Search for European Projects

9 European Projects Found

Searched on 125080 European Projects

 FINISHED 
In a radical paradigm shift, manufacturers are now moving from multicore chips to so-called manycore chips with up to a million independent processors on the same silicon real estate. However, software cannot benefit from the revolutionary potential power increase, unless the design and code is polluted by an unprecedented amount of low-level, fine-grained concurrency detail.Concurrency in mainstr ...
Read Project

 4

 FINISHED 

Technology Transfer in Computing Systems (TETRACOM)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Read Project

 33

 FINISHED 
The exponential growth in the number of cores requires radically new software development technologies. Many expect 100,000-core platforms to become commonplace, and the best predictions are that core failures on such an architecture will be common, perhaps one an hour. Hence we require programming models that are not only highly scalable but also reliable. The project aim is to scale the radic ...
Read Project

 8

 FINISHED 

Low-Power Parallel Computing on GPUs (LPGPU)

Start date: Sep 1, 2011, End date: Oct 31, 2014,

Massively parallel GPUs are now being used in a great variety of market segments, ranging from video-games,to user interfaces, and to HPC. There are several signs, however, that computer and consumer technologyindustries are faced with major challenges in delivering improved performance and innovation for futureentertainment devices. First, game developers have argued that while GPUs are increasin ...
Read Project

 6

 FINISHED 
"The aim of this project is a step-change in railway capacity by reducing delays and improving traffic fluidity. This will be achieved by a partnership between railway industry experts, system integrators, small dynamic knowledge led companies and academic researchers.There are 4 levels of work:L1: High level principles, definitions and requirements to direct researchL2: Methods and algorithms der ...
Read Project

 19

 FINISHED 

Embedded Reconfigurable Architectures (ERA)

Start date: Jan 1, 2010, End date: Mar 31, 2013,

Description To develop an embedded system platform that dynamically adapt itself to the applications. The platform will be open-source: both the industry and academia can use it for fast design-space prototypingThe design of embedded systems such as mobile smartphones becomes increasingly more complex as multi-core processors are needed t ...
Read Project

 11

 FINISHED 

A Highly Efficient Adaptive Multi-processor Framework (HEAP)

Start date: Feb 1, 2010, End date: Jan 31, 2013,

Description Making modern embedded systems faster and less power hungry by parallelizationWriting parallel programs has traditionally been considered a difficult task, even when parallelism is taken into account from the beginning. Moreover there is an urgent need to parallelize the massive amounts of legacy sequential code so as to incre ...
Read Project

 11

 FINISHED 

ArtistDesign – Design for Embedded Systems (ArtistDesign)

Start date: Jan 1, 2008, End date: Mar 31, 2012,

The ArtistDesign NoE is the visible result of the ongoing integration of a community, that emerged through the Artist FP5 Accompanying Measure and that was organised through the Artist2 FP6 NoE.The central objective for ArtistDesign is to build on existing structures and links forged in Artist2, to become a virtual Center of Excellence in Embedded Systems Design. This will be mainly achieved throu ...
Read Project

 38

 FINISHED 
The main objective of the RESUMENET is to host original research work that will systematically embed resilience into future Internet. The project work has three main dimensions.•\tAt framework-level, work will elaborate on the D2R2+DR (Defend, Detect, Remediate, Restore; Diagnose, Refine) framework, and quantify the impact of different types of challenges and failures on normal network service ope ...
Read Project

 9