Search for European Projects

15 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Excellence in SImulation of Weather and Climate in Europe (ESiWACE)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

ESiWACE will substantially improve efficiency and productivity of numerical weather and climate simulation on high-performance computing platforms by supporting the end-to-end workflow of global Earth system modelling in HPC environment. This will be obtained by improving and supporting (1) scalability of models, tools and data management on state-of-the-art supercomputer systems (2) Usability of ...
Read Project

 16

 FINISHED 

Aerosols, Clouds, and Trace gases Research InfraStructure (ACTRIS-2)

Start date: May 1, 2015, End date: Apr 30, 2019,

ACTRIS-2 addresses the scope of integrating state-of-the-art European ground-based stations for long term observations of aerosols, clouds and short lived gases capitalizing work of FP7-ACTRIS. ACTRIS-2 aims to achieve the construction of a user-oriented RI, unique in the EU-RI landscape. ACTRIS-2 provides 4-D integrated high-quality data from near-surface to high altitude (vertical profiles and t ...
Read Project

 32

 FINISHED 
"ESCAPE will develop world-class, extreme-scale computing capabilities for European operational numerical weather prediction (NWP) and future climate models. The biggest challenge for state-of-the-art NWP arises from the need to simulate complex physical phenomena within tight production schedules. Existing extreme-scale application software of weather and climate services is ill-equipped to adapt ...
Read Project

 12

 FINISHED 

European Reanalysis of the Global Climate System (ERA-CLIM2)

Start date: Nov 11, 2013, End date: Jan 1, 2018,

Production of an extended climate reanalysis of the 20th century, with consistent descriptions of the global atmosphere, ocean, land-surface, cryosphere, and the carbon cycle. Production of a new reanalysis of the satellite era with near-real time data updates for climate monitoring. Research and development in various aspects of coupled data assimilation to improve the use of observations in futu ...
Read Project

 16

 FINISHED 

Uncertainties in Ensembles of Regional Reanalyses (UERRA)

Start date: Nov 11, 2013, End date: Jan 1, 2018,

An ensemble system of regional reanalyses will be developed and run for the climatological time scale. Theinformation content of the datasets and their uncertainties will be assessed in several ways and statisticsanalysed.The project will provide long-term datasets of Essential Climate Variables (ECVs) on the European regionalscale in order to support adaptation action and policy development. The ...
Read Project

 12

 FINISHED 
Recent advances in our understanding and forecasting of climate and climate change have brought us to the point where skilful and useful predictions are being made. These forecasts hold the potential for being of great value for a wide range of decision-makers who are affected by the vagaries of the climate and who would benefit from understanding and better managing climate-related risks. Howeve ...
Read Project

 26

 FINISHED 

UltraFast wind sensOrs for wake-vortex hazards mitigation (UFO)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The UFO project aims at ensuring aviation safety at current high standards or even better, regardless of air transport growth, through Wake-Vortex Advisory Systems improvement, in connection with SESAR P12.2.2 project. UFO research works will address a wide range of innovative technologies through studies of new Ultra Fast Lidar/Radar Wind & EDR (Eddy Dissipation Rate for turbulence) monitoring se ...
Read Project

 12

 FINISHED 

Monitoring Atmospheric Composition and Climate -III (MACC-III)

Start date: Aug 1, 2014, End date: Aug 31, 2015,

MACC-III is the last of the pre-operational stages in the development of the Copernicus Atmosphere Service. Its overall institutional objective is to function as the bridge between the developmental precursor projects - GEMS, PROMOTE, MACC and MACC-II- and the Atmosphere Service envisaged to form part of Copernicus Operations.MACC-III will provide continuity of the atmospheric services provided by ...
Read Project

 39

 FINISHED 
CORE-CLIMAX will coordinate the identification of available physical measurements, which can be reconciled with previously existing data records, to form long time series. It will help to substantiate how GMES observations and products can contribute to climate change analyses, by establishing the extent to which GMES observations complement existing Climate Data Records (CDR).With GCOS, GMES and ...
Read Project

 9

 FINISHED 
Climate change is for a large part governed by atmospheric processes, in particular the interaction between radiation and atmospheric components (e.g. aerosols, clouds, greenhouse and trace gases). Some of these components are also those with adverse health effects influencing air quality. Strengthening the ground-based component of the Earth Observing System for these key atmospheric variables ha ...
Read Project

 29

 FINISHED 
A major difficulty faced by users of climate data is how to judge whether the data are fit for purpose. This is a serious barrier to widening the use of climate data by non-expert users. Different users require different information, such as reports on validation campaigns, the robustness of the algorithms used, and the data policy. We term this information 'Commentary' metadata. Much work has bee ...
Read Project

 9

 FINISHED 
MACC II (Monitoring Atmospheric Composition and Climate – Interim Implementation) is designed to meet the requirements that have been expressed for prototype operational GMES services for the atmospheric domain. From late-2011 MACC II will continue the operation and development of the GMES service lines established by the MACC project and prepare for its transition in 2014 to become the atmospheri ...
Read Project

 39

 FINISHED 

EUropean Reanalysis and Observations for Monitoring (EURO4M)

Start date: Apr 1, 2010, End date: Mar 31, 2014,

"EURO4M will develop the capacity for, and deliver the best possible and most complete (gridded) climate change time series and monitoring services covering all of Europe. These will describe the evolution of the Earth system components by seamlessly combining two different but complementary approaches: regional observation datasets of Essential Climate Variables (ECVs) on the one hand and model b ...
Read Project

 9

 FINISHED 

Monitoring Atmospheric Composition and Climate (MACC)

Start date: Jun 1, 2009, End date: Dec 31, 2011,

"MACC (Monitoring Atmospheric Composition and Climate) is designed to meet the requirements that have been expressed for the pilot Core GMES Atmospheric Service. The project has been prepared by the consortia of the FP6 project GEMS and the GSE project PROMOTE, whose core service lines will provide the starting point for MACC. From mid-2009 MACC will continue, improve, extend, integrate and valida ...
Read Project

 45

 FINISHED 
Extreme meteorological events originate in one part of the Alps and proceed over or along the alpine crest. The effects of these events are inundations, landslides, avalanches, Föhn storms etc., which do not occur outside of the Alps in this form. The forecasting of these events is limited by the lack of structured communication between the weather services in these areas and the lack of online av ...
Read Project

 14