Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Metrology Excellence Academic Network for Smart Grids (MEAN4SG)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

MEAN4SG network aims to educate 11 young researchers in the smart grids metrology field by constructing a training network gathering the whole innovation value chain. The main EU actors in the field of smart grids metrology have worked together, under the umbrella of the European Association of National Metrology Institutes (EURAMET), and relying on the support of the International Electrotechnica ...
Read Project

 8

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Read Project

 43

 FINISHED 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Read Project

 35

 FINISHED 

Interfaces in opto-electronic thin film multilayer devices (INFORM)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

Development of new materials over the past decade paved the way for organic/hybrid electronics into commercial applications. Now, perfection of material interfaces in organic/hybrid thin-film devices is key to drive the technology further and enable new, more advanced applications. INFORM offers a paradigm shift from focusing on materials to focusing on devices by probing, modelling and controllin ...
Read Project

 11

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Directed Colloidal Structure at the Meso-Scale (DiStruc)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Fluid dispersions containing highly elongated colloidal particles form a plethora of ordered, liquid-crystalline states as well as glassy and gel-like disordered states already at very low concentrations. In spite of their remarkable properties, industrial applications of such dispersions have entered the market only relatively recently, in contrast to more conventional low-molecular-weight, liqui ...
Read Project

 8

 FINISHED 

Coordination of Automated Road Transport Deployment for Europe (CARTRE)

Start date: Oct 1, 2016, End date: Sep 30, 2018,

Automated Road Transport (ART) is seen as one of the key technologies and major technological advancements influencing and shaping our future mobility and quality of life. The ART technology encompasses passenger cars, public transport vehicles, and urban and interurban freight transport and also extends to the road, IT and telecommunication infrastructure needed to guarantee safe and efficient op ...
Read Project

 36

 FINISHED 
I - Over forty million workers in the EU are affected by work-place related musculoskeletal disorders, as a result of working in painful or tiring positions and handling heavy loads with repetitive hand or arm movements.II - The aging population is growing fast and approaching the mean age where loss of function and hence loss of mobility is to begin. In addition to diabetic and obesity, in 5 year ...
Read Project

 13

 FINISHED 
IbD® will create a holistic platform for facilitating process intensification in processes in which solids are an intrinsic part, the cornerstone of which will be an intensified-by-design® (IbD). The IbD approach is hinged on the use of robust data about a process to ‘redesign’, modify, adapt and alter that process in a continuous, intensified system, and will be the new paradigm in the intensific ...
Read Project

 23

 FINISHED 

PhD on Innovation Pathways for TES (INPATH-TES)

Start date: May 1, 2015, End date: Apr 30, 2018,

Following the EC SET-Plan Education and Training Roadmap, the concept of this proposal is to develop a joint PhD programme between universities and research centres, on the topic of Thermal Energy Storage (TES). The goal of INPATH-TES is to create a network of universities and research institutes to implement a joint PhD programme on TES technologies. The final result of such a network is to educa ...
Read Project

 22

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Quality Assurance for Essential Climate Variables (QA4ECV)

Start date: Sep 27, 2013, End date: Jan 1, 2018,

Policy makers are increasingly relying on Earth Observation (EO) data to make decisions on mitigating and adapting to climate change. These decisions need to be 'evidence-based' and this requires complete confidence in EO-derived products. Although EO data is plentiful, it is rare to have reliable, traceable and understandable quality information. The situation is often further confused because va ...
Read Project

 19

 FINISHED 
ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Read Project

 29

 FINISHED 
"ECCO-MATE aims to create a research and training platform for the development and implementation of novel fuel mixture preparation, injection profiling, air management and staged/low temperature combustion technologies both in marine and light-duty automotive diesel engines. The marine (slow speed, large-sized, two-stroke engines) and land-transport (high speed, small-to-medium-sized, four-stroke ...
Read Project

 12

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
The role of Data Centres (DCs) is vital for the Future Internet. However, DC infrastructures are already stressed by data volumes and service provisioning and consumption trends. Emerging demands cannot be addressed by today's DCs and call for a massive redesign or even transformation of DC architectures.COSIGN proposes a new DC architecture empowered by advanced optical technologies and will demo ...
Read Project

 14

 FINISHED 
Energy harvesting at low frequency has proven to be difficult to achieve in the past because of the properties of the materials that the devices are fabricated from. In particular the stiffness of conventional silicon and all piezoelectric materials makes it exceedingly difficult to make a system that can operate below 100Hz. There are many sources of low frequency vibrations e.g. human motion, th ...
Read Project

 9

 FINISHED 
"Combustion instabilities represent a serious problem for combustion-driven devices, such as gas turbine engines and domestic burners. These instabilities can cause intense pressure oscillations, which in turn causes excessive structural oscillations, fatigue and even catastrophic damage to combustor hardware. In recent years, the development of clean combustion systems with reduced pollution of t ...
Read Project

 9

 FINISHED 

Globally optimized ENergy efficient data Centres - GENiC (GENiC)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Data Centre (DC) energy consumption has doubled between 2000 and 2005 and grew by 50% from 2005 to 2010 consuming 1.5% of global energy with continued rapid growth. On average, computing consumes 60% of total energy while cooling consumes 35%. While new technology can lead to a 40% reduction computation and cooling typically operate without coordination or optimization. While server energy managem ...
Read Project

 8

 FINISHED 

Soft Matter at Aqueous Interfaces (SOMATAI)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

Soft nanotechnology is generally considered as a field that will have a major impact on technological developments in near future. However, the fundamental understanding of the wealth of new structures lacks far behind, despite supporting activity from material science. Such an understanding is indispensable for sustainable growth of this important research domain and its applications. A physics-o ...
Read Project

 14

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

Technology Transfer in Computing Systems (TETRACOM)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Read Project

 33

 FINISHED 

Microwave, Ultrasonic and Plasma assisted Syntheses (MAPSYN)

Start date: Dec 1, 2012, End date: May 31, 2016,

The proposed project, MAPSYN, aims to bring selected innovative energy efficient chemical reaction processes, assisted with novel microwave, ultrasonic and plasma systems, up to the manufacturing scale. A pragmatic approach of using these selected alternative energy sources for end user selected reactions, will be individually studied for both microreactor and flow reactor systems (i.e. continuous ...
Read Project

 15

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

Devices for Neurocontrol and Neurorehabilitation (DENECOR)

Start date: Jun 1, 2013, End date: Mar 31, 2016,

The primary aim of DeNeCor is to resolve this top issue such that electronic neuromodulation therapy becomes mainstream and full market potential can be obtained. We will increase acceptance by neurologists by demonstrating designed co-existency between therapy devices and diagnostic systems. The second aim of DeNeCor is to extrapolate the ‘bilateral’ agreements between AIMD and MRI manufactures i ...
Read Project

 22

 FINISHED 

Authentication and Authorisation for Entrusted Unions (AU2EU)

Start date: Dec 1, 2013, End date: Nov 30, 2015,

...ategic research agenda. The project brings together a strong collaboration of leading industry (such as Philips, IBM, NEC, Thales), SMEs (such as Bicore) and research organizations of Europe (such as Eindhoven University of Technology) and Australia (such as CSIRO, Edith Cowan University, RMIT University, University of New South Wales & Macquarie University) as well as the large voluntary welfare ...
Read Project

 13

 FINISHED 
Computing systems are getting ever more ubiquitous, making usdependent on their proper functioning. Therefore we require that theyare correct (i.e. they conform their intended behavior), safe (i.e.itsoperation does not have catastrophic consequences), reliable,available to provide the intended service, and secure (i.e., no userwithout appropriate clearance can access or modify protected data).Guar ...
Read Project

 8

 FINISHED 
The project aims to increase sustainable freight transport. relieve congestion at key bottlenecks. remove technical barriers to modal shift and using ICT to make better use of existing infrastructure capacity in NWE. including by changing private sector behaviour. NWE manufacturing is increasingly outsourced and far eastern markets for NWE products are growing rapidly. The project treats log ...
Read Project

 22

 FINISHED 
The objective of PARADIGM is to effect a fundamental change in the way photonic integrated circuits (PICs) based on indium phosphide (InP) are designed and manufactured in Europe, with the aim of reducing the costs of design, development and manufacture by more than an order of magnitude and making more complex and capable designs possible than ever before.The key step is to develop a generic plat ...
Read Project

 19

 FINISHED 
Safety assurance and certification are amongst the most expensive and time-consuming tasks in the development of safety-critical embedded systems. European innovation and productivity in this market is curtailed by the lack of affordable (re)certification approaches. Major problems arise when evolutions to a system entail reconstruction of the entire body of certification arguments and evidence. F ...
Read Project

 21

 FINISHED 
Context awareness has the potential to revolutionise the way people interact with information technology. Whereas conventional computers merely interpret explicit user input, context-aware systems analyse and automatically respond upon users’ behaviour and situation he/she is in. This enables electronic systems to assist users in situations in which the use of conventional computers and mobile d ...
Read Project

 15

 FINISHED 
Corporate Social Responsibility (CSR) is defined as "a concept whereby companies integrate social and environmental concerns in their business operations and in their interaction with their stakeholders on a voluntary basis."In recent years, public entities have recognised CSR’s potential as organisational innovation to improve social conditions and promote regional development and competitiveness ...
Read Project

 13

 FINISHED 

Fieldlab Sport Innovation & Stimulation (PRO-FIT)

Start date: Sep 24, 2009, End date: Dec 29, 2014,

...ations and catalyze and create new business opportunities. They will also improve the health and well-being of the citizens living in the surrounding areas. Partners are a combination of cities (Eindhoven. Sheffield. Kortrijk. Delft) and knowledge institutions in the field of sports-related monitoring and design. They are supported by their regional Chambers of Commerce. observers in France. Sw ...
Read Project

 10

 FINISHED 

Ultra Wide Context Aware Imaging (PANORAMA)

Start date: Jan 1, 2012, End date: Dec 1, 2014,

In many application domains all over the world there is a trend from “single-view imaging” towards “multi-view imaging”. Some examples are the introduction of 3D/4D imaging in Healthcare, High Definition TV and beyond in Broadcasting, multiple connected Surveillance Cameras for monitoring a scene. These applications have in common that they all involve an explosive growth in the generation of imag ...
Read Project

 17

 FINISHED 
Climate change is one of the most critical global challenges of our time which also threatens cultural heritage. As a non-renewable important resource to the European identity, sustainable adaptation strategies are required for long term preservation. For this purpose and for the first time ever, the CLIMATE FOR CULTURE project will couple completely new high resolution (10x10km) climate change ev ...
Read Project

 28

 FINISHED 
POLYCAT provides an integrated, coherent and holistic approach utilizing novel polymer based nanoparticulate catalysts in pharmaceutical, crop protection and vitamin syntheses in conjunction with the enabling functions of micro process technology and “green” solvents such as water or ethyl lactate. This provides a discipline bridging approach between fine chemistry, catalysis and engineering. This ...
Read Project

 22

 FINISHED 

Delivering Local Bioenergy to NW Europe (BioenNW)

Start date: Mar 31, 2010, End date: Mar 30, 2014,

...support companies, organisations and local authorities to deliver local bioenergy more efficiently and cost-effectively. Five BSCs have been created to date and they are located in the regions of:• Eindhoven, The Netherlands• Ile-de-France, France• Saarland, Germany• Wallonia, Belgium• West Midlands, UK The BSCs provide expertise and advice to help you to realise the economic and environmental ben ...
Read Project

 15

 FINISHED 

PREPARED “ENABLING CHANGE” (PREPARED)

Start date: Feb 1, 2010, End date: Jan 31, 2014,

IPCC climate change scenarios have a global perspective and need to be scaled down to the local level, where decision makers have to balance risks and investment costs. Very high investments might be a waste of money and too little investment could result in unacceptable risk for the local community. PREPARED is industry driven, 12 city utilities are involved in the project and the RDT carried out ...
Read Project

 36

 FINISHED 

Fronts and Interfaces in Science and Technology (FIRST)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

Space-time phenomena giving rise to fronts and interfaces are central issues in many contexts of Science and Technology. A selection of some of the most challenging ones, most often of multi-disciplinary character, will be pursued by a team of 10 Full Partner Members (8 universities of different countries and two industries, Guigues Environnement (France) and Siemens (Germany)) with the help of 4 ...
Read Project

 11

 FINISHED 

Flexible, Fast and Future Production Processes (F³ FACTORY)

Start date: Jun 1, 2009, End date: Jul 31, 2013,

The F3 consortium’s vision is that the EU’s chemical industry’s competitive position would be strongly enhanced if it could operate modular continuous plant (F3 plant) which combines world scale continuous plant efficiency, consistency and scalability with the versatility of batch operation. Our project will deliver such a radically new production mode based on: a) Plug–and–play modular chemical ...
Read Project

 29