Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The objective of eStorage is to develop cost-effective solutions for the widespread deployment of flexible, reliable, GWh-scale storage across EU, and to enhance grid management systems to allow the integration of large share of renewable.The key issue we plan to address is the need for power regulation during low demand periods, when only inflexible baseload generation and intermittent renewable ...
Read Project

 7

 FINISHED 
"Power system reliability management means to take decisions under increasing uncertainty (for instance, related to renewable generation). It aims to maintain power system performance at a desired level, while minimizing the socio-economic costs of keeping the power system at that performance level. Seven TSOs (Belgium, Bulgaria, Czech Republic, Denmark, France, Iceland, Norway), together with ele ...
Read Project

 20

 FINISHED 

Multi-terminal DC grid for offshore wind (MEDOW)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

A DC grid based on multi-terminal voltage-source converter is a newly emerging technology, which is particularly suitable for the connection of offshore wind farms. Multi-terminal DC grids will be the key technology for the European offshore SuperGrid.In this proposal, DC power flow, DC relaying protection, steady state operation, dynamic stability, fault-ride through capability, and impacts of DC ...
Read Project

 12

 FINISHED 
...V) networks has led to a bidirectional power flow which raises the urgent need for new operational and control strategies in order to maintain the ability of the system to provide the consumers with reliable supply of electricity at an acceptable power quality level.Technically, INCREASE will focus on how to manage renewable energy sources in LV and MV networks, to provide ancillary services (towa ...
Read Project

 15

 FINISHED 
Background As a transmitter of electricity, Elia’s priority is to ensure the security of the electricity network. This sometimes means that forest corridors are created to secure overhead lines. These corridors are currently often “no man’s land”, without any vegetation or wildlife. However, these same corridors could form an important network of ...
Read Project

 4

 FINISHED 
6 Transmission System Operators (Belgium, France, Greece, Norway, Portugal and United Kingdom) and CORESO, a TSO coordination centre, together with 13 RTD performers propose a 4 year R&D project to develop and to validate an open interoperable toolbox which will bring support, by 2015, to future operations of the pan-European electricity transmission network, thus favouring increased coordination/ ...
Read Project

 23

 FINISHED 
Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. F ...
Read Project

 28

 FINISHED 
The key objective of the EcoGrid EU project is to demonstrate efficient operation of a distribution power system with high penetration of many and variable renewable energy resources. The demonstration will take place on the Danish island Bornholm with more than 50 % of electricity consumption from renewable energy production.A real-time market concept will be developed to give small end-users of ...
Read Project

 17

 FINISHED 
"AFTER project addresses the challenges posed by the need for vulnerability evaluation and contin-gency planning of the energy grids and energy plants considering also the relevant ICT systems used in protection and control.Project emphasis is on cascading events that can cause catastrophic outages of the electric power systems.The main addressed problems are related to high impact wide spread mul ...
Read Project

 14

 FINISHED 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Read Project

 29

 FINISHED 
Five Transmission System Operators (Belgium, France, Germany and Spain) together with seven RTD performers propose a 3 year research and demonstration project to compare pros and cons of new market designs aiming at the integration of massive intermittent energy sources dispersed in several regional power markets. Under the technical coordination of RTE, they will implement a novel network/system/ ...
Read Project

 15

 FINISHED 
This action focuses on demonstrating the development of a cost-effective large scale high capacity wind park using new state-of-the-art multi megawatt turbines coupled with innovative technology used to stabilize the grid. A key objective of the ‘7-MW-WEC-by-11’ project is to introduce a new power class of large-scale Wind Energy Converters, the 7MW WEC, onto the market which has the potential to ...
Read Project

 10

 FINISHED 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Start date: Jul 1, 2008, End date: Jun 30, 2012,

"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimi ...
Read Project

 25