributed to a halving of catches from 40,000t in the last three decades to less than 20,000t today. The EU’s Eel Recovery Plan aims to maximize silver eel production and escapement to the sea to maintain the stock’s reproductive potential. However, very little is known about the contri ...
Read Project

 13

 FINISHED 
The main objective of Idealist2011 is reinforcing the network of National Contact Points (NCP) for ICT under FP7, by promoting further trans-national cooperation within this network. Thiscooperation will not be reduced to only ICT NCPs but also a degree of collaboration and networking with similar networks in parallel themes (Security, SSH, ENV, Transport, Energy, Health,...etc) especially in the ...
Read Project

 40

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22

 FINISHED 
The co-operative Metafight project will perform functional studies to understand the dissemination and outgrowth of metastasis through systematic analysis of the Core Invasive Machinery contained within integrin-mediated ECM attachment structure. It includes a large and discretely localised intracellular signalling network which drives migration and invasion. Our strategy is based on the hypothesi ...
Read Project

 10