Search for European Projects

4 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...s a market of some 140€ billion and wind energy is the clear front runner.Presently in situ blade inspection is carried out every 3-6 month visually or with manual operatives involved in dangerous abseiling. In certain cases, a blade is dismantled and transported onshore, making the turbine downtime very high.The AUTOWINSPEC project will provide a system to automatically estimate the condition and ...
Read Project

 9

 FINISHED 
...lting from ice thrown from the blades.The SME consortium target a significant penetration of the EU market within a 5 year period, achieving sales of ~ €71.5 million and creating ~475 jobs. Implementation of the technology across the EU will make a significant contribution to increasing the renewable energy share and reducing CO2 emissions.
Read Project

 11

 FINISHED 
...s. This will be the first time that a shearography system is used for inspecting a WTB in-service at a wind energy installation.The proposed concept and system is not limited to NDT of rotating WTBs, and can be extended to inspect other dynamic structures with large rigid body motion.• Develop a wavefront splitter and/or a compact spatial carrier mask to achieve simultaneous spatial phase shifting ...
Read Project

 10

 FINISHED 
"The wind turbine industry is the fastest growing market area for the use of composite materials. Current state-of-the-art turbines are increasing in size, providing multi-megawatt power output. To generate such power turbine rotorblade diameters exceeding 100m along with nacelle heights of 120m are becoming standard. As turbines grow and their deployment becomes more widespread and remote, it is ...
Read Project

 9