Search for European Projects

15 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Innovative CO2 capture (iCap)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deplo ...
Read Project

 14

 FINISHED 
PolyBright will develop high power high brilliance lasers with new wavelengths between 1500 and 1900 nm which are adapted to the absorption properties of polymers. With innovative beam manipulation systems for optimum adaption of energy, the project will provide high speed and flexible laser manufacturing technology to expand the limits of current plastic part assembly. Key innovations of the Poly ...
Read Project

 18

 FINISHED 
Five Transmission System Operators (Belgium, France, Germany and Spain) together with seven RTD performers propose a 3 year research and demonstration project to compare pros and cons of new market designs aiming at the integration of massive intermittent energy sources dispersed in several regional power markets. Under the technical coordination of RTE, they will implement a novel network/system/ ...
Read Project

 15

 FINISHED 
The projects main R&T objective is to create new, smart and bio-based surface nanostructured polymer composites showing exceptional surface functionality (mechanical, chemical, selective interaction properties). These new materials will be composed of nano-scaled polysaccharides layers with embedded nano-particles, coating different celluloses matrices. The compounding is restricted to the biopoly ...
Read Project

 14

 FINISHED 

Water Detoxification Using Innovative vi-Nanocatalysts (Clean Water)

Start date: Jun 1, 2009, End date: May 31, 2012,

The concept of the project is based on the development of innovative nanostructured UV-Visible photocatalysts for water treatment and detoxification by using doped TiO2 nanomaterials with visible light response. The project aims at an efficient and viable water detoxification technology exploiting solar energy and recent advances in nano-engineered titania photocatalysts and nanofiltration membran ...
Read Project

 7

 FINISHED 

REDOX PHENOMENA CONTROLLING SYSTEMS (RECOSY)

Start date: Apr 1, 2008, End date: Mar 31, 2012,

Main objectives of ReCosy are the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal and providing tools to apply the results to Performance Assessment/Safety Case. Although redox is not a new geochemical problem, different questions are still not resolved and thus raised by implementers and scientists. From a top-down appr ...
Read Project

 32

 FINISHED 

Monitoring Atmospheric Composition and Climate (MACC)

Start date: Jun 1, 2009, End date: Dec 31, 2011,

"MACC (Monitoring Atmospheric Composition and Climate) is designed to meet the requirements that have been expressed for the pilot Core GMES Atmospheric Service. The project has been prepared by the consortia of the FP6 project GEMS and the GSE project PROMOTE, whose core service lines will provide the starting point for MACC. From mid-2009 MACC will continue, improve, extend, integrate and valida ...
Read Project

 45

 FINISHED 
"The aim of PERFECTION is to help enable the application of new building design and technologies that improve the impact of the indoor built environment on health, comfort, feeling of safety and positive stimulation. The project concept consists of the following components: - the inventory of current standards, regulations, technologies and ongoing and recent research activities and policies relat ...
Read Project

 11

 FINISHED 
Motivation: Nanocomposites are emerging new materials that promise improved properties. Their applicability, however, is presently limited by the cost of manufacture and product reproducibility. Literature shows that on the bench scale, dramatic improvement in polyolefin mechanical properties can be obtained by intercalation and exfoliation of nanoparticles in the matrix. However, when materials p ...
Read Project

 11

 FINISHED 
SANDERA will focus on the future relationship between two critical European policy domains: namely, the EU strategy since Lisbon to move towards the European Research Area and those EU policies focused on the security of the European citizen in the world. SANDERA will use exploratory scenarios to 2020 to examine how future developments in European security and defence policies combined with techno ...
Read Project

 9

 FINISHED 
The DIPLECS project aims at designing an Artificial Cognitive System architecture that allows for learning and adapting hierarchical perception-action cycles in dynamic and interactive real-world scenarios. The architectural progress will be evaluated within the scenario of a driver assistance system that continuously improves its capabilities by observing the human driver, the car data, and the e ...
Read Project

 6

 FINISHED 
Production of PE in Western Europe alone is 13.5 million tonnes p.a. The scrap PE from this production is 15% scrap of which 35% is coloured; creating 709 000 tons of off-spec material. The price on off-spec PE is €1050/ton, indicating a European industrial waste PE recycling market €744M p.a. only in Western Europe. The annual production world wide of 60 mill. tons PE indicates a world wide marke ...
Read Project

 10

 FINISHED 
There are 2.5 million reported fires, causing 20-25,000 deaths, 250-500,000 injuries and extensive environmental damage each year in the EU. The cost of fire damage to the EU is estimated at 100 billion Euros. Fire safety equipment such as fire alarms and emergency lighting is extremely effective at reducing the damage and cost associated with fires. Fire resistant cabling that transmits power and ...
Read Project

 9

 FINISHED 

DIGITALWORLD FORUM ON ACCESSIBLE AND INCLUSIVE ICT (DIGITALWORLD)

Start date: Jan 1, 2008, End date: Sep 30, 2009,

The DigitalWorld Forum is an attempt to gather the foremost experts in the field of inclusive and accessible ICT and Developing Countries in a context of Sustainable Development and to create a Forum where the different initiatives and actors would be able to network and to exchange best practices and success stories in order to deliver development-related ICT research exploitation and cooperation ...
Read Project

 9

 FINISHED 
"LASERLAB-EUROPE, an Integrated Infrastructure Initiative (I3) in FP6, combines the majority of the largest national laboratories in the area of laser-based inter-disciplinary research at the European level. Together they represent a comprehensive collection of modern laser technologies and laser research, and pursue applications in sciences and life sciences through in-house research and services ...
Read Project

 17