Search for European Projects

22 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Read Project

 37

 FINISHED 
RESCCUE aims to deliver a framework enabling city resilience assessment, planning and management by integrating into software tools new knowledge related to the detailed water-centred modelling of strategic urban services performance into a comprehensive resilience platform. These tools will assess urban resilience from a multisectorial approach, for current and future climate change scenarios and ...
Read Project

 18

 FINISHED 

GrowSmarter

Start date: Jan 1, 2015, End date: Dec 31, 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Read Project

 41

 FINISHED 
MATChING goal is the reduction of cooling water demand in the energy sector through innovative technological solutions, to be demonstrated in thermal and geothermal power plants. The project targets include an overall saving of water withdrawal of 30% in thermal power generation, and a decrease of evaporative losses up to 15% in geothermal sector. The use of advanced and nano-technology based mate ...
Read Project

 17

 FINISHED 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Read Project

 21

 FINISHED 
P2P-SmartTest project investigates and demonstrates a smarter electricity distribution system integrated with advanced ICT, regional markets and innovative business models. It will employ Peer-to-Peer (P2P) approaches to ensure the integration of demand side flexibility and the optimum operation of DER and other resources within the network while maintaining second-to-second power balance and the ...
Read Project

 9

 FINISHED 

Zero Emission bUs Systems (ZEEUS)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Read Project

 41

 FINISHED 
DAREED aims at delivering an ICT service platform (and some specific tools) to foster energy efficiency and low carbon activities at neighbourhood, city and district level. Project results will be validated via pilots in three (3) different countries and contexts, thus granting the possibility to generalise results and ensuring replicability throughout Europe and beyond.The key success factor for ...
Read Project

 14

 FINISHED 

INternet Cleantech ENablers Spark (INCENSe)

Start date: Sep 1, 2014, End date: Aug 31, 2016,

...CCELERACE), which have decided to share their knowledge to rapidly connect to existing communities of innovative SMEs and WEs. This knowledge is complemented with the industrial vision of the sector, ENDESA, the link with FI-PPP Programme assured by ENEL participation in the FINSENY project, and the FUNDINGBOX's experience in public funding procurement and on-line social tools. The complementary s ...
Read Project

 5

 FINISHED 

Optimization of Oxygen-based CFBC Technology with CO2 capture (O2GEN)

Start date: Oct 18, 2012, End date: Oct 17, 2015,

... caused by CCS. The project is going to deals with this challenge.The project technical leaders are Foster Wheeler Energia Oy and Air Liquide, the demonstration facility is CIUDEN and the utility is Endesa Generación.
Read Project

 12

 FINISHED 
The intelligent and cost effective use of CCS technologies requires new strategies to increase the net efficiency of coal fired power plants. Among them, the most promising are summarised as below:- Increase working steam temperature and pressure in new USC power plants (350-370 bar, 700/720°C minimum), and hence increase the severity of fireside operating conditions,- Promote clean coal technolog ...
Read Project

 26

 FINISHED 

Wireless charging for Electic Vehicles (UNPLUGGED)

Start date: Oct 1, 2012, End date: Mar 31, 2015,

UNPLUGGED project aims to investigate how the use of inductive charging of Electric Vehicles (EV) in urban environments improves the convenience and sustainability of car-based mobility. In particular, it will be investigated how smart inductive charging infrastructure can facilitate full EV integration in the urban road systems while improving customer acceptance and perceived practicality. UNPLU ...
Read Project

 17

 FINISHED 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Read Project

 44

 FINISHED 

Electricity Demand and Supply Harmonizing for EVs (e-DASH)

Start date: Sep 1, 2011, End date: Nov 30, 2014,

The sustainable integration of the electric vehicles requires an intelligent charging system for the real-time\nexchange of charge related data between FEVs and the grid in order to allow the management of:\n• high-current fast-charging for large numbers of FEVs in a brand-independent way\n• price-adaptive charging/reverse-charging at optimum price for the customer\n• the real-time grid balancing ...
Read Project

 15

 FINISHED 
"The project aims at developing a unique device for electricity networks: A superconducting fault current limiter (SFCL) based on coated conductor YBCO tape (cc-tape) or 2nd Generation HTS tape. The general trend in Europe to a higher meshing of distribution networks and the rapid growing integration of renewable energy sources leads to an increase of the fault current level by every new installat ...
Read Project

 16

 FINISHED 
EnergyTIC is a demonstration project that will put into practice innovative ICT solutions available in two different countries, France and Spain, with a common goal: providing the end-users with an easy to understand / intuitive solution allowing him to monitor and adapt its energy and water consumptionTechnical solution: Comprehensive convergent ICT solutions will be implemented in 1700 dwellings ...
Read Project

 14

 FINISHED 
This project is aiming at the scaling-up of one of the most promising concepts for CO2 capture from coal power plants: postcombustion carbonate looping systems. This project focuses on the experimental pilot testing and scaling up of the process at scales in the 1 MW range. The 1 Mw carbonate looping pilot will be built in the Hunosa 50 Mwe CFB coal power plant of “La Pereda”, using a side stream ...
Read Project

 8

 FINISHED 
For E.V.s, the development of an interactive electric energy ICT & Service interface between the vehicle and its electricity infrastructure is of utmost importance, next to creating effective business models.The rationale of this project is to contribute significantly to neutralize the driver's "range anxiety" and encourage the customers to embark the fully electric road transport.Therefore the ob ...
Read Project

 12

 FINISHED 
This project combines the CFB’s intrinsic advantages (fuel flexibility and low emissions) with oxygen-firing for carbon capture and storage (CCS). In oxygen-firing systems the fuel is burned in a mixture of pure O2 and recirculated flue gas instead of air. The absence of air nitrogen produces a flue gas stream with a high concentration of CO2, making it much easier to separate the CO2. CFB technol ...
Read Project

 13

 FINISHED 
COMET aims at identifying and assessing the most cost effective CO2 transport and storage infrastructure able to serve the West Mediterranean area, namely Portugal, Spain and Morocco. This is achieved considering the time and spatial aspects of the development of the energy sector and other industrial activities in those countries as well as the location, capacity and availability of potential CO2 ...
Read Project

 18

 FINISHED 

Open Public Extended Network metering (OPEN meter)

Start date: Jan 1, 2009, End date: Jun 30, 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Read Project

 20

 FINISHED 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Read Project

 14