Search for European Projects

32 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The success of the European vision of a low carbon electricity grid that minimises greenhouse gas emissions; and enhances security, quality and reliability of supply depends on how smart infrastructures, combining energy and telecom, are developed and implemented for the wider integration of security-aware distributed energy resources into the increasingly decentralised grid. MAS2TERING, a 3-year ...
Read Project

 9

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Inter System Interoperability for Tetra-TetraPol Networks (ISITEP)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

A European network where forces share communications, processes and a legal framework would greatly enforce response to disaster recovery and security against crime. Until now, uncertainty on costs, timescale and functionalities has slowed down integration of national Public Protection & Disaster Relief (PPDR) networks. The lack of interoperable communication systems has impeded the cooperation of ...
Read Project

 19

 FINISHED 

Managing Impacts of Deep-seA reSource exploitation (MIDAS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

The MIDAS project addresses fundamental environmental issues relating to the exploitation of deep-sea mineral and energy resources; specifically polymetallic sulphides, manganese nodules, cobalt-rich ferromanganese crusts, methane hydrates and the potential mining of rare earth elements. These new industries will have significant impacts on deep-sea ecosystems, in some cases extending over hundre ...
Read Project

 34

 FINISHED 
The overall aim of the TERASEL project is the development, the industrial implementation and the application in a wide range of domains of large area, cost-effective, randomly shaped electronics and sensor circuit technologies. More specifically the TERASEL objectives are the following :• To develop a basic technology platform for rigid large-area randomly shaped electronic circuits. Key common fe ...
Read Project

 16

 FINISHED 
Virtual prototyping (VP) is a key technology for environmental friendly and cost effective design in the aircraft industry. However, the underlying analysis and simulation tools (for loads, stresses, emissions, noise), are currently applied with a unique set of input data and model variables, although realistic operating conditions are a superposition of numerous uncertainties under which the indu ...
Read Project

 22

 FINISHED 

Cities demonstrating cybernetic mobility (CITYMOBIL2)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

European cities face four main mobility problems: congestion, land use , safety and environment. One of the main causes of such problems is the car-ownership rate. The centres of large cities address this issue combining efficient mass transits with car restriction policies but peripheral areas and smaller cities remain dominated by private cars.CityMobil has demonstrated how automating road vehi ...
Read Project

 49

 FINISHED 
"The aim of TINN2 is to evaluate azithromycin, included in the EMEA priority list of the therapeutic areas that need specific drug evaluation in preterm and term neonates. Azithromycin is a macrolid antibiotic with anti-inflammatory properties active against Ureaplasma. It might be effective in reducing the severity of bronhopulmonary disease in which Ureaplasma infection and inflammation play a r ...
Read Project

 17

 FINISHED 
"ADAPTAWHEAT will show how flowering time variation can be exploited for the genetic improvement of the European wheat crop to optimise adaptation and performance in the light of predicted climate change. It will test current hypotheses that postulate specific changes in ear emergence and the timing and duration of developmental phases, which are thought of as components of ear emergence, will i ...
Read Project

 21

 FINISHED 

VARiability In safety critical Embedded Systems (VARIES)

Start date: May 1, 2012, End date: Apr 30, 2015,

"In order to succeed or even to survive, manufacturers and system integrators must be able to deliver new products with speed, diversity, high quality, and at an acceptable cost.Embedded Systems (ES) are rarely entirely conceived from scratch. Companies developing ES constantly face decisions about using and adapting existing products or product assets versus new developments. Determining the long ...
Read Project

 29

 FINISHED 
"To meet both the worldwide demand for food security and new environmental needs, agriculture must increase food production and quality while decreasing its ecological footprint. Ensuring sustainability and competitiveness with reduced pesticide inputs is a major challenge.PURE will provide integrated pest management (IPM) solutions and a practical toolbox for their implementation in key European ...
Read Project

 26

 FINISHED 
Description SPADnet aims to develop a new generation of smart, CMOS-based large area networked image sensors for photon-starved biomedical applications, build ring-assembly modules for Positron Emission Tomography (PET) imaging, and carry out performance tests in a PET system evaluation testbed.While suited to applications offering repetitiv ...
Read Project

 9

 FINISHED 
Hepatitis C virus (HCV) infection is a leading cause of chronic liver disease world-wide. HCV-induced end-stage liver disease such as liver cirrhosis and hepatocellular carcinoma represent a major concern in global health. Treatment options for chronic hepatitis C are limited and no vaccine against HCV infection is available. Vaccine development is hampered by several obstacles. High viral variabi ...
Read Project

 2

 FINISHED 
MACC II (Monitoring Atmospheric Composition and Climate – Interim Implementation) is designed to meet the requirements that have been expressed for prototype operational GMES services for the atmospheric domain. From late-2011 MACC II will continue the operation and development of the GMES service lines established by the MACC project and prepare for its transition in 2014 to become the atmospheri ...
Read Project

 39

 FINISHED 

Massive Digital sequencing by binary DNA (Digital Sequencing)

Start date: Dec 1, 2009, End date: May 31, 2014,

DNA sequencing costs have fallen more than 50-fold over the past decade, driven part by tools, technology and process improvements made during the Human Genome Project. However, it still costs around $10 million to sequence 3 billion base pairs - the amount of DNA found in the genomes of humans and other mammals. 1st generation sequencing platforms, which are based upon capillary electrophoresis ...
Read Project

 5

 FINISHED 
Manufacturing is the driving force of Europe's economy, providing over €6,553 billion in GDP. However against a background of climate change legislation, volatile energy prices and increased environmental awareness, modern manufacturing must encompass a focus on eco-efficiency. Given the current economic situation, this must be achieved without the need for large capital expenditure. Adding inform ...
Read Project

 15

 FINISHED 

Research into Impacts and Safety in CO2 Storage (RISCS) (RISCS)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"Although significant leakage from CO2 storage sites is not expected, if it did occur there could be adverse environmental consequences, which are not well constrained. The objective of RISCS is to provide fundamental research on environmental impacts, necessary to underpin frameworks for the safe management of CO2 storage sites. To achieve this, RISCS will quantitatively assess environmental impa ...
Read Project

 23

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 

Virtual Physiological Human Network of Excellence (VPH NoE)

Start date: Jun 1, 2008, End date: May 31, 2013,

Description The Virtual Physiological Human Network of Excellence (VPH NoE), 2008-2013, served as a rallying point and source of best-practice information for the VPH community.  This role has now has been passed to the VPH Institute (http://www.vph-institute.org/).  The tools and educational/outreach materials developed by the VPH NoE – and ...
Read Project

 23

 FINISHED 

Instant Mobility for Passengers and Goods (Instant Mobility)

Start date: Apr 1, 2011, End date: Mar 31, 2013,

The Instant Mobility project has created a concept for a virtual "Transport and Mobility Internet", a platform for information and services able to support radically new types of connected applications for scenarios centred on the stakeholder groups:•\tmultimodal travellers•\tdrivers & passengers•\tpassenger transport operators•\tgoods vehicle operators•\troad operators & traffic managers.The proj ...
Read Project

 24

 FINISHED 
PEOPLE aims at speeding up the uptake of smart cities through the rapid implementation, deployment and uptake of innovative internet-based services in order to allow facing the main challenges of developed cities at present and towards their future quality of life. This will be enabled by designing and implementing citizen-driven open innovation methodologies and processes.For these purposes, duri ...
Read Project

 9

 FINISHED 
The coordination project EuroVisionNet aims to link the research activities and policies of the European vision research community and to overcome the national fragmentation, therewith intends to become an essential “instrument” for vision research in the 21st century. To reach this goal the following 4 objectives will be addressed: (1) scientific integration of European vision research; (2) colla ...
Read Project

 10

 FINISHED 

Organic LED Lighting in European Dimensions (OLED100.eu)

Start date: Sep 1, 2008, End date: Aug 31, 2011,

The overall goal of OLED100.eu is to develop all the necessary technologies forming the basis for efficient OLED applications for the general lighting industry in Europe. The European Council has agreed to cut at least 20% in CO2 emission by 2020. Recent studies conducted by the JRC of the EC show a huge potential for saving energy by better energy efficiency. Still, some citizens are not aware t ...
Read Project

 15

 FINISHED 
DOTFIVE is a three-year IP proposal for a very ambitious project focused on advanced RTD activities necessary to move the Silicon/germanium heterojunction bipolar transistor (HBT) into the operating frequency range of 0.5 terahertz (THz) (500 gigahertz GHz) enabling the future development of communication, imaging or radar Integrated Circuits (IC) working at frequencies up to 160 GHz . For a giv ...
Read Project

 20

 FINISHED 

Dual-channel CMOS for (sub)-22 nm high performance logic (DUALLOGIC)

Start date: Dec 1, 2007, End date: May 31, 2011,

We propose to develop for the first time a dual-channel CMOS technology comprising high channel mobility (high-µ) Ge pMOS and III-V compound semiconductor nMOS transistors co-integrated on the same complex engineered substrate on Si. This offers a high performance booster as an option for the 22 nm technology creating competitive advantage for the European nanoelectronics industry. In addition, hi ...
Read Project

 9

 FINISHED 
NANOSIL Network of Excellence aims to integrate at the European level the excellent European research laboratories and capabilities in order to strengthen scientific and technological excellence in the field of nanoelectronic materials and devices for terascale integrated circuits (ICs) and disseminate the results in a wide scientific and industrial community.NANOSIL will explore and assess the sc ...
Read Project

 38

 FINISHED 
The SOCRATES project investigates the application of self-organisation methods, which includes mechanisms for self-optimisation, self-configuration and self-healing, as a promising opportunity to automate wireless access network planning and optimisation, thus reducing substantially the Operational Expenditure (OPEX) and improving network coverage, resource utilisation and service quality. Fundame ...
Read Project

 8

 FINISHED 
The DaVinci project aims at developing new technologies targeting future B3G or 4G wireless broadband transmission systems such as IEEE 802.16e/m, or 3GPP-LTE. It is well known that the increase in data rate and heterogeneous transport in wireless networks demands very efficient coding schemes, coupled with adaptive resource allocation strategies. Beside the recent progress made these last 15 year ...
Read Project

 8

 FINISHED 

Pan-European Reseach Infrastructure for Nano-Structures (PRINS)

Start date: Apr 1, 2008, End date: Mar 31, 2010,

The project focuses on all needed preparatory actions to enable in the following phase the construction of a Research Infrastructure (RI) called Pan-European Research Infrastructure for Nano-Structures (PRINS), with the aim of enabling European innovative research for the ultimate scaling of electronics component and circuits. The platform will be truly interdisciplinary by allowing the convergenc ...
Read Project

 10

 FINISHED 
GEYSERS vision is to qualify optical infrastructure providers and network operators with a new architecture, to enhance their traditional business operations. Optical network infrastructure providers will compose logical infrastructures and rent them out to network operators; network operators will run cost-efficient, dynamic and mission-specific networks by means of integrated control and managem ...
Read Project

 20

 FINISHED 

Material Development for Double exposure and Double patterning (MD3)

Start date: Dec 1, 2007, End date: Nov 30, 2009,

Double patterning lithography has been identified as one of the most promising solutions for the 32nm node patterning. This technique refers to a two step process where a first pattern is exposed, developed and sometimes etched and a second pattern is also exposed, developed and transferred on the top of the first one. For the moment, several issues still need to be addressed for enabling the Doub ...
Read Project

 7

 FINISHED 

i-Travel - Service Platform for the Connected Traveller (iTravel)

Start date: Jan 1, 2008, End date: Sep 30, 2009,

“i-Travel” is an original concept that combines three key innovations. The goal of the overall i-Travel IP is to develop, validate and demonstrate an innovative solution for:- (1) a personalised, context-aware online “virtual travel assistant” service for travellers, both before and throughout their journey, based on (2) the integration of e-commerce and internet technologies to create the firs ...
Read Project

 20