Search for European Projects

25 European Projects Found

Searched on 125080 European Projects

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
Most coal-fired utility boilers are fired with pulverised coal and the use of this technology for power generation far outweighs that of alternatives. The consortium have identified key issues that need to be addressed to pave the way for full-scale deployment of oxy-coal firing. As most previous work has been undertaken at pilot-scale so that, in addition to medium scale demonstration activities, ...
Read Project

 13

 FINISHED 

Security and Safety Modelling (SESAMO)

Start date: May 1, 2012, End date: Jun 30, 2015,

"The SESAMO project addresses the root causes of problems arising with convergence of safety and security in embedded systems at architectural level, where subtle and poorly understood interactions between functional safety and security mechanisms impede system definition, development, certification, and accreditation procedures and standards. Intense market innovation is being held back by this r ...
Read Project

 21

 FINISHED 
The exponential growth in the number of cores requires radically new software development technologies. Many expect 100,000-core platforms to become commonplace, and the best predictions are that core failures on such an architecture will be common, perhaps one an hour. Hence we require programming models that are not only highly scalable but also reliable. The project aim is to scale the radic ...
Read Project

 8

 FINISHED 
In view of the increasing age of the European NPPs and envisaged life time extensions up to an EOL of 80 years, there is a need for an improved understanding and prediction of RPV irradiation embrittlement effects connected with long term operation (LTO). Effects caused by high neutron fluences such as the possible formation of Late Blooming Phases and as yet unknown defects must be considered ade ...
Read Project

 17

 FINISHED 
Long-term stable operation of Solid Oxide Fuel Cells (SOFC) is a basic requirement for introducing this technology to the stationary power market. Degradation phenomena limiting the lifetime can be divided into continuous (baseline) and incidental (transient) effects.This project is concerned with understanding the details of the major SOFC continuous degradation effects and developing models that ...
Read Project

 13

 FINISHED 

Distributed Energy Resources Research Infrastructure (DERRI)

Start date: Sep 1, 2009, End date: Dec 31, 2013,

DERRI has as its primary objective the further integration of the European Distributed Energy Re-sources research community through the provision of User Access to a unique portfolio of important European Laboratories in the field of Distributed Energy Resources, focusing mainly system and architectural aspects of smart energy network based on Distributed Generation.
Read Project

 18

 FINISHED 

GEn IV and Transmutation MATerials (GETMAT)

Start date: Feb 1, 2008, End date: Oct 31, 2013,

In FP5 and FP6, a number of significant projects have been launched, aimed at investigating innovative strategies for safe and optimised radioactive waste management. In particular P/T strategies based on the use of Accelerator Driven Systems are being addressed within the integrated project EUROTRANS. Moreover, during FP6, projects were also initiated to study advanced systems, as defined in the ...
Read Project

 24

 FINISHED 

High Energy Lithium-Ion Storage Solutions (HELIOS)

Start date: Nov 1, 2009, End date: Oct 31, 2013,

"The reluctance of OEM worldwide to extend electric drive applications to the private customers depends partly from considerations on customer acceptance (limited range in the case of EV, long charging time after depletion of the battery, cost), but also from the increased reliability and life span that private customers are entitled to expect.The first goal of HELIOS project is to evaluate electr ...
Read Project

 22

 FINISHED 

Wind Resource Assessment Audit and Standardization (WAUDIT)

Start date: Oct 1, 2009, End date: Sep 30, 2013,

"The objective of WAUDIT is the generation of a pool of researchers, in the field of wind resource assessment, in order to support the technological development of wind energy as one of the fastest growing industries worldwide (annual increase rate of 20%). The scientific motivation of the project is grounded on current state-of-the-art at industrial level. A technical audit to industry provides t ...
Read Project

 13

 FINISHED 
The overall objective of OPEN HOUSE is to develop and to implement a common European transparent building assessment methodology, complementing the existing ones, for planning and constructing sustainable buildings by means of an open approach and technical platform. OPEN HOUSE will develop a transparent approach able to emerge collectively in an open way across the EU. This approach will be commu ...
Read Project

 20

 FINISHED 
iNTeg-Risk is a large-scale integrating project aimed at improving the management of emerging risks in the innovative industry. This will be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will red ...
Read Project

 67

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Read Project

 35

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21

 FINISHED 
Manufacturing systems, power networks, transportation systems, road traffic networks, process plants, and other large-scale networked systems are often composed of multiple subsystems, with many embedded sensors and actuators, and characterised by complex dynamics and mutual influences such that local control decisions have long-range effects throughout the system. This results in a huge number o ...
Read Project

 9

 FINISHED 

Open Public Extended Network metering (OPEN meter)

Start date: Jan 1, 2009, End date: Jun 30, 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Read Project

 20

 FINISHED 

Building EnergY WATCHer (BeyWatch)

Start date: Dec 1, 2008, End date: May 31, 2011,

Targeting environmental sustainability, energy efficiency and new power distribution business models, BeyWatch aims to design, develop and evaluate an innovative, energy-aware, flexible and user-centric solution, able to provide interactive energy monitoring, intelligent control and power demand balancing at home, block and neighbour level.The system will interconnect legacy/consumer electronic de ...
Read Project

 8

 FINISHED 
EquiMar will deliver a suite of protocols for the equitable evaluation of marine energy converters (based on either tidal or wave energy). These protocols will harmonise testing and evaluation procedures across the wide variety of devices presently available with the aim of accelerating adoption though technology matching and improved understanding of the environmental and economic impacts associa ...
Read Project

 23

 FINISHED 
MMOTION is a support action answering the call EURATOM-Fission-2007-2.1.4 targeting a better understanding of Man-Machine-Organization in the operation of nuclear installations. The objective of MMOTION is to analyse the current situation and the future trends concerning MMO and safety related aspects, and to propose an European research road map for the period 2010-2015 to comprehensively addres ...
Read Project

 11

 FINISHED 
The level of automation and system complexity in factories and plants increases steadily which results in difficult and less-productive system engineering. Therefore, the main target of the MEDEIA project is to radically improve the development productivity of embedded control systems for the European industrial automation sector. The project results will reduce their system design time by 25%, wh ...
Read Project

 9

 FINISHED 
The main objective in this proposal is to develop methods to identify the relevance and strengths of various barriers for energy behaviour changes among end consumers and households, and to discuss how activities from political authorities, energy producers and NGOs can overcome these barriers. We will address changes in consumer behaviour along two dimensions. The first is energy saving and impro ...
Read Project

 8

 FINISHED 
"The growing economies in the southern and eastern Mediterranean area increasingly need affordable and efficient energy and water for sustainable development. Hybrid solar/fossil thermal power plants with combined sea water desalination based on concentrating solar power technology (CSP) offer a unique, cost efficient solution to the growing energy and water demand. Hybrid solar/fossil operation ...
Read Project

 14