Search for European Projects

20 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...l. space data), free software & data processing tools, to develop new applications.FabSpace 2.0 will provide a new free-access service and place dedicated to collaborative data-driven innovation in 6 European universities (13 at the end of the project). Through online support, entrepreneurship & innovation leadership trainings for students and researchers, the human capital among FabSpace users wi ...
Read Project

 16

 FINISHED 
... basin, which are characterized by highly variable river flows and the occurrence of low flows. This has resulted in increases in frequency and magnitude of extreme flow events. Furthermore, in other European regions such as eastern Germany, western Poland and England, water demand exceeds water availability and water scarcity has become an important management issue. Water scarcity is most common ...
Read Project

 27

 FINISHED 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Read Project

 39

 FINISHED 
Today’s driver assistance systems offer comfort and safety in sound environmental conditions. However, in harsh environment conditions – when needed most – systems stop working due to reduced sensor information quality. Targeting to the area of highly automated driving the improvement of perception, decision and planning under adverse conditions is one of the main challenges to be addressed. Robus ...
Read Project

 15

 FINISHED 

5G Exchange (5GEx)

Start date: Oct 1, 2015, End date: Mar 31, 2018,

...tructure services will provide a crucial role in making 5G happen as they provide the foundation of all cloud and networking services. 5GEx aims to enable, through operator collaboration, a unified European infrastructure service market integrating multiple operators and technologies, where service provisioning is fast and automated and which results in stronger economy via economies of scale.
Read Project

 20

 FINISHED 
The exponential growth of mobile traffic, drastically increasing of network complexity, and the strong need for inter-network coordination of wireless network resources call for breakthroughs in control, coordination and flexible spectrum management in 5G heterogeneous radio access networks. The COHERENT project aims to address these problems by researching, developing and validating a novel cont ...
Read Project

 14

 FINISHED 
...xamine the need for corresponding changes in regulation.By demonstrating these results, AdaptIVe will significantly improve the knowledge base for automated driving and strengthen the position of European industries in the area of Intelligent Vehicles and road safety.
Read Project

 32

 FINISHED 
Traditionally, the European manufacturing industry is characterized by innovative technology, quality processes and robust products which have leveraged Europe's industrialization. However, globalization has exposed Europe's industry to new emerging and industrialized manufacturing markets and the current economic challenges have decelerated the internal boost and investment, respectively. Hence, ...
Read Project

 29

 FINISHED 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

...emonstration: The success of the project will be demonstrated via innovative leading-edge cooperative applications and a Europe-wide mobility experiment to illustrate the systems' benefits in a pan-European setting.
Read Project

 27

 FINISHED 
...ough high capacity NSI-enabled networks (e.g. JGN-X, GéANT, GLIF or NRENs), offering the creation of the experimental landscape in a dynamic and seamless way in order to satisfy demanding needs of European and Japanese research communities. The on-demand setup of OpenFlow-based network slices, including compute and storage resources, will be realized through an extended-NSI, the OGF standard for p ...
Read Project

 6

 FINISHED 

Unifying Cloud and Carrier Networks (UNIFY)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Read Project

 16

 FINISHED 
This project will be carried out within the FP7 Work Programme 2011 COOPERATION of the European Commission addressing the objective GC-ICT-2011.6.8 ICT for fully electric vehicles. In particular, the project aims at fulfilling the specific targeted outcome f): Integration of the FEV in the cooperative transport infrastructure. It proposes will develop an integrated IT platform that enables the con ...
Read Project

 14

 FINISHED 
...ilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transition to a sustainable pan-European e-Infrastructure started in EGEE-III. It will sustain support for Grids of high-performance and high-throughput computing resources, while seeking to integrate new Distributed Computing Infra ...
Read Project

 143

 FINISHED 
The objective of the DRIVE C2X Integrated Project is to carry out comprehensive assessment of cooperative systems through Field Operational Tests in various places in Europe in order to verify their benefits and to pave the way for market implementation. This general objective is split into four major technical objectives:\n•Create a harmonised Europe-wide testing environment for cooperative syste ...
Read Project

 36

 FINISHED 

interactIVe

Start date: Jan 1, 2010, End date: Nov 30, 2013,

...ers, and research institutes.By demonstrating these results, interactIVe will significantly enhance the feasibility and attractiveness of next-generation safety systems, strengthening the position of European industries in the area of Intelligent Vehicles and e-Safety.
Read Project

 32

 FINISHED 

Open Flow in Europe: Linking Infrastructure and Applications (OFELIA)

Start date: Sep 1, 2010, End date: Oct 31, 2013,

The aim of the OFELIA project is to create a unique experimental facility that allows researchers to not only experiment 'on' a test network but to control the network itself precisely and dynamically. To achieve this, the OFELIA facility is based on OpenFlow, a currently emerging networking technology that allows to virtualize and control the network environment through secure and standardized in ...
Read Project

 18

 FINISHED 

Split architecture carrier class future networks (SPARC)

Start date: Jul 1, 2010, End date: Sep 30, 2012,

The project SPARC "Split architecture carrier grade networks" is aimed at the investigation and implementation of a new split in the architecture of the Future Internet and its building blocks. The design of the new architecture will focus on the split of control, forwarding and data processing elements. The objective of the Split Architecture is a modularisation of logical and physical functional ...
Read Project

 6

 FINISHED 
The Intelligent Car Initiative has identified road safety, energy efficiency, and traffic congestion as the main challenges currently being faced by European transportation. Despite their severity, these issues may be improved with the use of new in-vehicle technologies currently not available in the market. However, implementing new technologies implies a risk to manufacturers. Factors such as di ...
Read Project

 35

 FINISHED 

Pan-European Laboratory Infrastructure Implementation (PII)

Start date: Jun 1, 2008, End date: Mar 31, 2011,

...tners constitute a highly competent, well-balanced consortium of SMEs, associations, academic institutions as well as large manufacturers and network operators, to mobilise the critical mass at European level to achieve the project objectives.
Read Project

 22

 FINISHED 

PRE-DRIVE

Start date: Jul 1, 2008, End date: Sep 30, 2010,

Based on the overall description of a common European architecture for an inter-vehicle and vehicle-to-infrastructure communication system PRE-DRIVE C2X shall develop a detailed system specification and a working as well as functionally verified prototype. It will be robust enough to be used in future field operational trials of cooperative systems. Furthermore PRE-DRIVE C2X shall develop an integ ...
Read Project

 27