Search for European Projects

20 European Projects Found

Searched on 125080 European Projects

 FINISHED 
In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Read Project

 35

 FINISHED 
To meet the high throughput demands envisaged for 5G networks, with increased user densification and bandwidth-hungry applications, while at the same time reducing energy consumption, iCIRRUS proposes an intelligent Cloud-Radio Access Network (C-RAN) that brings together optical fibre technology, low-cost but highly flexible Ethernet networking, wireless resource management for device-to-device (D ...
Read Project

 12

 FINISHED 

IDEA Moves

Start date: Sep 1, 2015, End date: Aug 31, 2017,

In Spain , youth unemployment is a very serious issue . The percentage of the unemployed is one of the highest in Europe . City Council of Alzira wants to complement and enhance the quality of training offered to students through their courses FPE, organizing a mobility project for students in order to facilitate integration in the labour market. The objective of this project is that 6 students w ...
Read Project

 9

 FINISHED 

ALCORCÓN EN EUROPA II

Start date: Sep 1, 2015, End date: Aug 31, 2017,

The towns of Alcorcón, Móstoles and their immediate surroundings recorded a high rate of youth unemployment which, as is the case with the rest of the Spanish state, is the result of the decline in economic activity in recent years. In this context, the local young population presents a number of pressing needs related to lack of experience and job opportunities that justify the existence of the " ...
Read Project

 36

 FINISHED 
The ECO-SEE project aims to develop new eco-materials and components for the purpose of creating both healthier and more energy efficient buildings. We will create and symbiotically use natural eco-materials for healthier indoor environments through hygrothermal (heat and moisture) regulation and the removal airborne contaminants through both chemical capture and photocatalysis. Our objectives inc ...
Read Project

 19

 FINISHED 

FRAY LUIS DE LEÓN II

Start date: Jun 1, 2015, End date: May 31, 2017,

The Consortium promoter of this proposal, coordinated by the Provincial Development Board of the Council of Cuenca, and shaped by 16 VET organisations, both public and private bodies, presents the project “FRAY LUIS DE LEÓN II” thanks to the extensive experience in mobility projects. “FRAY LUIS DE LEÓN II” intends to continue with the training and work activities that have brought many benefits to ...
Read Project

 30

 FINISHED 
"Particulate materials, e.g. pharmaceutical formulations, precious metal, fine chemical, metal & ceramic powders, have been compacted to produce a wide range of particulate products in a number of industrial sectors. The diversity of particulate materials and the complexity of manufacturing processes make it a challenging task in product development and process design for particulate product manuf ...
Read Project

 10

 FINISHED 

ALCORCÓN EN EUROPA

Start date: Oct 1, 2014, End date: Sep 30, 2016,

“ALCORCÓN EN EUROPA” initiative was created to meet the needs of the town of Alcorcón and its nearby areas which record a high unemployment rate. This situation, like in the rest of Spain, is consequence of the economic crisis that we are facing in recent years. Within this framework, the local population suffers increasing needs that are irectly connected with the lack of experience and job op ...
Read Project

 44

 FINISHED 

FRAY LUIS DE LEÓN

Start date: Oct 1, 2014, End date: Sep 30, 2016,

The Consortium promoter of this proposal, coordinated by the Provincial Development Board of the Council of Cuenca, and shaped by 18 VET organisations, both public and private bodies, presents the project “FRAY LUIS DE LEÓN” thanks to the extensive experience in mobility projects. “FRAY LUIS DE LEÓN” intends to continue with the training and work activities that have brought many benefits to the y ...
Read Project

 48

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

GUADALAJARA EN EUROPA+

Start date: Sep 1, 2014, End date: Aug 31, 2016,

The project GUADALAJARA EN EUROPA+, is promoted from the town council of Guadalajara through the Integrated Municipal Centre of the Local Office of Employment and Development (OLED). This centre provides information of a diverse nature with specialities in the sectors with the most demand in the province. Apart from the training which they provide in each speciality, they train the students in sel ...
Read Project

 49

 FINISHED 

XPTO+ eXcellence in Professional Training Opportunities

Start date: Sep 1, 2014, End date: May 31, 2016,

The XPTO + project was promoted by the "Consortium XPTO +", which was coordinated EUROYOUTH and composed by the sending schools: Agrupamento de Escolas de Santo André (AESA), Escola Profissional de Fafe (EP Fafe) and Instituto da Soldadura e Qualidade (ISQ). XPTO + The result of a convergence of ideas and wills between all partners, for, in consortium, send graduates of vocational training of nat ...
Read Project

 45

 FINISHED 

SeVET - Sevilla para la Formación Profesional en Europa

Start date: Dec 31, 2014, End date: Dec 30, 2015,

“SeVET – Seville for the Vocational Training in Europe” was born after a publicity campaign that ONECO aimed at Intermediate Vocational Training Schools in the Province of Seville, to let them know the advantages of Mobility Programmes for learners, KA102. Due to the interest shown by several Educational Centers, a Consortium was formed, in which ONECO was the applying entity, and the Schools wer ...
Read Project

 46

 FINISHED 

CUENCA PLUS

Start date: Dec 1, 2014, End date: Nov 30, 2015,

The town council of Cuenca introduced the CUENCA PLUS project, which aimed to provide the people of Cuenca with the necessary impetus to give strength to and develop the economic fabric and business competitiveness of the region, through quality training amongst the young people of the city which made possible their future entry into the workforce. The city of Cuenca is one of the major historical ...
Read Project

 22

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 
The SYNFLOW vision is the paradigm shift from batch-wise large volume processes in pharmaceuticals, fine chemicals and intermediates production comprising many separate unit operations towards highly integrated but yet flexible catalytic continuous flow processing. For this purpose, SYNFLOW develops a unique integrative approach combining molecular understanding of synthesis and catalysis with eng ...
Read Project

 23

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 

European Value Chains for CO2 (ECCO)

Start date: Sep 1, 2008, End date: Nov 30, 2011,

The main objective of ECCO is to facilitate robust strategic decision making regarding early and future implementation of CO2 value chains for Europe in the face of uncertainty. The project will provide recommendations enabling cost-effective use of the CO2 being produced from zero-emission power plants and other industries in Europe by exploring the assets and challenges of CO2 for enhanced hydr ...
Read Project

 20

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22