Search for European Projects

17 European Projects Found

Searched on 125080 European Projects

 FINISHED 
DESIRE will focus on epileptogenic developmental disorders EDD, i.e. early onset epilepsies whose origin is closely related to developmental brain processes. A major cause of EDD are malformations of cortical development (MCD), either macroscopic or subtle. EDD are often manifested as epileptic encephalopathies (EE), i.e. conditions in which epileptic activity itself may contribute to severe cogni ...
Read Project

 29

 FINISHED 

Imaging of Neuroinflammation in Neurodegenerative Diseases (INMiND)

Start date: Mar 1, 2012, End date: Feb 28, 2017,

The goal of this proposal (INMiND) is to carry out collaborative research on molecular mechanisms that link neuroinflammation with neurodegeneration in order to identify novel biological targets for activated microglia, which may serve for both diagnostic and therapeutic purposes, and to translate this knowledge into the clinic. The general objectives of INMiND are:(i) to identify novel mechanisms ...
Read Project

 32

 FINISHED 

End-user driven DEmo for cbrNe (EDEN)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Read Project

 47

 FINISHED 
"Carbon capture and storage (CCS) is one of the technological solutions to decarbonize the energy market while providing secure energy supply. So far, the cost of CCS is dominated by the CO2 capture, reason why new capture techniques should be developed.Adsorption techniques have already been evaluated for CO2 capture. So far, the main drawbacks of this technique are the energetic demand to regene ...
Read Project

 12

 FINISHED 
In recent years, traditional processors have not been able to translate the advances of silicon fabrication technology into corresponding performance gains. This has been due to weaknesses inherent in the current sequential programming model, which has not changed significantly since the late 1940's, as well as due to physical constraints, such as practical limits on the energy consumption and the ...
Read Project

 9

 FINISHED 

Mobility and Transport Digital Wallet (MobiWallet)

Start date: Feb 1, 2014, End date: Jul 31, 2016,

Fare management schemes in transport are increasingly becoming more digitized in most large cities. However, most suffer from a siloed approach, as each transport mode is owned, operated or maintained by a range of different actors. The fact that these actors often come from public, private or even mixed backgrounds adds a layer of complexity to the issue of interoperable fare management. However, ...
Read Project

 15

 FINISHED 
"The core concept of Accelerated Metallurgy is to deliver an integrated pilot-scale facility for the combinatorial synthesis and testing of many thousands of unexplored alloy formulations. This facility would be the first of its kind in the world and would represent a significant advance for metallurgy. The novel technology that enables this HTT facility is based on automated, direct laser deposit ...
Read Project

 34

 FINISHED 
Description Design and fabrication of a soft robotic arm that can reconfigure itself and stiffen by hydrostatic actuation In Minimally Invasive Surgery (MIS), tools go through narrow openings and manipulate soft organs that can move, deform, or change stiffness. Currently, there are limitations on ...
Read Project

 12

 FINISHED 
"BOR4STORE proposes an integrated, multidisciplinary approach for the development and testing of novel, optimised and cost-efficient boron hydride based H2 storage materials with superior performance (capacity more than 8 wt.% and 80 kg H2/m^3) for specific fuel cell applications.Building on the results of past and ongoing EC funded projects on H2 storage, BOR4STORE aspires to tackle the S&T chall ...
Read Project

 9

 FINISHED 

Biohybrid templates for peripheral nerve regeneration (Biohybrid)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

The BIOHYBRID consortium was build up with the overall aim to develop, in a preclinical perspective, an innovative biohybrid artificial nerve device for the regenerative treatment of traumatic injuries of peripheral nerves. This consortium consists of three active and well integrated SMEs as well as seven academic partners that are recognised leaders in the scientific areas of interest for this pr ...
Read Project

 10

 FINISHED 
Recreational water use is usually a very small but growing percentage of total water use and is mostly tied to reservoirs. If a reservoir is kept fuller than it would otherwise be for recreation, then the water retained could be categorized as recreational usage. Recreational usage is usually non-consumptive. The report from the European Environment Agency (EEA), reveals that Europe has so far con ...
Read Project

 9

 FINISHED 

DECiphering the role of long non COding Rna in cancer (DECODER)

Start date: Nov 1, 2011, End date: Oct 31, 2014,

"Increasing evidence indicates that non coding RNAs play a major role in the regulation of gene expression. A significant fraction of the non-coding transcriptome is represented by large intervening non coding RNA (lincRNAs), which seem to be involved with the epigenetic control of gene expression through binding with several members of the Polycomb Repressive Complexes (PRCs). Recently, dysregula ...
Read Project

 1

 FINISHED 

Integrated management of product heterogeneous data (iProd)

Start date: Feb 1, 2011, End date: Jan 31, 2014,

Description iProd aims to improve the efficiency and quality of the Product Development Process of innovative products by developing a flexible, service oriented, customer driven software frameworkData and knowledge management technologies are of strategic importance for industrial innovation, provided they are integrated in the company p ...
Read Project

 17

 FINISHED 

European Network for Cell Imaging and Tracking Expertise (ENCITE)

Start date: Jun 1, 2008, End date: Nov 30, 2012,

"Cell therapy can be defined as the transplantation of living cells for the treatment of medical disorders. Three different principles underlie the increasing interest in cell therapy. 1. Transplanted cells used as an “active drug” 2. Transplanted cells used to replace damaged and degenerated tissue. 3. Cells used as a drug delivery vehicle. Promising results have been obtained in pre-clinical and ...
Read Project

 30

 FINISHED 
INNOVASOL aims to develop radically new nanostructured materials for photovoltaic (PV) excitonic solar cells (XSCs) really competitive with traditional energy sources. The main objective is to leapfrog current limitations of third-generation PV devices through a drastic improvement of the materials used for assembling XSCs. The first step is the substitution of the liquid electrolytes, currently u ...
Read Project

 8

 FINISHED 
DIVERSITY is a 36 months CSA (Supporting) project involving 14 partners from 11 European countries (Germany, Austria, Belgium, France, Spain, Italy, Sweden, Slovenia, UK, Slovakia, Greece). It represents a pilot initiative of networking policy makers, human resources experts, women scientists’ networks, and scientists to support the institutional culture change for a greater inclusiveness of women ...
Read Project

 14

 FINISHED 
At present there is no solid state hydrogen storage material available fulfilling all requirements for practical use in mobile applications. These are 1. high storage density, 2. temperatures and heats of operation compatible with PEM fuel cells, 3. high hydrogen loading and unloading speeds in the range of a few minutes and 4. low production costs. FlyHy focuses especially on the first three poin ...
Read Project

 6