Search for European Projects

10 European Projects Found

Searched on 125080 European Projects

 FINISHED 

3D Advanced Metrology and materials for advanced devices (3DAM)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The objective of the 3DAM project is to develop a new generation of metrology and characterization tools and methodologies enabling the development of the next semiconductor technology nodes. As nano-electronics technology is moving beyond the boundaries of (strained) silicon in planar or finFETs, new 3D device architectures and new materials bring major metrology and characterization challenges w ...
Read Project

 18

 FINISHED 

Technology Advances and Key Enablers for 5 nm (TAKE5)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The TAKE5 project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 10nm technology node and the ECSEL JU project SeNaTe aiming at the 7nm technology node. The main objective of the TAKE5 project is the demonstration of 5nm patterning in line with the industry needs and the ITRS roadmap in the Advanced Patter ...
Read Project

 13

 FINISHED 

Seven Nanometer Technology (SeNaTe)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Read Project

 41

 FINISHED 

Pilot Line For Self Assembly Copolymer Delivery (PLACYD)

Start date: Jan 1, 2014, End date: Jan 1, 2017,

The PLACYD project aims at strengthening the European leadership in the field of advanced lithography. The consortiums gathers the main European Rnull actors along the whole value chain (Material suppliers, equipment suppliers, semiconductor companies, CAD companies, research laboratories) in order to bring the key materials, processes and design tools for Directed Self Assembly (DSA) Lithography ...
Read Project

 11

 FINISHED 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Read Project

 13

 FINISHED 
SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Read Project

 26

 FINISHED 
Five major global semiconductor companies are working in the G450C consortium based in Albany N.Y. to introduce 450mm wafer semiconductor processing and are now installing the first wave of 450mm prototype systems. Intel and TSMC lead this effort with published roadmaps showing pilot lines in 2016, production in 2018. Samsung will soon follow which will force GlobalFoundries, SK Hynix, Toshiba, UM ...
Read Project

 12

 FINISHED 

European 450mm Equipment Demo Line (E450EDL)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The aim of the E450EDL project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative and proceeded with subsequent projects funded with public money, amongst others NGC450, SOI450, EEM450PR. The demo line resulting from this project will be such that it will enable first crit ...
Read Project

 44

 FINISHED 

European E&M 450mm Pilotline Readiness (EEM450PR)

Start date: Apr 1, 2012, End date: Mar 1, 2015,

Aim of the EEM450PR project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative. It will also bring about the start of a vision to place an equipment development pilot line in the imec facility in Leuven. This will provide Europe with a complementary activity for 450mm equi ...
Read Project

 32

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39