Search for European Projects

28 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Read Project

 37

 FINISHED 

Hydrogen Mobility Europe (H2ME)

Start date: Jun 1, 2015, End date: May 31, 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Read Project

 27

 FINISHED 
The present situation of nuclear energy in Europe asks for a continuing effort in the field of Education and Training aimed to assure a qualified workforce in the next decades. In this scenario, the present proposal is aimed at enhancing and networking the Europe-wide efforts initiated in the past decades by different organisations belonging to academia, research centres and industry to maintain a ...
Read Project

 25

 FINISHED 
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term operation (LTO) of existing European nuclear power plants (NPPs). SOTERIA has set up a collaborative research consortium wh ...
Read Project

 25

 FINISHED 
The Modern2020 project aims at providing the means for developing and implementing an effective and efficient repository operational monitoring programme, taking into account the requirements of specific national programmes. The work allows advanced national radioactive waste disposal programmes to design monitoring systems suitable for deployment when repositories start operating in the next deca ...
Read Project

 28

 FINISHED 

Severe Accident Facilities for European Safety Targets (SAFEST)

Start date: Jul 1, 2014, End date: Jun 30, 2018,

"Severe accident with core meltdown is a threat to the containment integrity. As Chernobyl and Fukushima accidents demonstrate, significant release of radioactive products into the environment can cause severe consequences both for people's health and the country's economy. Severe accidents are the focus of considerable research involving substantial human and financial resources worldwide. The re ...
Read Project

 9

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 
MATISSE is a 36-month project targeting to the delivery of PEMFC advanced cells and stacks for stationary applications. The project methodology will include assessment of stack incremented with new materials and processes developed during the project. The project will address three stack designs for each of the stationary conditions of operation of the fuel cell i.e. H2/O2, H2/air and reformate H2 ...
Read Project

 6

 FINISHED 
... countries, coming from diverse organization types: Technical Safety Organizations (IRSN), applied research (CIEMAT, PSI, RSE, VTT), more academic research (CSIC, UniLor) and utilities/industry (EDF, AREVA). They have a strong experience and knowledge of severe accidents and more specifically of Filtered Containment Venting Systems and propose to share the work in a really complementary manner."
Read Project

 11

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Read Project

 25

 FINISHED 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Read Project

 22

 FINISHED 
Austenitic stainless steel is often used in the construction of critical pipework in nuclear power plant and petrochemical plant due to its resistance to corrosion and its high fracture resistance. Pipelines are usually constructed by joining sections of pipe together, using welding. These welds can host many types of defects that may go undetected if not inspected and in-service and under stress ...
Read Project

 7

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 
ELYGRID Project aims at contributing to the reduction of the total cost of hydrogen produced via electrolysis couple to Renewable Energy Sources, mainly wind turbines, and focusing on mega watt size electrolyzes (from 0,5 MW and up). The objectives are to improve the efficiency related to complete system by 20 % (10 % related to the stack, and 10 % electrical conversion) and to reduce costs by 25% ...
Read Project

 11

 FINISHED 
"SILER is a Project aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures.The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events and tsunamis) and to the identification of mitigation strategies, acting both on structures/com ...
Read Project

 18

 FINISHED 
In view of the increasing age of the European NPPs and envisaged life time extensions up to an EOL of 80 years, there is a need for an improved understanding and prediction of RPV irradiation embrittlement effects connected with long term operation (LTO). Effects caused by high neutron fluences such as the possible formation of Late Blooming Phases and as yet unknown defects must be considered ade ...
Read Project

 17

 FINISHED 
"The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components w ...
Read Project

 21

 FINISHED 
"In nuclear power plants, materials may undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities that operate these reactors need to quantify the ageing and the potential degradations of some essential structures of the power plant to ensure safe and reliable plant operation. So far, the material databases needed to take account of these degradation ...
Read Project

 23

 FINISHED 

Europen Nuclear Education Network Training Schemes (ENEN-III)

Start date: May 1, 2009, End date: Apr 30, 2013,

The project covers the structuring, organisation, coordination and implementation of training schemes in cooperation with local, national and international training organisations, to provide training to professionals active in nuclear organisations or their contractors and subcontractors. The training schemes provide a portfolio of courses, training sessions, seminars and workshops for continuous ...
Read Project

 20

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 
"The main objective of the NEXPEL project, a successful demonstration of an efficient PEM electrolyser integrated with Renewable Energy Sources, supports the overall vision to establish hydrogen as an energy carrier in a large range of applications in the near future. The very ambitious objectives in the call will be addressed by a top class European consortium which is carefully balanced between ...
Read Project

 7

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Read Project

 35

 FINISHED 
Up to now fuel development and qualification has been a long and expensive process essentially based on an empirical approach. European experts currently have an adequate knowledge of conventional fuel manufacturing and its behaviour under operating conditions encountered during 50 years of industrial application and R&D activities. For innovative fuel systems, however, the empirical approach has ...
Read Project

 19

 FINISHED 
The objective of this coordination action is to develop best practice guidelines for the performance of Level-2 PSA methodologies with a view to harmonization at EU level and allowing a meaningful and practical uncertainty evaluation in a Level-2 PSA. Speficic relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, research or services companies) ...
Read Project

 23

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27