Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term operation (LTO) of existing European nuclear power plants (NPPs). SOTERIA has set up a collaborative research consortium wh ...
Read Project

 25

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Read Project

 22

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 
The objective of this coordination action is to develop best practice guidelines for the performance of Level-2 PSA methodologies with a view to harmonization at EU level and allowing a meaningful and practical uncertainty evaluation in a Level-2 PSA. Speficic relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, research or services companies) ...
Read Project

 23

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27