Search for European Projects

2 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The overall objective of the RAAI project is to develop novel NDT solutions for the corrosion assessment and crack detection as well as reliability software for high cycle variable amplitude corrosion fatigue of rail axles. Currently, the most sensitive non-destructive testing methods for inspection of rail axles are surface inspection methods designed for crack detection (such as MPI, eddy curren ...
Read Project

 3

 FINISHED 

Whole Life Rail Axle Assessment and Improvement (Wolaxim)

Start date: Nov 1, 2010, End date: Dec 31, 2012,

Axles for railway trains are carefully engineered and high value items that are designed to last 20 years or more. There is however a current trend for axles to be withdrawn from service before this because of corrosion on the surface long before their design lives. The decision to withdraw from service is taken without the full knowledge of the way in which the failure will result from corrosion, ...
Read Project

 9