The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Read Project

 37

 FINISHED 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Read Project

 19

 FINISHED 

Metrology Excellence Academic Network for Smart Grids (MEAN4SG)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

MEAN4SG network aims to educate 11 young researchers in the smart grids metrology field by constructing a training network gathering the whole innovation value chain. The main EU actors in the field of smart grids metrology have worked together, under the umbrella of the European Association of National Metrology Institutes (EURAMET), and relying on the support of the International Electrotechnica ...
Read Project

 8

 FINISHED 
Our goal with the DEEPEGS project is to demonstrate the feasibility of enhanced geothermal systems (EGS) for delivering energy from renewable resources in Europe. Testing of stimulating technologies for EGS in deep wells in different geologies, will deliver new innovative solutions and models for wider deployments of EGS reservoirs with sufficient permeability for delivering significant amounts of ...
Read Project

 10

 FINISHED 

Energy CHOices supporting the Energy union and the Set-plan (ECHOES)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

ECHOES is a multi-disciplinary research project providing policy makers with comprehensive information, data, and policy-ready recommendations about the successful implementation of the Energy Union and SET plan. Individual and collective energy choices and social acceptance of energy transitions are analysed in a multi-disciplinary process including key stakeholders as co-constructors of the know ...
Read Project

 15

 FINISHED 

Closed Loop Wind Farm Control (CL-Windcon)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

Current practice in wind turbines operation is that every turbine has its own controller that optimizes its own performance in terms of energy capture and loading. This way of operating wind farms means that each wind turbine operates based only on the available information on its own measurements. This gets the wind farm to operate in a non-optimum way, since wind turbines are not operating as pl ...
Read Project

 15

 FINISHED 
The NextBase project, involving 8 research institutions and 6 companies, deals with the development of innovative high-performance c-Si solar cells and modules based on the interdigitated back-contacted silicon heterojunction (IBC-SHJ) solar cell concept targeting cells with efficiency above 26.0% and corresponding solar modules with efficiency above 22.0%. In particular, a number of new design an ...
Read Project

 15

 FINISHED 
MATChING goal is the reduction of cooling water demand in the energy sector through innovative technological solutions, to be demonstrated in thermal and geothermal power plants. The project targets include an overall saving of water withdrawal of 30% in thermal power generation, and a decrease of evaporative losses up to 15% in geothermal sector. The use of advanced and nano-technology based mate ...
Read Project

 17

 FINISHED 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Read Project

 21

 FINISHED 
...countries, each partner representing a different stakeholder in the value chain of the new sustainable product: TURBOALGOR from Angelantoni Group (Coordinator), AVL SCHRICK (turbocharger developer), ENEL.SI (ENEL Energy Service Company), AMORINO and AGRICOLA PAGNAN (both experts in Cold Energy management in the food sector).Forecasted cumulative turnover is EUR 60 million by 2022, only for the 5 c ...
Read Project

 5

 FINISHED 

Drilling in supercritical geothermal condition (DESCRAMBLE)

Start date: May 1, 2015, End date: Apr 30, 2018,

"The aim of the "Drilling in dEep, Super-CRitical AMBients of continentaL Europe: DESCRAMBLE" project is to develop novel drilling technologies for a proof-of-concept test of reaching deep geothermal resources and to contribute to a low-carbon European society. To achieve this target the first drilling in the world in an intra-continental site at a middle-crustal level will be performed. The test ...
Read Project

 7

 FINISHED 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Read Project

 17

 FINISHED 
...ering all the components needed for power generation as well as CO2 capture and compression.Operability and flexibility of first generation post combustion processes are demonstrated by TNO, EnBW and ENEL pilot plants in order to prepare full scale demo projects such as the ROAD and Porto Tolle projects that will start in 2015. OCTAVIUS will establish detailed guidelines with relevant data on emis ...
Read Project

 18

 FINISHED 
With the growing relevance of distributed renewable energy sources (DRES) in the generation mix and the increasingly pro-active demand for electricity, power systems and their mode of operation need to evolve. evolvDSO will define future roles of distribution system operators (DSOs) on the basis of scenarios which will be driven by different DRES penetration levels, various degrees of technologica ...
Read Project

 16

 FINISHED 
DAREED aims at delivering an ICT service platform (and some specific tools) to foster energy efficiency and low carbon activities at neighbourhood, city and district level. Project results will be validated via pilots in three (3) different countries and contexts, thus granting the possibility to generalise results and ensuring replicability throughout Europe and beyond.The key success factor for ...
Read Project

 14

 FINISHED 
...ommitments and permits are already in place. EGP has a strong experience in design and implementation of industrial power plant expecially in renewable, through respectively expertise of company ENEL Innovation and Engineering.LEC expected from ARCHETYPE SW550 should be 0.21 €/kWh; during the operation the values of energy production and the cost of operation will be constantly monitored to verify ...
Read Project

 6

 FINISHED 

CIVIS

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Smart grids make current energy networks more intelligent and accessible; new ways of producing energy will soon make citizens not only energy users but also energy producers. The CIVIS project explores the potential of social networks and communities to significantly reduce energy use and carbon emissions. We'll enable this by developing business models for the resulting energy value system and s ...
Read Project

 12

 FINISHED 
This proposal addresses the global problem of mercury (Hg) emissions from coal-fired plants and the current position of conventional air pollution control devices (APCDs) only providing partial solution for oxidized Hg capture, particularly for low-rank coals.Our previous work has shown that (1) low-cost gasification chars have superior mercury capture performance than current benchmark carbons; a ...
Read Project

 8

 FINISHED 

People Centric easy to implement e-mobility (FREE-MOBY)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The FREE-MOBY project is focused to the implementation of easy to deploy micro fully electrical vehicles (450-650kg and speeds up to 90+ km/h)) and city EVs (650-1000kg).By an extra cost of only 15% solar installations in roof houses can be integrated with robust battery packs that can smooth peak powers up to 30%. Solar parking and integrated photovoltaic-battery installations are becoming more a ...
Read Project

 14

 FINISHED 

INternet Cleantech ENablers Spark (INCENSe)

Start date: Sep 1, 2014, End date: Aug 31, 2016,

...ger to develop innovative internet-based services and applications in CleanTech field.The INCENSe consortium joints efforts of two best-in-class existing acceleration initiatives in the Energy field (ENEL LAB and ACCELERACE), which have decided to share their knowledge to rapidly connect to existing communities of innovative SMEs and WEs. This knowledge is complemented with the industrial vision o ...
Read Project

 5

 FINISHED 
INGRID introduces and demonstrates the usage of safe, high-density solid-state hydrogen storage systems as an effective energy vector to balance the grid also by powering off-grid applications, thus enabling a smart balance between variable green energy sources supply and the grid demand. To reach its ambitions objective, the INGRID project will focus on:• The usage of new hydrogen solid-state sto ...
Read Project

 7

 FINISHED 

IntegratinG Renewables in the EuropEaN Electricity Grid (IGREENGRID)

Start date: Jan 1, 2013, End date: Mar 31, 2016,

IGREENGrid focuses on increasing the hosting capacity for Distributed Renewable Energy Sources (DRES) in power distribution grids without compromising the reliability or jeopardizing the quality of supply. Based on the experience of six world class DRES integration Demo Projects in low & medium voltage grids (led by some of EEGI members; Distribution System operators –DSOs-) and other EU initiativ ...
Read Project

 12

 FINISHED 
The anticipated mass roll-out of electric vehicles (EVs) in Europe and the continuously increasing number of distributed energy resources (DER) are posing major challenges to Europe’s Distribution System Operators (DSOs) with regard to ensuring a secure and reliable energy supply and network operation. Despite ongoing research and demonstration activities in this field, particularly the developmen ...
Read Project

 12

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 
"European oceans will be subject to massive development of marine infrastructure in the near future. The most obvious is the energy facilities e.g. offshore wind farms, exploitation of wave energy, expansion of electricity connections, and also further development and implementation of marine aquaculture. This will also lead to an increased need for marine infrastructure to support installation an ...
Read Project

 29

 FINISHED 
Most coal-fired utility boilers are fired with pulverised coal and the use of this technology for power generation far outweighs that of alternatives. The consortium have identified key issues that need to be addressed to pave the way for full-scale deployment of oxy-coal firing. As most previous work has been undertaken at pilot-scale so that, in addition to medium scale demonstration activities, ...
Read Project

 13

 FINISHED 

Tools for Enhanced Photovoltaic System Performance (PERFORMANCE PLUS)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

For a continued decrease of levelised costs of energy from photovoltaics (PV), the prices of PV system components have to be further decreased while performance, functionality, reliability and lifetime on the component and system level need to be increased. In an integrated view, PV system performance emerges from, but is not limited to the performance of the components. The Performance Plus proje ...
Read Project

 9

 FINISHED 
...50 homes, partly located in Italy and partly located in Denmark. The system will include devices such as energy gateways, smart meter or smart info (depending on the location, smart info will work in ENEL electricity grid), smart plugs, a smart appliance, connected thermostats to control HVAC system. The specific devices to be installed in the system will be evaluated during the project developmen ...
Read Project

 8

 FINISHED 
INERTIA will introduce the Internet of Things/Services principles to the Distribution Grid Control and DSM Operations. It will provide an overlay network for coordination and active grid control, running on top of the existing grid and consisting of distributed and autonomous intelligent Commercial Prosumer Hubs. This way, it will address the present "structural inertia" of DG by introducing more ...
Read Project

 11

 FINISHED 

CRitical Infrastructure Security AnaLysIS (CRISALIS)

Start date: May 1, 2012, End date: Aug 31, 2015,

"The CRISALIS project aims at providing new means to secure critical infrastructure environments from targeted attacks, carried out by resourceful and motivated individuals. The recent discovery of a malware called Stuxnet, show that these threats are already a reality. Their success in infiltrating Critical Infrastructure environments is calling attention on the ineffectiveness of standard securi ...
Read Project

 10

 FINISHED 

TRANSFORMation Agenda for Low Carbon Cities (TRANSFORM)

Start date: Jan 1, 2013, End date: Jun 30, 2015,

Urban areas are responsible for three quarters of the global energy demand. Most decisions on implementing energy innovations are made in cities. TRANSFORM supports cities to meet the 20-20-20 targets by the integration of energy in urban management. In interactive Smart Urban Labs, stakeholders will be able to turn ambitions into tangible Implementation Plans.TRANSFORM’s integrative approach brin ...
Read Project

 20

 FINISHED 

SMART MOBILITY IN SMART CITY (MOBINCITY)

Start date: Jul 1, 2012, End date: Jun 30, 2015,

Urban transport is responsible for about a quarter of CO2 emissions from transport. The gradual phasing out of 'conventionally-fuelled' vehicles from the urban environment is a major contribution to significant reduction of oil dependence, greenhouse gas emissions and local air and noise pollution. Fully Electric Vehicles (FEV), for public and private transport, can contribute significantly to the ...
Read Project

 13

 FINISHED 

Wireless charging for Electic Vehicles (UNPLUGGED)

Start date: Oct 1, 2012, End date: Mar 31, 2015,

UNPLUGGED project aims to investigate how the use of inductive charging of Electric Vehicles (EV) in urban environments improves the convenience and sustainability of car-based mobility. In particular, it will be investigated how smart inductive charging infrastructure can facilitate full EV integration in the urban road systems while improving customer acceptance and perceived practicality. UNPLU ...
Read Project

 17

 FINISHED 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Read Project

 44

 FINISHED 

PhotoVoltaic European Research Infrastructure (SOPHIA)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

The objective of the SOPHIA project is to strenghten and optimise research capabilities, mainly by coordinating efforts on important but precompetitive issues. Large research infrastructures working together will avoid the useless replication of a large number of small efforts. The SOPHIA project aims at pulling together the main European photovoltaic research infrastructures in order to provide t ...
Read Project

 22

 FINISHED 
Background Bats and raptors are two of the most threatened animal groups in Europe. Bats have been a protected species since 1939 and are included in the annexes of Bern Convention and the Habitat Directive. Out of the 34 species listed for Italy, 25 species have been recorded in Tuscany. The other targeted species of the project, the red kite (Milvus mil ...
Read Project

 3

 FINISHED 

Energy Distribution Infrastructure for Ssl Operative Networks (EDISON)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

The EDISON Pilot Actions aim to demonstrate, under real operational conditions, that a smart lighting system improves energy efficiency, reduces CO2 emissions and encourages the use of small-scale renewable energy sources in European public buildings (e. g. schools, museums, administrative offices, hospitals, etc.). The Pilot Actions are based on the use of Solid State Lamps (SSLs) combined with ...
Read Project

 14

 FINISHED 

Active Demand Value ANd Consumers Experiences Discovery (ADVANCED)

Start date: Dec 1, 2012, End date: Nov 30, 2014,

...ign will be derived taking privacy and security into account. The consortium of key European DSOs, scientific institutions, an energy consultancy, a market research company and a DR aggregator led by Enel is an ideal starting point for the 24-months project both in terms of the expertise and the data access. It will be supported by a Stakeholder Advisory Board composed of the main AD target groups ...
Read Project

 10

 FINISHED 
The ENCOURAGE project aims to develop embedded intelligence and integration technologies that will directly optimize energy use in buildings and enable active participation in the future smart grid environment. The desired energy savings will be achieved in three complementary ways. Firstly, by developing supervisory control strategies that will be able to coordinate larger subsystems (HVAC,lighti ...
Read Project

 12

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43