Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 

AUTomotive deRivative Energy system (AutoRE)

Start date: Aug 1, 2015, End date: Jul 31, 2018,

"The overall aim is to create the foundations for commercializing an automotive derivative fuel cell system in the 50 to 100 kW range, for combined heat and power (CHP) applications in commercial and industrial buildings. More specifically, the project has the following objectives:• develop system components allowing reduced costs, increased durability and efficiency • build and validate a first ...
Read Project

 7

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
...(IMFT-INP), and advanced laser-based measurement techniques (INSEAN). Knowledge output is synthesized through a dedicated knowledge capturing programme by UoG, which is used by private sector partner Alstom UK. In AeroTraNet 2, the research output becomes itself object of knowledge management research, which is a novel supra-disciplinary element. By combining their well-established doctoral traini ...
Read Project

 8

 FINISHED 
The DeICE-UT project will overcome the current limitations of existing wind turbine blade de-icing systems by developing an innovative dual de-icing system combining both high power ultrasonic guided waves and low frequency vibrations. Previous work on helicopter blades has shown that low frequency vibrations are highly effective at de-icing across the blades except at the leading edges, whilst th ...
Read Project

 11

 FINISHED 
The intelligent and cost effective use of CCS technologies requires new strategies to increase the net efficiency of coal fired power plants. Among them, the most promising are summarised as below:- Increase working steam temperature and pressure in new USC power plants (350-370 bar, 700/720°C minimum), and hence increase the severity of fireside operating conditions,- Promote clean coal technolog ...
Read Project

 26

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 
Carbon Capture and Sequestration has become an important technology to comply with the CO2 reduction targets set by the EC. However CCS has the drawback that the electrical efficiency of the coal fired power plant will drop significantly. To overcome this drawback, one has to increase the base efficiency of the power plant or increase the biomass co-firing share as this is a CO2 neutral energy sou ...
Read Project

 15

 FINISHED 

Flutter-Free Turbomachinery Blades (FUTURE)

Start date: Jul 1, 2008, End date: Jun 30, 2013,

"FUTURE brings together European and international well reputed centres-of-excellence in order to reach major scientific & technical objectives in striving towards flutter-free turbomachine blades. By advancing the state-of-the-art in flutter prediction capabilities and design rules, the FUTURE project will lead to benefits in terms of decreased development cost, reduced weight and fuel consumptio ...
Read Project

 26

 FINISHED 
DECARBit responds to the urgent need for further research and development in advanced pre-combustion capture techniques to substantially reduce emissions of greenhouse gases from fossil fuel power plants. The project will accelerate the technology development and contribute to the deployment of large scale carbon capture and storage (CCS) plants in line with the adopted European policies for emiss ...
Read Project

 18

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27

 FINISHED 
"The EU Council of Ministers held 8 & 9th march 2007 examined theses issues and agreed: “Renewable energy will cover at least 20 % of the EU’s energy demand by 2020”, amongst others. Wind power can make the most important contribution to these targets, if sufficient emphasis is established on technological R&D and market development. Because of the current European scenario and its forecasted evol ...
Read Project

 11