Search for European Projects

5 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Integrated Spectrometers for Spectral Tissue Sensing (InSPECT)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

Image-guided needle procedures - such as taking biopsies in screening cancerous tumours - are becoming increasingly important in clinical practice. Today, physicians are severely hampered by the lack of precision in positioning the needle tip. Real-time tissue-characterization feedback at the needle tip during these procedures can significantly improve the outcome of diagnosis and treatment, and r ...
Read Project

 9

 FINISHED 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Read Project

 18

 FINISHED 

Photonic Hybrid ASsembly Through FLEXible waveguides (PHASTFlex)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

PHASTFLEX proposes the development of a fully automated, high precision, cost-effective assembly technology for next generation hybrid photonic packages. In hybrid packages, multiple Photonic ICs (PICs) are assembled, combining the best of different material platforms for a wide range of applications and performance. In PHASTFlex, InP PICs with active functions are combined with passive TriPleX PI ...
Read Project

 10

 FINISHED 
ASTRON aims at the development of high-capacity, energy-efficient and bit-rate flexible optical transceivers capable of supporting rates from 10Gb/s to beyond 1Tb/s. The ASTRON concept is based on developing multi-functional and agile devices so as to achieve Terabit capacities on a single photonic integrated chip. ASTRON's transceiver can realize different techniques of flexible super-channel ge ...
Read Project

 14

 FINISHED 
The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10 Mbps while the capacity required only for watching one channel of HDTV is 20 Mbps.Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 mill ...
Read Project

 13