Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
In aircraft, one of the primary sources of vibration is the power plant. Engine vibration could lead to unnecessary expenses for replacing damaged components, cabin noise, crew and passenger discomfort, and structural fatigue. Hutchinson is the major supplier of aircraft main Power plant and APU Vibration Isolation Systems.The “Engine Vibration Isolation Systems – EVIS” project main objective is t ...
Read Project

 1

 FINISHED 
Within the project a new highly efficient biomass CHP technology consisting of a fuel-flexible fixed-bed updraft gasifier, a novel compact gas cleaning system and a solid oxide fuel cell (SOFC) shall be developed for a capacity range of 1to 10 MW (total energy output). The technology shall distinguish itself by a wide fuel spectrum applicable (wood pellets, wood chips, SRC, selected agricultural f ...
Read Project

 9

 FINISHED 
The cities of Madrid, Stockholm, Munich, Turku and Ruse have formed the CIVITAS ECCENTRIC consortium to tackle the challenges of mobility in suburban districts and clean, silent and CO2 free city logistics. In many cities, these two important areas have received less attention in urban mobility policies.Though European cities have made significant steps forward in making city centres attractive an ...
Read Project

 30

 FINISHED 

Coordinating Optimisation of Complex Industrial Processes. (COCOP)

Start date: Oct 1, 2016, End date: Mar 31, 2020,

...0 per cent of the European manufacturing base with around 450,000 companies generating €1.6 billion in turnover and 6.8 million jobs.The project’s objective is to enable plant-wide monitoring and control by using the model-based, predictive, coordinating optimisation concept in integration with plant’s automation systems. This ambitious approach will be developed and verified in co-operation of Eu ...
Read Project

 12

 FINISHED 
PROTEIN2FOOD’s aim is to develop innovative, cost-effective and resource-efficient plant proteins –rich food sources with positive impact on human health, the environment and biodiversity. The quality and quantity of protein from selected highly nutritious seed crops (quinoa, amaranth and buckwheat), and legumes with high protein quantity (lupin, faba beans, pea, chickpea, lentil) will be signific ...
Read Project

 19

 FINISHED 

Laser and Ultrasound Co-Analyzer for thyroid nodules (LUCA)

Start date: Feb 1, 2016, End date: Jan 31, 2020,

This is a trans-disciplinary project that joins endocrinologists (“end-users”), radiologists (“end-users”), physicists who are experts in medical photonics, engineers who are experts in photonics and ultrasonics and the industry to work towards a concentrated goal - to produce a novel, point-of-care, low-cost, screening device that combines two photonics systems (near-infrared diffuse correlation ...
Read Project

 8

 FINISHED 
Smart grid represents a significant new technology of improving the efficiency, reliability, and economics of the production, transmission, and distribution of electricity. It is crucial to exchange and use information for performing smart grid applications. However, in reality the exchange of information over multiple networks is unreliable, leading to unpredictable network Quality-of-Service and ...
Read Project

 5

 FINISHED 

Increased Runway and Airport Throughput (PJ02 EARTH)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Read Project

 35

 FINISHED 

Integrated Surface Management (PJ03a SUMO)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

...vigation information through the use of GNSS (augmented) systems, an automated switching of taxiway lights and (virtual) stop bars according to the AGL service, data link information exchange between controllers and pilots/vehicle and the on-board availability of advanced vision systems will result in an increased situational awareness with an impact on safety. PJ.03a will also focus on the integr ...
Read Project

 37

 FINISHED 

Total Airport Management (PJ04 TAM)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Read Project

 30

 FINISHED 
...irborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft operator’s fuel costs. Greater congestion increases the air traffic control workload and can result in less efficient aircraft profiles.To reduce airborne delays near the destination airport and the associated negative effects, two concepts can be used. One is to adjust ...
Read Project

 21

 FINISHED 
Background In a world with increasing demand for food and energy, effective and long-lasting animal control is crucial. Animals are drawn to agricultural areas for food, but this leads to consequences for both animals and farmers. Chemical poisons are often used to control rodent populations in areas where they destroy crops, eat livestock feed and can tr ...
Read Project

 8

 FINISHED 

Flight Object Interoperability VLD Demonstration (PJ27 IOPVLD)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

... RBT for Air Navigation Service Providers. The main objective of PJ27 is the demonstration that Flight Object Interoperability works in a real world upper En-route airspace environment of Air Traffic Control Centers (ACCs) from DFS, DSNA, ENAV and EUROCONTROL over spanning a large area of European core airspace. The demonstration will be executed as a set of Shadow Mode trials during which Air Tra ...
Read Project

 14

 FINISHED 

Enhanced Arrivals and Departures (PJ01 EAD)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...nds, investigations will assess the use of tools that display traffic information in the cockpit. This will help manage airborne spacing, sequencing and merging with other aircraft, under the overall control of Air Traffic Control in systemised airspace. To ensure that the full benefits are achieved and that the expected performance improvements are realised in the context of the overall ATM netwo ...
Read Project

 25

 FINISHED 

Master Plan Maintenance (PJ20 AMPLE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...or Europe) is to ensure the maintenance, update and alignment of the ATM MP three Levels and its associated Portal as a Common Support Activity of the SESAR 2020 Programme.Under the leadership of EUROCONTROL through facilitated access to information rich performance based civil-military ATM data, PJ20 will bring together contributions of 15 (of 19) SESAR2020 members, ensuring the broad ATM represe ...
Read Project

 29

 FINISHED 

Trajectory based Free Routing (PJ06 ToBeFREE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...idence that FRA can be implemented, cost effectively, in all the SES airspace.The PJ06 Consortium involves key stakeholders of ground industry, Air Navigation Services Providers, universities and EUROCONTROL and includes a wide range of expertise and competence, all committed to delivering high-quality results.
Read Project

 18

 FINISHED 

PJ24 VLD Network Collaborative Management (PJ24 NCM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performance targets and expectations at the network and local level could to be better achieved only through a c ...
Read Project

 20

 FINISHED 

Common Services (PJ15 COSER)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The legacy of Air Traffic Management (ATM) evolution in Europe has resulted in today’s highly fragmented, country-based, services. A consequence of this fragmentation, there is a negative impact on the cost in the provision of ATM service in Europe. A fundamental goal of the Single European Sky initiative is to “provide ATM services to airspace users at a cost of at least 50 % less”. The notion ...
Read Project

 19

 FINISHED 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Read Project

 30

 FINISHED 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Start date: Sep 1, 2016, End date: Dec 31, 2019,

... up pre-operational system platforms capable of receiving and processing ADS-C data including the Extended Projected Profile (EPP). These platforms will e.g. display the shared trajectory data to controllers on their working positions and integrate it in the Flight data Processing systems for the enhancement of the ground Trajectory Prediction.DIGITS plans to have revenue flights becoming availabl ...
Read Project

 18

 FINISHED 

Content Integration (PJ19 CI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Read Project

 28

 FINISHED 

4D Trajectory Management (PJ18 4DTM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

One of the main obstacles of reaching Single European Sky’s objectives is management of flight trajectories. Inaccuracies are difficult to spot and information given to stakeholders about the trajectory is limited, arriving late, and full of inconsistencies and wrong assumptions. Military Flights are currently not integrated in the ATM-system, so demanding special treatment.Additionally, there is ...
Read Project

 29

 FINISHED 
...use of standardised and interoperable systems whilst increasing the safety level. Within the PJ16 proposal, there are two innovative solutions:The first solution develops a concept for separating the Controller Working Position (CWP) from the datacentre where the data is produced. This lean and efficient use of ANSP infrastructure tackles the issues presented by fragmented European ATM systems and ...
Read Project

 28

 FINISHED 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Read Project

 29

 FINISHED 
...pean Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situations where ...
Read Project

 30

 FINISHED 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Start date: Nov 1, 2016, End date: Nov 30, 2019,

... the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control room independent on airport location in order to make use of the valuable resource ATS provider more efficiently. “Single” remote tower settings have already been deployed in former project, but ...
Read Project

 31

 FINISHED 

Privacy and Usabiliy (Privacy.Us)

Start date: Dec 1, 2015, End date: Nov 30, 2019,

With the rapid accumulation and processing of personal data by numerous organizations, it is of paramount importance to protect people from adverse uses of their data, while allowing them to enjoy the benefits the use of these data can possibly provide. This is the question of protecting citizens’ privacy, while enabling them to make informed decisions regarding their actions with privacy implicat ...
Read Project

 10

 FINISHED 
The Vision of HypoSens is to develop a widely accepted,non-invasive and crucial prognostic tool for breast cancer progression in early stages to help clinicians and specially oncologists to decide about prompt therapy approaches to patients and improve quality of life and expectancy. Our breakthrough research will focus on the development, pre-clinical and clinical validation, and industrial demon ...
Read Project

 9

 FINISHED 

Advanced DCB (PJ09 DCB)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Read Project

 30

 FINISHED 

Decentralised Agile Coordination Across Supply Chains (DIGICOR)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

...rnance rules and procedures for collaboration, knowledge protection, and security. The open platform will provide services creating a marketplace for the collaboration partners, for planning and control of the collaborative production and the logistics and risk management. It will be open to third parties to add services for advanced analytics, simulation, or optimization etc. The platform will ...
Read Project

 11

 FINISHED 
Aviation is one of the most critical infrastructures of the 21st century. Even comparably short interruptions can cause economic damage summing up to the Billion-Euro range. As evident from the past, aviation shows certain vulnerability with regard to natural hazards. The proposal EUNADICS-AV addresses airborne hazards (environmental emergency scenarios), including volcano eruptions, nuclear accid ...
Read Project

 21

 FINISHED 
...eavily polluted first flush runoff stream generated within 30 minutes of a rain event. This often causes flooding during heavy rains, as a result of inadequate or failing urban drainage systems. Uncontrolled discharge of runoff and stormwater in urban watersheds lowers the quality of receiving waters, making it difficult to keep concentrations of priority pollutants (such as heavy metals and pesti ...
Read Project

 5

 FINISHED 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Read Project

 22

 FINISHED 

MYRRHA Research and Transmutation Endeavour (MYRTE)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MYRTE is to perform the necessary research in order to demonstrate the feasibility of trans ...
Read Project

 28

 FINISHED 
List_MAPS is a network dedicated to the training of innovative young researchers in the field of Microbiology and Systems Biology. It focuses on Listeria monocytogenes, an ubiquitous pathogen that is in the EU the leading cause of mortality and food recalls due to foodborne pathogens, costing the EU millions of euro per annum in medical care and associated costs in the food sector. ESRs will devel ...
Read Project

 9

 FINISHED 

Research into enhanced tracks, switches and structures (IN2TRACK)

Start date: Sep 1, 2016, End date: Feb 28, 2019,

Research into Enhanced Track, Switches and StructureThe railway of the future needs to meet the predicted growth in societal demand in terms of capacity and service, address the environmental challenges of the 21st century, and enable the political objectives of the European Union. IN2TRACK is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by del ...
Read Project

 26

 FINISHED 

Symbiosis of smart objects across IoT environments (symbIoTe)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

... monitoring. IoT is evolving around a plethora of vertically isolated platforms, each specifically suited to given scenarios and often adopting non-standard, sometimes fully proprietary, protocols to control the variety of sensors, actuators and communication elements. symbIoTe comes to evolve this fragmented environment and provides an abstraction layer for a unified control view on various IoT p ...
Read Project

 14

 FINISHED 
...SYMPLEXITY Objectives areSO 1 – Accurate and cognitive industrial robot systems enabling safe human-robot collaboration for surface finishing operationsSO 2 – Easy to use interfaces for planning, control and re-planning of shared finishing tasksSO 3 – Collaboration oriented process technology for abrasive finishing, laser and fluid jet polishingSO 4 – Integrated and autonomous sensing system for o ...
Read Project

 15

 FINISHED 
Background In order to mitigate against the negative impacts of climate change, the European Commission adopted a Green Paper (COM(2006) 105 final) establishing a European Strategy for Sustainable, Competitive and Secure Energy. Additionally, Directive 2009/28/CE (Renewables Directive) established that 20% of energy consumption in the European Union must ...
Read Project

 6

 FINISHED 
Aim: The ADVANCE vision is focused on Timely and Best Evidence on Vaccine Effects. Our mission is to establish a best practice framework to rapidly provide robust data on vaccine benefits and risks to support accelerated decision-making.Approach: To achieve this vision through a public-private partnership, ADVANCE partners 1. establish common grounds and rules for collaboration between public and ...
Read Project

 30