Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 
The municipal wastewater in Europe contains a potential chemical energy of 87,500 GWh per year in its organic fraction, which is equivalent to the output of 12 large power stations. Due to the currently applied technologies and related energy loss at each process step, wastewater treatment in Europe today consumes instead the equivalent of more than 2 power stations. Many operators are thus target ...
Read Project

 16

 FINISHED 

IFA VET mobility+ 2016

Start date: Jun 1, 2016, End date: May 31, 2018,

The funding applied for within the framework of the project will be used to finance stays abroad for a total of 555 individuals and 8 accompanying persons.337 apprentices will complete a 2 to 6 week internship specifically suited to their profession, individual level of training, knowledge and skills at a company active in their professional field. IFA will organize internships in small groups sta ...
Read Project

 76

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

IFA VET mobility+ 2015

Start date: Jun 1, 2015, End date: May 31, 2017,

The funding applied for within the framework of the project will be used to finance stays abroad for a total of 542 individuals and 30 accompanying persons. 340 apprentices will complete a 3 to 6 week internship specifically suited to their profession, individual level of training, knowledge and skills at a company active in their professional field. IFA will organize internships in small groups s ...
Read Project

 66

 FINISHED 
The innovative and economic potential of Manufactured Nano Materials (MNMs) is threatened by a limited understanding of the related EHS issues. While toxicity data is continuously becoming available, the relevance to regulators is often unclear or unproven. The shrinking time to market of new MNM drives the need for urgent action by regulators. NANoREG is the first FP7 project to deliver the answe ...
Read Project

 73

 FINISHED 
As the patterns of power generation and distribution are rapidly changing in Europe towards a highly dispersed and volatile system, Distribution System Operators need to completely change traditional ways of grid operations. Currently developed solutions to increase the intelligence of medium and low voltage grids to cope with this task are often highly specialized, non-replicable and therefore no ...
Read Project

 13

 FINISHED 

Future INternEt Smart Utility ServiCEs (Finesce)

Start date: Mar 1, 2013, End date: Sep 30, 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Read Project

 34

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 
There are over three thousand spot welds in a typical car. When a car is repaired the spot welding parameters can be different as the mass production machinery used in manufacture can no longer be used. The repairer often is not an expert at inspecting spot welds. Assured reliability of the spot weld is paramount, since the integrity of the spot welds is vital to the crash performance of a car and ...
Read Project

 9

 FINISHED 

City multi-Role Optimized Vehicle (CITY MOVE)

Start date: Jan 1, 2010, End date: Mar 31, 2013,

"The delivery of freight in urban areas is based on general purpose commercial vehicles, not dedicated to a mission in a very specific scenario like urban areas. This is particularly true for medium vehicles (7,5-12 tons) that are however widely used in towns. CITY MOVE aims to develop a new concept for urban delivery vehicles, a real breakthrough from the actual vehicle platforms, using the lates ...
Read Project

 15

 FINISHED 
The Intelligent Car Initiative has identified road safety, energy efficiency, and traffic congestion as the main challenges currently being faced by European transportation. Despite their severity, these issues may be improved with the use of new in-vehicle technologies currently not available in the market. However, implementing new technologies implies a risk to manufacturers. Factors such as di ...
Read Project

 35