Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The wind turbine industry is one of the fastest growing markets. Current turbines are huge with turbine rotor diameters of over 100m becoming standard. EU energy policy calls for 20% of the EU's 3040Th/y electricity demand to come from renewable sources by 2020, which constitutes a market of some 140€ billion and wind energy is the clear front runner.Presently in situ blade inspection is carried o ...
Read Project

 9

 FINISHED 
Diffusion bonding offers a number of advantages to a wide range of industry sectors and applications, particularly where there is a need to join dissimilar materials. The main advantage of diffusion bonding is that, unlike welding, it is not a 'fusion' process – it is a solid state process and the parent materials to be joined do not need to be melted. This makes diffusion bonding an ideal solutio ...
Read Project

 6

 FINISHED 
The installation of sprinklers can result in substantial reductions in insurance premiums and so insurance companies are becoming increasingly interested in their proper installation and function. For example, the British Automatic Fire Sprinkler Association has abundant evidence about the effectiveness of their members’ technology in reducing loss of life and property in office, residential, reta ...
Read Project

 10

 FINISHED 
Creep is the time-dependent, thermally assisted deformation of a component operating under stress. Metal pressure components such as boiler tubing, headers, and steam piping in fossil-fired power plants operate at thermal conditions (above ~1,000ºF [538ºC]) conducive to causing creep damage over the operating life of the component.To ensure safe and reliable operation of such components in service ...
Read Project

 7

 FINISHED 

High Power Transmission Line Cable Inspection (CHAPLIN)

Start date: Dec 1, 2012, End date: Nov 30, 2014,

There are many thousands of miles of high power line transmission cables dispersed around Europe. Some are installed in remote areas where it’s difficult to serve. Furthermore, line cables operate in severe conditions. The cables are subject to many environmental and operation factors such as moisture, voltage stress, omitting jacking and structural imperfections.These factors are the main reasons ...
Read Project

 7

 FINISHED 
Gearless generators are of increasing interest and turbine system manufacturers are looking into gearless energy systems projecting onto 2015. Gear operates on mechanical engagement and friction which implies loss of energy and mechanical damage on parts in long term. Gearless generators, on the other hand, are possible by employing magnets, for which powder metallurgy (PM) and most notably powder ...
Read Project

 7

 FINISHED 
"WINTUR Demonstration Project will demonstrate the structural health monitoring (SHM) system that was developed successfully in the WinTur R4S project, in order to show that such a system is viable for blade monitoring and can help the wind sector to achieve the kind of energy delivery to business and communities that is desired by reducing operational and maintenance costs. This will be achieved ...
Read Project

 10

 FINISHED 

Implant Direct

Start date: Sep 1, 2012, End date: Aug 31, 2014,

ImplantDirect will create a cost-effective, faster manufacturing route for orthopaedic, maxillofacial or trauma implants, tailored to the individual needs of patients. The overall project aims are to improve the quality of the implants, reduce the recovery time, improve the quality of life for the patients and reduce the healthcare costs. This will be achieved by allowing surgeons to personalise ...
Read Project

 9

 FINISHED 
"The wind turbine industry is the fastest growing market area for the use of composite materials. Current state-of-the-art turbines are increasing in size, providing multi-megawatt power output. To generate such power turbine rotorblade diameters exceeding 100m along with nacelle heights of 120m are becoming standard. As turbines grow and their deployment becomes more widespread and remote, it is ...
Read Project

 9

 FINISHED 
Wireless sensor networks have been identified as a research priority by the European Technology Platform on Smart Systems Integration (EPoSS). Recognising this, the SME's in this Project are seeking EC funding to develop a prototype wide-area wireless sensor network with autonomous nodes containing non-destructive (NDT) sensors, for structural health monitoring (SHM) of large structures, specifica ...
Read Project

 9

 FINISHED 
"Laser Powder Deposition is a recently developed technology for manufacture of small intricate metal parts such as thoseused in aerospace and automobile engines. This technology has significant potential advantages over conventionalcasting methods in that small parts with internal features can be built, enabling special processes and light structures to beconstructed.The powder deposition process ...
Read Project

 8

 FINISHED 

Whole Life Rail Axle Assessment and Improvement (Wolaxim)

Start date: Nov 1, 2010, End date: Dec 31, 2012,

Axles for railway trains are carefully engineered and high value items that are designed to last 20 years or more. There is however a current trend for axles to be withdrawn from service before this because of corrosion on the surface long before their design lives. The decision to withdraw from service is taken without the full knowledge of the way in which the failure will result from corrosion, ...
Read Project

 9

 FINISHED 
IMPALA will develop flexible and efficient Rapid Manufacturing processes of custom parts or small batches. SME end users will be at the forefront of this project, helping them increase their annual turnover by 20-50%, by producing a diversified range of high value components. Currently, manufacturing custom products such as artificial teeth can take several days or weeks and is very expensive. Thi ...
Read Project

 16