Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 

The Novel Materials Discovery Laboratory (NoMaD)

Start date: Nov 1, 2015, End date: Oct 31, 2018,

Essentially every new commercial product, be they smart phones, solar cells, batteries, transport technology, artificial hips, etc., depends on improved or even novel materials. Computational materials science is increasingly influential as a method to identify such critical materials for both R&D. Enormous amounts of data, precious but heterogeneous and difficult to access or utilise, are already ...
Read Project

 11

 FINISHED 

Computing Patterns for High Performance Multiscale Computing (ComPat)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

Multiscale phenomena are ubiquitous and they are the key to understanding the complexity of our world. Despite the significant progress achieved through computer simulations over the last decades, we are still limited in our capability to accurately and reliably simulate hierarchies of interacting multiscale physical processes that span a wide range of time and length scales, thus quickly reaching ...
Read Project

 11

 FINISHED 

DEEP Extended Reach (DEEP-ER)

Start date: Oct 1, 2013, End date: Mar 31, 2017,

The proposed project DEEP-ER (DEEP-Extended Reach) addresses two significant Exascale challenges: the growing gap between I/O bandwidth and compute speed, and the need to significantly improve system resiliency. DEEP-ER will extend the Cluster-Booster architecture of the Dynamical Exascale Entry Platform (DEEP) project by a highly scalable I/O system and will implement an efficient mechanism to re ...
Read Project

 17

 FINISHED 
Large scale genomics projects exploiting high throughput leading technology have produced and continue to produce massive data sets with exponential growing rates. So far, only a small part of this data can be abstracted, managed and processed, giving an incomplete understanding of the biological process being observed. The lack of processing power is a bottle neck in acquiring results. Comparativ ...
Read Project

 6

 FINISHED 
The Mont-Blanc project aims to develop a European Exascale approach leveraging on commodity power-efficient embedded technologies. The project has developed a HPC system software stack on ARM, and will deploy the first integrated ARM-based HPC prototype by 2014, and is also working on a set of 11 scientific applications to be ported and tuned to the prototype system.The rapid progress of Mont-Blan ...
Read Project

 17

 FINISHED 

PRACE - Third Implementation Phase Project (PRACE-3IP)

Start date: Jul 1, 2012, End date: Jun 30, 2016,

PRACE-3IP supports the accelerated implementation of the pan-European HPC Research Infrastructure (RI) created in April 2010. It continues, complements, and extends the work of the PRACE-1IP and -2IP projects.PRACE-3IP addresses the computational and simulation needs of European scientific communities and of industry to keep them at the forefront of discovery. Our vision is the formation of an int ...
Read Project

 48

 FINISHED 
The aim of PROMISCE is to provide the foundations for a novel research field: propagating quantum microwave technologies in strongly and ultrastrongly coupled environments. In particular, its potential for scalable quantum information and communication technology (Q-ICT) applications will be demonstrated. PROMISCE is born from a challenging and controversial idea, which is that microwave photons c ...
Read Project

 4

 FINISHED 
The earthquake and seismology research, an intrinsically Global undertaking, addresses both fundamental problems in understanding Earth's internal wave sources and structures, and augment applications to societal concerns about natural hazards, energy resources, environmental change, and national security. This community is central in the European Plate Observing System (EPOS), the ESFRI initiativ ...
Read Project

 12

 FINISHED 

Dynamical Exascale Entry Platform (DEEP)

Start date: Dec 1, 2011, End date: Aug 31, 2015,

DEEP proposes to develop a novel, Exascale-enabling supercomputing platform along with the optimisation of a set of grand-challenge codes simulating applications highly relevant for Europe's science, industry and society. The DEEP System will realise a Cluster Booster Architecture that can cope with the limitations purported by Amdahl's Law. It will serve as proof-of-concept for a next-generation ...
Read Project

 18

 FINISHED 
There is a continued need for higher compute performance: scientific grand challenges, engineering, geophysics, bioinformatics, etc. However, energy is increasingly becoming one of the most expensive resources and the dominant cost item for running a large supercomputing facility. In fact the total energy cost of a few years of operation can almost equal the cost of the hardware infrastructure. En ...
Read Project

 14

 FINISHED 
The use of High Performance Computing (HPC) is commonly recognized a key strategic element both in research and industry for an improvement of the understanding of complex phenomena. The constant growth of generated data - Big Data - and computing capabilities of extreme systems lead to a new generation of computers composed of millions of heterogeneous cores which will provide Exaflop performance ...
Read Project

 21

 FINISHED 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Read Project

 72

 FINISHED 

Automatic Online Tuning (AutoTune)

Start date: Oct 15, 2011, End date: Apr 14, 2015,

Description To develop an automatic online performance analysis tool including energy efficiency tuning for parallel programming that will increase multi-core programming efficiency by orders of magnitudePerformance analysis and tuning is an important step in programming multi-core-based parallel architectures ranging from small clusters ...
Read Project

 6

 FINISHED 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Read Project

 143

 FINISHED 

Circuit and Cavity Quantum Electrodynamics (CCQED)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

This network will bridge two very active disciplines in physics, namely the quantum electrodynamics of atoms or ions strongly interacting with light in resonators, and the emerging field of solid-state superconducting circuit quantum electrodynamics. Advanced techniques will be developed jointly with industry partners for the manipulation of a deterministic number of particles - atoms, ions or art ...
Read Project

 13

 FINISHED 

PRACE - Second Implementation Phase Project (PRACE-2IP)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

PRACE-2IP supports the accelerated implementation of the pan-European HPC Research Infrastructure created in April 2010 as the result of the preparatory phase PRACE project. It complements and extends the work of the PRACE-1IP project that was started in July 2010.PRACE-2IP addresses the computational and simulation needs of European scientific communities to keep them at the forefront of discover ...
Read Project

 50

 FINISHED 

e-Infrastructure Reflection Group Support Programme 3 (e-IRGSP3)

Start date: Dec 1, 2010, End date: Jun 30, 2014,

The e-Infrastructure Reflection Group Support Programme 3 (e-IRGSP3) supports the e-Infrastructure Reflection Group (e-IRG). The e-IRG reflects on results and developments in the area of e-infrastructures. It consists of government appointed national representatives and was created in 2003. The e-IRG has reached a high ranking position as an independent advisory body in Europe in its field. It coo ...
Read Project

 8

 FINISHED 

PRACE - First Implementation Phase Project (PRACE-1IP)

Start date: Jul 1, 2010, End date: Dec 31, 2013,

Large scale simulations are the third pillar of science today alongside theory and experiment. They produce scientific insights, technological advances, and solve problems in many fields of society. Their tools are high-end computers and effective software. PRACE, the Partnership for Advanced Computing, has been created as a not for profit association in May 2010 as a permanent pan-European High P ...
Read Project

 46

 FINISHED 

Scalable Software Services for Life Science (ScalaLife)

Start date: Sep 1, 2010, End date: Aug 31, 2013,

Life Science is developing into one of the largest e- Infrastructure users in Europe, in part due to the ever-growing amount of biological data. Modern drug design typically includes both sequence bioinformatics, in silico virtual screening, and free energy calculations, e.g. of drug binding. This development will accelerate tremendously, and puts high demands on simulation software and support se ...
Read Project

 6

 FINISHED 

Initiative for Globus in Europe (IGE) (IGE)

Start date: Oct 1, 2010, End date: Apr 30, 2013,

In order to continuously support the European computing infrastructures and to exploit possible synergies, it is of crucial importance to coordinate the European Globus activities, drive forward the developments according to the requirements of the European users and to strengthen the influence of the European developers in the Globus Alliance. Topics like security or privacy, data privacy protect ...
Read Project

 11

 FINISHED 
"""FINELUMEN"" is a 4-year project aiming at the preparation and extensive characterization of luminescent materials in which suitably designed organic and inorganic luminophores are encapsulated within nano-containers (carbon nanotubes and coordination cages) in which they can preserve and even improve their emission output. The ultimate goal is to create a library of luminescent modules emitting ...
Read Project

 11

 FINISHED 
DEISA2 continues to support and develop a distributed high performance computing infrastructure by consolidating the existing DEISA infrastructure and extending its collaborative environment for capability computing and data management. The resulting infrastructure is unmatched world-wide in its heterogeneity and complexity, enabling the operation of a powerful supercomputing Grid built on top of ...
Read Project

 11

 FINISHED 

Partnership for Advanced Computing in Europe (PRACE)

Start date: Jan 1, 2008, End date: Jun 30, 2010,

ESFRI has identified High Performance Computing (HPC) as a strategic priority for Europe. Scientists and engineers must be provided with access to capability computers of leadership class in Europe to remain competitive internationally and to maintain or regain leadership. Supercomputers are an indispensable tool to solve the most challenging problems through simulations.PACE, the Partnership for ...
Read Project

 31

 FINISHED 
The use of modern space based techniques gives us new potential to monitor and prevent natural risk, reduce economic losses, and save lives.The aim of the ALPS-GPSQUAKENET is to build up a high-performance transnational space geodetic network of Global Positioning System (GPS) receivers in the Alpine Space. This GPS array, within the millimeter-per-year precision, will represent the first ever ins ...
Read Project

 13